oversight

Alma HA, Alma, GA

Published by the Department of Housing and Urban Development, Office of Inspector General on 1998-01-20.

Below is a raw (and likely hideous) rendition of the original report. (PDF)

                                                                                    98-AT-201-1001




                             Audit Report
                             District Inspector General for Audit
                             Southeast/Caribbean District
                             Report: 98-AT-201-1001                     Issued: January 20, 1998



TO:            Harold Saether, Director, Public Housing Division, 4 APH


FROM:          Nancy H. Cooper
               District Inspector General for Audit - Southeast/Caribbean, 4AGA


SUBJECT:       Review of the Housing Authority of the City of Alma
               Alma, Georgia


We conducted a review of the Low Rent Public Housing, Comprehensive Grant, and Drug Elimination
Grant programs administered by the Housing Authority of the City of Alma, Georgia (AHA). We also
performed a limited review of the Tenant Opportunity Program (TOP) administered by the Alma
Resident Council Inc. (ARC). You requested the audit because AHA is designated as a Troubled
Public Housing Authority, and because your staff observed violations during an on site-management
review of AHA’s operations.

Within 60 days, please give us, for each recommendation in this report, a status report on: (1) the
corrective action taken; (2) the proposed corrective action and date to be completed; or (3) why action
is considered unnecessary. Also, please furnish us copies of any correspondence or directives issued
because of the audit.

If you have any questions, please contact James D. McKay, Assistant District Inspector General for
Audit, or Narcell Stamps, Senior Auditor, at (404 331-3369). We are providing a copy of this report
to AHA.
                                                                                     98-AT-201-1001




Executive Summary
We examined AHA and/or ARC’s operations related to the Comprehensive Grant, Drug Elimination
Grant, Tenant Opportunity Program, and Public Housing administration. We also reviewed AHA’s
controls over cash and tenant accounts receivable. The primary objective of the review was to
determine if AHA and ARC administered the programs according to HUD requirements. We also
reviewed selected expenditures to determine whether they were reasonable and necessary. We
recognize that ARC is a separate organization with responsibility for administering the Tenant
Opportunity Program. However, we included information about ARC in this report because ARC in
essence abdicated that responsibility to AHA. AHA and ARC violated HUD requirements for each
area covered by the audit objectives.

AHA’s prior Executive Director (ED), Board, and ARC mismanaged HUD programs. The
mismanagement adversely affected program operations and resulted in wasted funds. Specifically, the
ED, Board and ARC ignored program budgets, and did not implement several major components of
the Comprehensive Grant, Drug Elimination Grant, and Tenant Opportunity Programs. As a result the
programs did not meet their intended objectives. Also, tenants were not provided improved living
conditions and/or services that AHA and ARC represented to HUD that they would provide. Instead,
AHA spent the funds for other activities which were either not in the budgets or the amounts spent
substantially exceeded the budgets. These issues are discussed in the findings along with other
violations that include instances where AHA and/or ARC:

     •   Incurred $119,929 for costs that are not allowable.

     •   Incurred $592,732 in unsupported costs and diverted $28,198 in insurance proceeds from fire
         losses to pay other program costs.

     •   Obtained or made $150,976 in unauthorized loans.

     •   Failed to maintain proper accounting records for the Drug Elimination Grant and Tenant
         Opportunity Program.

We recommend HUD require AHA and or ARC to seek recovery of wasted funds. We also
recommend AHA and ARC improve controls needed to safeguard program assets.

We provided the draft report to AHA’s Board of Commissioners on October 10, 1997. We met with
it and ARC’s President to discuss the findings at an exit conference held on October 30, 1997. The
Board did not dispute the accuracy of the findings. We received the Board’s written response to the
findings on November 17, 1997. The Board stated that it was not aware of the significant issues
discussed in the report and that it will initiate actions to correct the violations and to prevent similar
occurrences in the future. ARC did not provide a written response.



                                                                                                       ii
                                                                                                    98-AT-201-1001




Table of Contents
Management Memorandum ......................................................................................i

Executive Summary.................................................................................................ii

Table of Contents ...................................................................................................iii

Introduction.............................................................................................................1

Findings and Recommendations

         1. AHA Mismanaged its Housing and Other HUD Funded Programs ..............3

         2. Mismanagement of the Tenant Opportunity Program ................................11

         3. AHA Did Not Follow Proper Procurement Practices in the Purchase of
            Professional and Construction Services ....................................................16

         4. AHA Needed to Improve Internal Controls and Accounting Records .........20

Internal Controls....................................................................................................23

Follow-up on Prior Audits .....................................................................................24

Appendices

         A. Schedule of Ineligible and Unsupported Costs........................................25
         B. Deficiencies in the Administration of the Comprehensive Grant
              Program ..............................................................................................26
         C. Auditee Comments .................................................................................32
         D. Distribution ............................................................................................34




                                                                                                                iii
                                                        98-AT-201-1001




Abbreviations:


ACC      Annual Contributions Contract
AHA      Alma Housing Authority
ARC      Alma Resident Council, Inc.
CFO      Chief Financial Officer
CFR      Code of Federal Regulations
ED       Executive Director
HUD      Department of Housing and Urban Development
OMB      Office of Management and Budget
PHMAP    Public Housing Management Assessment Program
PIH      Public and Indian Housing
TOP      Tenant Opportunity Program
TAR      Tenant Accounts Receivable
YMCA     Young Men’s Christian Association




                                                               iv
                                                                                  98-AT-201-1001




Introduction
BACKGROUND

Alma Housing Authority

AHA acts as the area’s housing authority under the authority of the revised Annual Contributions
Contract (ACC) number A-2736 with HUD dated June 10, 1996. AHA administered 8 public housing
projects consisting of 321 dwelling units.

     Organization AHA is governed by a five member Board of Commissioners chaired by
     Margaret Christmas. The Board is appointed by the Mayor of Alma, Georgia. During the period
     covered by the audit, John L. Miles, ED, was responsible for the administration of AHA’s HUD
     funded programs and maintenance of program accounting records. Mr. Miles resigned in June
     1997. AHA hired another ED in October 1997. The books and records are located at 410 East
     Twelfth Street, Alma, Georgia.

     Funding During 1995 and 1996 HUD approved $714,174 for operating subsidies, and
     $986,821 for its Comprehensive Grant and Drug Elimination Grant programs. HUD suspended
     grant funds in 1997 due to AHA’s ineffective program administration. The suspension remained
     in effect through the completion of our site work in October 1997.

     Management Performance HUD declared AHA to be a troubled agency on August 8, 1996,
     because of its low Public Housing Management Assessment Program (PHMAP) scores and the
     following other concerns:

         •   Questionable and ineligible Comprehensive Grant costs.
         •   Failure of PHMAP indicators such as modernization, energy consumption, slow unit turn
             around, and annual inspections.
         •   Poor management.
         •   Lack of proper maintenance.
         •   Commingling of funds.
         •   Inadequate file documentation.
         •   Failure to request wage determinations.
         •   Failure to comply with federal procurement regulations, condition of units, and high
             tenant accounts receivable .

     Independent Assessment During the audit, The Nelrod Company conducted an independent
     assessment of AHA’s performance under HUD’s PHMAP. Its report, issued April 16, 1997,
     cited numerous issues which required corrective action. The report cited deficiencies concerning
     the following issues which were more extensively covered by our audit:


                                                                                                  1
                                                                                     98-AT-201-1001


          •   Administrative problems with the Comprehensive Grant program.
          •   HUD approval not obtained for use of force account labor.
          •   High tenant accounts receivable.
          •   Inadequate distribution of salaries among benefiting programs.
          •   Inadequate tracking of insurance settlements for fire damage claims.

Alma Resident Council

ARC was responsible for administering a $100,000 TOP grant funded by HUD on October 18, 1995.
ARC is a separate tenant organization incorporated on April 20, 1994. We included ARC in the scope
of our audit because the organization allowed AHA’s prior ED to make or influence financial decisions
regarding ARC’s use of grant funds. Those decisions resulted in inappropriate and/or unsupported
expenditures which prevented the grant from achieving its objectives (Finding 2). ARC was governed
by a six member Board of Directors that included four officers (President, Vice President, Secretary,
and Treasurer). The President, Mary L. Fedrick, was responsible for supervising the administration of
the grant. ARC occupied office space within AHA’s administrative building located at 410 East
Twelfth Street, Alma, Georgia.

AUDIT OBJECTIVES, SCOPE AND METHODOLOGY

The primary objective of the audit was to determine whether AHA and ARC administered the
Comprehensive Grant, Drug Elimination Grant, Tenant Opportunity Program, and Public Housing
administration in an efficient, and economical manner. This included a determination as to whether
they administered the programs in compliance with applicable terms and conditions of the ACC, grant
agreements, laws, regulations, and other directives.

To accomplish the objectives we reviewed records at HUD’s Atlanta Office and at AHA and ARC
offices in Alma, Georgia. We also interviewed officials at HUD’s Atlanta Office, AHA and ARC,
tenants, and selected contractors. We conducted a limited inspection of the project grounds and
dwelling units. We used judgmental sampling methods during the audit which covered the period
January 1, 1995 through December 31, 1996. We provided some coverage for periods prior to and
after those dates to more fully develop certain issues. We conducted the review between January and
October 1997.

We performed the work in accordance with generally accepted government auditing standards.




                                                                                                  2
                                                                                    98-AT-201-1001



Findings
Finding 1

AHA Mismanaged its Housing and Other HUD Funded
Programs
AHA’s prior ED and Board mismanaged the authority's Low-Rent Housing, Comprehensive Grant,
and Drug Elimination Grant programs. The ED also exerted inappropriate influence over the TOP
program which resulted in misuse of grant funds (Finding 2). Specifically, AHA:

      •   Did not complete much of the work required by its Comprehensive Grant program and
          performed some work with poor quality.

      •   Did not fully implement its Drug Elimination Grant program.

      •   Did not adhere to program budgets.

      •   Incurred $79,290 for unallowed costs.

      •   Incurred $568,338 for unsupported costs.

      •   Obtained $150,976 in unauthorized loans.

      •   Had high tenant accounts receivables and write-offs.

      •   Misused insurance proceeds of $28,198 for fire losses.

These conditions occurred because the ED and the Board mismanaged the authority's operations.
AHA does not have nongovernment funds nor the means to raise such funds to compensate HUD for
the adverse financial impact its mismanagement has had on the project and tenants. As a result, tenants
were deprived of better living conditions and needed services. HUD money will be needed to duplicate
funding for work or services AHA should have already completed or provided. AHA's non-
compliance with program budgets was a substantial breach of its ACC and grant agreements with
HUD.




                                                                                                    3
                                                                                   98-AT-201-1001


PHYSCIAL IMPROVEMENTS NOT DONE AND REPAIRS POORLY DONE

AHA drew down and spent $1.3 million in Comprehensive Grant funds but did not complete many of
the physical improvements for which they drew the funds. The expenditures include the total budgets
for the 1993, 1994 and 1995 grants. We inspected 49 of 287 occupied units (17 percent) and found
that AHA made substantial progress towards completing only one major repair-handicapped
accessibility. We found only sporadic instances where AHA performed other major work items, such
as replacement of stoves and refrigerators. We identified $326,452 of budgeted repairs which AHA
did not complete even though it had spent the funds budgeted for them. AHA also did not complete
certain other work but we could not readily quantify the amounts without a full inspection of the
projects. AHA diverted funds budgeted and drawn down for physical improvements to cover
administrative cost overruns and routine maintenance. For some work items performed, we noted
instances of poor quality work. Appendix B provides additional details of physical improvements not
performed and repairs completed with poor quality workmanship.

PROGRAM BUDGETS IGNORED

24 Code of Federal Regulations (CFR) 85.30 requires the grantee to obtain HUD approval for changes
to the approved budget.

Section 407 (H) of AHA's ACC with HUD provides that during any fiscal year or other budget period
the authority shall not incur operating expenditures in excess of the amounts included in the approved
Operating Budget. Section 507 (2) states that a substantial breach occurs if the local authority, in
violation of Section 407, incurred total operating expenditures in excess of the amount budgeted.

The Comprehensive Grant Handbook 7485.3, Chapter 8, Section 9, requires the PHA to submit, for
prior approval, amendments to the approved Annual Statement where there are major changes to the
Annual Statement.

The ED generally disregarded program budgets. For example, AHA did not fill three key positions
budgeted at $38,944 for its Drug Elimination Program: two part-time Young Men’s Christian
Association (YMCA) youth counselors and a youth program coordinator. In its grant application,
AHA described these positions as key to the success of the drug program. The application presented
youth programs as having the greatest impact on breaking the cycle of poverty, crime, and neglect.
The cut back in scope prevented AHA from realizing the full benefit claimed in the application. If
AHA’s application had included the reduced scope, HUD may have reached a different decision about
funding the program. The ED could not provide a plausible explanation for not funding the positions.

For certain accounts selected for analysis, AHA overran the budgets by $228,310:

      Housing Programs - The ED spent $30,912 for personnel not included in the budget and
      $28,868 for salaries paid in excess of budgeted rates.

      Comprehensive Grant Program - The ED used $122,910 budgeted for repairs to pay
      administrative cost overruns.

                                                                                                   4
                                                                                     98-AT-201-1001


      Drug Elimination Grant Program - AHA exceeded its 1995 budget for certain line items by
      $45,620. The overrun included overpayments to consultants and fringe costs which exceeded
      the budget. The ED said he did not know about the overrun until we brought it to his attention.

The overruns contributed to unallowed and questioned costs.

UNALLOWED COSTS

To be allowable under a grant program, costs must be necessary and reasonable for the efficient
administration of the grant program. Costs are allocable to a particular cost objective to the extent of
benefit received by such objective (Office of Management and Budget (OMB) Circular A-87,
Attachment A, Sections C(1) (a) and C(2)(a)). OMB Circular A-87 also provides that costs of
amusements, social activities and incidental costs related thereto, such as meals, beverages, etc., are
unallowable.

Title 24 CFR Part 968.112 provides that routine maintenance costs are not allowable Comprehensive
Grant expenditures.

AHA incurred $79,290 for the following unallowed costs:

                                                                 Comp.              Drug
          Description            Total          Housing          Grant              Grant

         Consultant A          $ 28,282                         $ 3,501           $ 24,781
         CFO                     32,551         $ 32,551
         Other                   18,457             710          17,747
         Totals                $ 79,290         $ 33,261       $ 21,248           $ 24,781

      Consultant A - The consultant received payments in excess of the contract price and payment
      for telephone and supplies which were not provided in the contact terms.

      Chief Financial Officer's (CFO) Employment Contract - AHA paid the balance of the CFO
      employment contract salary and travel allowance after AHA terminated the contract. AHA had
      grounds to avoid the settlement payments, however the ED did not fully inform the Board about
      the performance issues to prevent the payments. The CFO was related to the ED. Also, during
      the course of the contract AHA paid $4,061 in excess of the contract rate.

      Other - AHA charged routine maintenance costs to the Comprehensive Grant program and
      costs for gifts, meals and advertisements to the Comprehensive Grant and housing programs.




                                                                                                     5
                                                                                   98-AT-201-1001


UNSUPPORTED COSTS

We identified the following unsupported costs:

                                                         Comp.                          Drug
             Description                Amount           Grant          Housing         Grant
         Force Account labor           $ 267,244       $ 267,244
         Salaries                         99,589          39,809         59,780
         Consultant A                     68,943          42,943                        26,000
         Consultant B                     15,202          15,202
         Travel                           44,275          37,850          6,425
         Other                            73,135          24,687         24,789         23,659
         Totals                        $ 568,388       $ 427,735       $ 90,994       $ 49,659


      Force Account Labor - AHA used force account labor to perform Comprehensive Grant
      improvement and routine maintenance repairs. However, AHA charged the total cost to the
      Comprehensive Grant program.

      Furthermore, AHA did not obtain HUD approval to use force account labor. HUD approval
      was required because AHA was not both an overall high performer and a modernization high
      performer under PHMAP. Accordingly, we questioned the total costs charged to the
      Comprehensive Grant program.

      Salaries - AHA improperly charged the Comprehensive Grant program for salaries for non-
      program staff and miscellaneous expenses. AHA charged the housing program for the salaries
      of six kitchen workers who were not included in the budget and for the salaries of three workers
      who were paid more than the budgeted rates. Further, AHA did not properly allocate salaries
      among benefiting programs. For instance, AHA charged 100 percent of the salaries for the
      coordinators of its Drug Elimination Grant and Comprehensive Grant programs to the respective
      programs. However, according to the two coordinators they spent most of their time
      performing AHA housing duties. AHA did not require the coordinators or the other staff to
      maintain time and attendance records to support how they actually spent their time.

      Consultant A The consultant was paid for Comprehensive Grant services which he did not
      perform. The ED could not explain why he paid the consultant to: (1) monitor the effectiveness
      of the program, (2) report on program improvement opportunities, and (3) establish program
      benchmark and performance indicators, even though he knew the consultant did not perform this
      work. The consultant was also paid for Drug Elimination Grant services which were not clearly
      defined in the contract (See Finding 3).

      Consultant B - Payments to the consultant were not supported by invoices.




                                                                                                   6
                                                                                       98-AT-201-1001


      Travel Costs - We questioned all travel charged to the Comprehensive Grant program. The
      program budget did not contain funds for travel. We examined $27,104 and determined that
      $17,662 of the amount was not necessary and reasonable and $8,712 was not supported by
      proper source documents. The $17,662 consisted of $7,776 for a weekend Board retreat at St.
      Simon's Island; $8,774 for two trips to Washington D.C.; and $1,112 for a trip to Pine
      Mountain, Georgia.

      Other - Other unsupported amounts included:

           $31,398 transferred by an inadequately supported journal voucher between accounts.

           $15,104 for payments to the local police department for budgeted services which were not
           covered by an executed contract.

           $16,350 paid to Consultant A for the preparation of various applications for funding. AHA
           did not document the procurement process followed (Finding 3) and we could not readily
           determine if the amounts paid were reasonable.

           $8,339 for fringe benefits in excess of the approved budget.

           $1,644 paid for travel which was not supported by expense vouchers or source documents.

           $300 for cellular phone services charged to the wrong grant.

UNAUTHORIZED LOANS

Article IV, Section 422, of the ACC states that the local authority shall not, without the approval of the
Government, obtain, from any source whatsoever, any loan in connection with the projects other than
those specifically provided for under the contract. 24 CFR Part 85.20 states that recipients shall
maintain effective control and accountability for all grant cash and assure that it is used solely for
authorized purposes.

AHA obtained unauthorized loans as follows:

                                                                      Outstanding at
                                                Original              June 30, 1997

         Bank Loans                             $ 77,000                  30,217
         Alma Resident Council                    38,692                  38,692
         Unfunded Security deposits               25,680                  25,680
         Tenant Escrow Funds                       9,604                       0

                        Total                  $ 150,976                $ 94,589




                                                                                                       7
                                                                                    98-AT-201-1001


      Bank Loans - AHA obtained two loans at a local bank to supplement its operations. The first
      loan, made on April 15, 1996, was for $32,000. The second loan, made on October 22, 1996,
      was for $45,000. AHA did not request and receive HUD approval to obtain the loans.

      Alma Resident Council - The ED inappropriately directed the president of ARC to disburse
      $38,692 directly to or on behalf of AHA. AHA used the funds for expenses such as force
      account payroll and to rent a facility used by its Step-Through Resident Training Program.
      AHA only recognized $6,650 of the $38,692 as an account payable to ARC.

      Security Deposits - AHA did not maintain a separate cash account or maintain cash sufficient to
      fund the liability for tenant security deposits. As of June 30, 1997, the general ledger showed a
      $25,680 liability for security deposits and a general fund cash balance of only $5,415.

      Tenant escrow funds - AHA inappropriately borrowed $9,604 withheld from workers’ salaries
      which should have been deposited to escrow accounts. The escrow accounts were for
      participants in AHA's work/training program. AHA withheld the funds from the workers’
      salaries so that the workers could accumulate cash for major purchases such as a down payment
      to purchase a home or vehicles. However, AHA did not make the deposit to the individuals’
      escrow account. Instead, it used the funds for current operations. AHA made some interim
      deposits but did not fully fund the liability until the individuals requested their money. AHA
      liquidated the liability by the time we completed our on site work.

ACCOUNTS RECEIVABLE AND COLLECTION LOSSES

AHA needed to improve management of its tenant accounts receivable (TAR). AHA had not
established and implemented an effective collection policy for tenant transactions. As of May 31, 1997,
accounts receivable amounted to $24,592 despite $37,120 in write-offs during the 19 months from
October 1995 through May 1997. To illustrate:

      High TAR balance - AHA had a high TAR balance of $24,592 at May 31, 1997. The balance
      consisted of $7,522 for tenants in possession and $17,070 for former tenants which AHA also
      needed to analyze for collectability. We examined $17,288 or 70 percent of the TAR and
      determined that:

           The receivables for tenants in possession primarily resulted from non aggressive action to
           collect rents (57 percent of sample) and large lump sum charges (e.g., damages) to tenant
           accounts (43 percent of sample). AHA had recently executed repayment agreements with
           tenants with high account balances and the tenants were generally current with their
           payments under the agreements.

           The balances for former tenants primarily resulted from large lump sum charges for items
           such as retroactive rents and damages noted prior to and at move-out (73 percent of
           sample) coupled with non aggressive action to collect rents when due (27 percent).




                                                                                                    8
                                                                                   98-AT-201-1001

      One AHA official stated that prior to the ED's resignation in June 1997 the authority did not
      attempt to collect rents due from former tenants. Since June, AHA began sending letters in an
      effort to collect rents due from tenants who moved from the project since January 1996.
      However, AHA still needs to establish and implement a formal collection policy.

      High Collection Losses - Between October 1995 and May 1996 AHA wrote off $37,120 to
      collection losses without documentation of Board approval.

                       Month and Year                                 Amount
                       October 1995                                   $ 1,538
                       December 1995                                   16,775
                       January 1996                                    10,499
                       February 1996                                      479
                       March 199                                          451
                       April 1996                                       2,603
                       May 1996                                         4,775

                               Total                                  $37,120

       We found no write-offs after May 1996.

INAPPROPRIATE USE OF INSURANCE PROCEEDS

Section 13, Paragraph B, of the ACC states that the Housing Authority shall, to the extent that
insurance proceeds permit, promptly restore, reconstruct, and/or repair any damaged or destroyed
property of a project, except with the written approval of HUD to the contrary.

AHA maintained no records to show what it did with $28,198 insurance proceeds. AHA should have
used the proceeds to repair the two fire damaged units (522 S. Bead Street and 507 Pope Drive).
However, AHA used Comprehensive Grant funds to repair the fire damaged roofs at the two units.
The use of Comprehensive Grant funds for the roof work further diminished the availability of grant
funds to accomplish program objectives (Appendix B).

AUDITEE COMMENTS

The Board of Commissioners did not dispute the finding. The Board said it was not aware of the
multitude of problems and the degree to which the Authority was being inadequately administered.
The Board said it was committed to correct the finding and ensure that similar situations do not occur
in the future. The Board identified several actions (some of which were underway) to resolve the
violations.




                                                                                                   9
                                                                                     98-AT-201-1001

RECOMMENDATIONS

In its written response, AHA recognized the need to improve operations and indicated that it has
initiated efforts to address the issues raised in this report. To ensure completion of those efforts and
resolution of the reported problems, we recommend that you:

1A.   Determine whether any of the ineligible and unsupported costs should be reclassified to other
      programs, obtain supporting documents or explanations for all unsupported costs, and require
      repayment of any ineligible activities or document why recovery is not possible.

1B.   Consult with HUD Legal Division on the feasibility of filing a claim under AHA’s employee
      liability policy for all disallowed costs.

1C.   Require AHA to modify, where necessary, the existing memorandum of agreement with HUD
      to include actions planned to correct the reported violations related to (a) program
      implementation; (b) compliance with budgets; (c) unsupported and unallowed program
      expenditures; (d) management of tenant accounts receivable and collection losses; (e) secondary
      loans for operating costs; and (f) management of insurance proceeds.

1D. Require AHA to submit monthly project financial status reports to HUD and the Board until you
    are satisfied that AHA has satisfactorily corrected the reported violations .

1E.   Continue to impose restrictions on AHA’s ability to draw program funds until it has
      demonstrated compliance with HUD requirements.




                                                                                                     10
                                                                                     98-AT-201-1001


Finding 2

MISMANAGEMENT OF THE TENANT OPPORTUNITY
PROGRAM
ARC mismanaged its TOP grant and used TOP grant funds for unauthorized purposes. ARC had
drawn down and spent $53,098 of its $100,000 grant and it owed an additional $26,624 recorded as an
accounts receivable in AHA's general ledger. Specifically, ARC:

       •    Disbursed $38,692 in TOP grant funds to AHA to subsidize AHA and/or other HUD
            grants. The disbursements were in effect unauthorized loans.

       •    Disbursed $21,434 for questionable consultant fees, and $4,857 for other unallowable and
            unsupported costs.

       •    Had not implemented several budgeted activities.

       •    Had not established formal accounting records to track grant revenues and expenditures.

These deficiencies resulted from ineffective ARC leadership and undue influence from the ED. As a
result, the TOP grant failed to achieve its purpose.

Title 24 CFR Part 85.40(d), provides that the grantee must immediately inform the Federal agency of
significant problems, delays, or adverse conditions which will materially impair the ability to meet the
objective of the award. The disclosure must include a statement of the action taken, or condition
contemplated, and any assistance needed to resolve the situation.

The president of ARC allowed AHA's ED to make decisions which inappropriately influenced the
administration and expenditure of TOP grant funds. We observed the following:

QUESTIONABLE LOANS AND PROGRAM EXPENDITURES

ARC had drawn down, spent, or obligated $79,772 of its TOP grant ($53,098 drawn down plus
$26,624 owed to AHA). We examined $69,439 of this amount. The results show that ARC made
payments of:

       •      $38,692 in unallowed payments directly to or on behalf of AHA. The payments were for
              AHA's Step Through Resident Training Program and they represented unauthorized
              loans to AHA (Finding 1). AHA had not reimbursed the amounts when we completed
              the on site review. As of May 31, 1997, AHA's ledger only showed $6,650 as an
              account payable to ARC.




                                                                                                     11
                                                                                    98-AT-201-1001


       •     $21,434 (62 percent of the total contract) to Consultant A without support that the
             consultant earned the fees. For instance, ARC could not provide documentation to
             show that the consultant performed any of the following major contract services:

                       Training related to group techniques, volunteers, and public relations (Section
                       III(a)).

                       Leadership development training related to franchising, team building, and
                       conflict resolution. ARC's president said they received some training related to
                       conducting meetings and the organization of community based groups.

                       General management training, managing human resources, supervision,
                       decision making, problem solving, time management, and communication skill
                       building.

                       The consultant contract required the firm to submit bills based on the
                       percentage of duties performed. Instead, the consultant invoiced ARC based
                       on the number of hours worked multiplied by the contract rate. The invoices
                       did not mention the contract duties performed.

       •   $1,947 for unallowed costs for utilities, an instructor's fee, and travel which were not
           provided for in the program work plan.

       •   $390 for unsupported costs for travel by the ED, ARC's president, and a student.

       •   $2,520 for the salary of ARC's President which was not included in the work plan.

ARC's President said the ED told her to write various checks to or on behalf of the authority because
the authority did not have the funds needed to pay bills. The ED had no authority to direct ARC's use
of the grant, especially for unauthorized purposes.




                                                                                                    12
                                                                                      98-AT-201-1001


PROPOSED ACTIVITIES NOT IMPLEMENTED

Article IV of the grant agreement states that a request by the grantee to draw down grant funds under
the Line of Credit Control System is representation by the grantee that it is complying with the terms of
the grant agreement. To the contrary, ARC drew down, spent or obligated 80 percent of the grant but
it had not implemented or made substantial progress toward implementing the following activities for
which it drew the funds:

                 Task                          Budget             Spent           Activity Status

        1. Organize Community                  $ 2,800           $ 2,800             Incomplete
           and operating procedures
        2. Technical assistance                  2,200             2,200             Incomplete
        3. Consultants                          50,000            45,098             Incomplete
        4. Miscellaneous                        33,000             3,000             Incomplete


Under task number 1 ARC did not develop the required program accounting procedures. For task 2, it
did not develop a job description for the resident coordinator nor integrate and assign new members to
committees. For task 3 ARC drew $45,098 for consultants and deposited the funds to its checking
account. However, ARC only spent $5,913 of that amount for consultants (excluding $15,521 paid by
AHA and recorded as accounts receivable on AHA's ledger). ARC spent the remaining $39,185 for
other purposes which included payments to AHA (finding 1 - unauthorized loans). Thus, ARC
provided HUD with misleading and/or false certifications to obtain the funds.

ARC's President said she was not aware of the program's work plan until HUD's June 1997 monitoring
visit. By that time, ARC had spent the $53,068 drawn against the grant and AHA had recorded the
$26,624 receivable.

FINANCIAL MANAGEMENT SYSTEM NOT IMPLEMENTED

Title 24 CFR Part 84.21 (b)(3) states that the recipient's financial management system shall provide for
effective controls over and accountability for all funds, property and other assets. Recipients shall
adequately safeguard all such assets and assure they are used solely for authorized purposes. Article V
of the Grant Agreement states that all records shall be kept in an orderly manner that permits
examination at any time by a duly authorized representative of the Secretary of HUD.

ARC did not establish and maintain formal accounting records (e.g., general ledger, cash receipt
journal, and cash disbursement journals) to track program revenues and expenditures. Instead, ARC
used a checking account and a check register to track deposits and checks. The lack of formal records
was significant considering that ARC had drawn down and spent $53,098 of its $100,000 grant and
owed AHA an additional $26,624. ARC's records did not distinguish between checks which
represented program expenditures and those which represented advances to AHA.




                                                                                                      13
                                                                                  98-AT-201-1001

Furthermore, ARC misrepresented the adequacy of its financial management system to HUD. On
April 27, 1996 ARC contracted with a certified public accountant (CPA) to provide monthly
monitoring of program income and expenses and a final close-out audit for its TOP grant. On May
23, 1996, the CPA wrote HUD and made the following representations:

      "... the Alma Resident Council has established a financial management system that is in
      compliance with the financial and program management standards of OMB Circular A-110,"

      "... the Alma Resident Council is in compliance with HUD regulations concerning resident
      TOP/TAG grants which requires that a certified public accountant be engaged to perform
      professional accounting and auditing services."

The CPA never performed work under the contract and we found no evidence of the cited financial
compliance. We interviewed the CPA who stated the firm wrote the letter anticipating that ARC
would follow through on the contract in which case the CPA would have established the systems
mentioned in the letter to HUD. However, ARC did not follow through with the contract and the
systems were never established.

                       *******************************************

AUDITEE COMMENTS

ARC did not provide formal comments.

RECOMMENDATIONS

We recommend that you:

2A.     Determine whether any of the ineligible and unsupported costs should be reclassified to other
       programs, obtain supporting documents or explanations for all unsupported costs, and require
       repayment of any ineligible activities or document why recovery is not possible.

2B.    Require ARC to cancel the contract with Consultant A on grounds of default and require the
       consultant to reimburse ARC for payments it received for services that it did not perform.

2C.    Consult with HUD Legal Division on the feasibility of filing a claim under AHA’s employee
       liability policy for disallowed costs.

2D.    Require ARC to develop and submit for your approval a plan for correcting the reported
       violations and for spending the remaining grant funds. The plans should include specific
       actions ARC will implement to resolve its inadequate (a) controls over program expenditures,
       (b) implementation of approved activities; and (c) financial management.

2E.    Require ARC to submit periodic financial status reports to HUD until you are satisfied that
       ARC has corrected the reported violations .

                                                                                                  14
                                                                        98-AT-201-1001

2F.   Continue to impose restrictions on ARC’s ability to draw program funds until it has
      demonstrated compliance with HUD requirements.

2G.   Require ARC to obtain a competent program manager who has the ability to properly
      administer the program.




                                                                                      15
                                                                                   98-AT-201-1001


FINDING 3
AHA DID NOT FOLLOW PROPER PROCUREMENT
PRACTICES IN THE PURCHASE OF PROFESSIONAL
AND CONSTRUCTION SERVICES
AHA and ARC did not follow or document compliance with competitive procurement requirements in
the purchase of contract services. They obligated or paid $165,700 for consulting and related services
but did not:

       • Document the competitive process followed (including cost or price analysis).

       • Prohibit actions which provided or gave the appearance of an unfair competitive advantage.

       • Include required provisions in contracts.

       • Document the basis for using time and material compensation methods for consultant
         contracts.

As a result, we could not determine if AHA and ARC purchased the services at the most competitive
rates.

COMPETITIVE PROCEDURES NOT FOLLOWED OR DOCUMENTED

All procurement transactions must be conducted in a manner to provide full and open competition
(Title 24 CFR 85.36, paragraph (c)(1). Proposals must be solicited from an adequate number of
qualified sources (Title 24 CFR 85.36, paragraph (d)(3)(ii)). Grantees and subgrantees must perform a
cost or price analysis in connection with every procurement action (Title 24 CFR 85.36, paragraph
(f)(2)).

AHA and ARC purchased or obligated $165,700 for consulting and other professional services without
following or documenting compliance with procurement regulations:

      Firm        Date Executed                Program                        Amount
                  Consultant Services
       A             10/15/94                  Comprehensive Grant              20,000
       A             06/15/95                  Comprehensive Grant              24,500
       A             11/02/96                  Comprehensive Grant              21,000
       A             09/19/95                  Drug Elimination Grant           10,000
       A             02/06/96                  Drug Elimination Grant           16,000
       A             11/27/95                  Alma Resident Council            35,000
       B             12/15/95                  Cross Program Services           21,600
       Subtotal - Consulting Services                                         $148,100

                                                                                                   16
                                                                                   98-AT-201-1001

       Other services
       A          04/21/94 Comprehensive Grant update                            $2,100
       A          03/03/95 Application for Youth Sports                           2,500
       A          04/19/96 Application for Youth Build                            6,000
       A          07/08/96 Application for adult literacy                         1,500
       A          07/08/96 Application for children services                      1,000
       A          07/08/96 Proposal for job training program                      1,500
       A          09/03/96 Application for economic development                   3,000
                  Subtotal Other services                                      $ 17,600

       Total                                                                  $165,700

AHA made repetitive awards to contractor A without maintaining any documentation to show how it
identified and selected the firm.

We found no evidence that AHA or ARC followed competitive procedures prior to awarding contracts
for the above services. We also found no evidence that AHA or ARC completed a price or cost
analysis prior to the procurements. The absence of competition and a cost or price analysis prevented
us from determining whether any of the services were purchased at competitive and reasonable rates.
ARC could not locate records related to the procurement and said they selected contractor A based on
a recommendation by AHA's ED. ARC's president did not know if contractor A was the low bidder.

UNFAIR COMPETITIVE ADVANTAGE

Title 24 CFR Part 85.36 states that all procurement transactions shall be conducted in a manner to
provide to the maximum extent practical, open and free competition. In order to ensure objective
contractor performance and eliminate unfair competitive advantage, contractors that develop or draft
specifications and invitations for bids and/or requests for proposals shall be excluded from competing
for such procurement.

ARC awarded the TOP grant consulting contract to Contractor A even though, according to ARC’s
president, the firm helped prepare the procurement proposal. The firm's inside information provided it
with an unfair competitive advantage. We found no record of the competitive process followed.

FLAWED OR MISSING CONTRACT PROVISIONS

The two Drug Elimination Grant contracts with Contractor A contained basically the same scope of
services and the contract periods overlapped. The first contract (for $10,000) covered the period
September 15, 1995 through August 31, 1996. The second contract (for $16,000) covered the period
February 1, 1996 through July 31, 1996.




                                                                                                   17
                                                                                     98-AT-201-1001

The three Comprehensive Grant agreements with Contractor A omitted program monitoring which
was a service called for in the five year plan. The contracts basically repeated the same scope of
services. Also they lacked details about how and when the contractor would complete and present
information concerning the development of macro training systems, guidelines for the Step-Through-
Program, and resident organizations, businesses, and partnerships. We also noted that the three
contracts did not specify time periods for contractor performance.

Furthermore, neither of the agreements with contractors A and B contained required provisions related
to (a) grantor and grantee access to records; (b) termination for cause and for convenience (this
provision was in ARC's agreement with contractor A); (c) record retention; (d) administrative
procedures (e.g., legal remedies for violation or breach of contract, sanctions, penalties); and (e)
reporting requirements.

INAPPROPRIATE CONTRACT TYPE

AHA inappropriately used time and material type contracts for the three agreements executed with
contractor A for the Comprehensive Grant program totaling $65,500. We noticed the same problem
for two other prior agreements (1993 and 1994) with the contractor for the same program.

Title 24 CFR 85.36 states that the grantee and subgrantee will use time and material type contracts
only after a determination that no other contract is suitable. AHA did not document the basis for using
this restricted type of contract.

                       *****************************************

We attribute the forgoing issues to mismanagement by AHA's ED and ARC's president. We also
attribute these conditions to a failure by the authority's Board to properly monitor the ED's
performance. In Finding 1 we questioned payments to contractors A and B due to concerns about (a)
the reasonableness of the price, (b) whether contractor A earned the fees paid, and (d) missing invoices
for payments to contractor B. Accordingly, we did not question the contract amounts in this finding.


AUDITEE COMMENTS

The Board of Commissioners did not dispute the finding. The Board said it was not aware of the
multitude of problems, and the degree to which the Authority was being inadequately administered.
The Board said it was committed to correct the finding and ensure that similar situations do not occur
in the future. The Board identified several actions (some of which were underway) planned to resolve
the violations cited in the audit.




                                                                                                     18
                                                                           98-AT-201-1001


RECOMMENDATION

We recommend that you require AHA and ARC to:

3A.   Establish and implement procurement policies and procedures to achieve compliance with
      Federal and local requirements, including:

      •      Performing cost or price analysis for procurement actions.
      •      Properly documenting the basis for contract awards.
      •      Prohibiting actions which provide or give the appearance of unfair competitive
             advantage.
      •      Incorporating required provisions in contracts.




                                                                                         19
                                                                                    98-AT-201-1001


FINDING 4

AHA NEEDED TO IMPROVE INTERNAL CONTROLS
AND ACCOUNTING RECORDS
AHA did not maintain adequate internal controls to safeguard revenues and did not maintain proper
accounting records for its Drug Elimination Grant program. This increased the opportunity for
undetected misappropriation. The improper accounting records also prevented AHA's ability to
identify and monitor costs by budget line item. This was important considering that AHA failed to
implement certain components of the program and overran certain budget line items (Finding 1). These
weaknesses occurred because the ED did not properly manage the authority's financial affairs.

Title 24 CFR 85.21 states the recipient is required to: (1) maintain effective controls over and
accountability for all funds, property, and other assets and (2) maintain a financial management system
that shall provide accounting records that adequately discloses the source and application of funds.
Section II of Accounting Guidebook 7510.1 also provides guidance on safeguarding cash and other
assets.

POOR INTERNAL CONTROLS

Segregation of Duties - AHA did not adequately segregate duties among employees who handled
cash, accounting records, and authorizations for accounting transactions. For instance, AHA had
several employees, but each was allowed to collect rent, post collections to tenant accounts, and
prepare bank deposits. AHA also allowed the hourly employee who prepared payroll to calculate her
own payroll without any supervisory review and approval. AHA had sufficient staff to prevent any one
employee from having too much control over the transaction process.

Cash Receipts - AHA did not maintain proper controls over cash transactions and we could not
account for the deposit of collections totaling $1,085. In addition to its official prenumbered
computerized receipts, AHA concurrently used three manual receipt books for collections. The manual
records undermined the controls afforded by the computerized system. The computerized system
automatically generated a prenumbered receipt for collections and posted the collection to tenant
accounts. One of the three unofficial books contained pre-numbered receipts but the other two did
not. From January 1995 to December 1996, the receipts issued from the three books totaled $16,842.

We reviewed $4,706 of that amount to determine if the collections were deposited. We determined
that:

      $685 in deposits could not be accounted for. AHA staff provided various reasons, which we
      could not confirm, as to why we could not trace the $685 to bank deposits. For instance they
      said that on occasion they collected funds from prospective tenants prior to move-in and placed
      the funds in the safe. They said they either deposited the funds after the tenant moved in or
      returned them to the prospective tenants. AHA could not support whether or not this was the
      case for the $685.

                                                                                                    20
                                                                                   98-AT-201-1001

      AHA waited 46 days to deposit a $189 collection.

In addition, AHA could not account for the deposit of $400 withdrawn from tenant escrow accounts
for redeposit to the authority's master account. Furthermore, we found that:

      No one logged in checks received through the mail,

      Different employees had access to the cash drawer and collected revenues, and

      AHA allowed a person who had embezzled funds to open and distribute the mail (which
      contained checks), collect and post revenues, and write checks. AHA hired the individual
      immediately after being released from prison for embezzlement. AHA's blanket fidelity bond
      contained a provision which excluded coverage of individuals convicted of such a crime.

Adjustments to Tenant Accounts - AHA did not maintain proper control over adjustments to tenant
accounts receivable. AHA allowed employees who collected rents, posted tenant accounts and made
deposits to also initiate and post adjustments to the accounts. AHA did not require supervisory review
and authorizations for the adjustments.

We judgmentally selected 11 adjustments for the period January 1, 1997 to July 31, 1997 and found
that they:

      Contained no evidence of supervisory review and approval.

      Were generally prepared by individuals who also collected rents, posted tenant accounts, and
      made deposits.

These weaknesses inherently increased the opportunity for undetected error or fraud.

ACCOUNTING RECORDS

Account Classifications (Drug Elimination Grant) - AHA had not established the general ledger
accounts needed to record and track Drug Elimination Grant costs by budget line item. AHA charged
all program costs to two general accounts (account 9110 for law enforcement and account 9160 for
drug prevention). We had to analyze the activity in the two accounts to identify expenditures by type
in order to determine how the expenditures compared to budget. The absence of this information
contributed to the budget overruns discussed in Finding 1.

Review and Approval of Payroll (All Programs) - AHA did not obtain or require supervisory
approval of leave and time records prepared to support the payroll for hourly workers.

Documentation for Travel (All Programs) - AHA's travel policy required receipts for all lodging
costs. Additionally, it required that actual expense reimbursement for all items be supported by
receipts and other documentation of actual expense for all expenses over $25.00. Furthermore, it
required a written authorization by the ED whenever automobile travel was involved.

                                                                                                   21
                                                                                    98-AT-201-1001

AHA generally did not maintain credit card receipts to support travel expenses and it did not obtain or
maintain the ED's written authorization for automobile travel. The ED said they did not keep copies of
credit card receipts because they used the credit card statement as the receipt. Also, AHA staff were
not consistent in their preparation of travel expense vouchers. We found only sporadic instances where
AHA staff prepared travel expense vouchers.

AUDITEE COMMENTS

The Board of Commissioners did not dispute the finding. The Board said it was not aware of the
multitude of problems, and the degree to which the Authority was being inadequately administered.
The Board said it was committed to correct the finding and ensure that similar situations do not occur
in the future. The Board identified several actions (some of which were underway) planned to resolve
the violations cited in the audit.

RECOMMENDATIONS

We recommend that you require AHA to:

4A.    Implement proper segregation of duties and other internal controls for cash, tenant
       accounts receivable, tenant escrow accounts, approval of payroll, and documentation for
       expenses.

4B.    Establish appropriate accounting records and account classifications for the Drug
       Elimination Grant program.




                                                                                                    22
                                                                                     98-AT-201-1001




Internal Controls
In planning and performing our audit, we considered the AHA’s internal controls in order to determine
auditing procedures and not to provide assurance on internal controls. Internal control is a process by
which an entity obtains reasonable assurance as to achievement of specified objectives. Internal
controls consist of interrelated components, including integrity, ethical values, competence, and the
control environment which includes establishing objectives, risk assessment, information systems,
control procedures, communication, managing change, and monitoring.

We determined that the following internal control categories were relevant to our audit objectives:

    •   Grantee program management

    •   Procurement

    •   Cost allowability and reasonableness

We assessed these relevant controls. We also obtained an understanding of AHA procedures and
HUD requirements and assessed control risk. Due to weak controls we did not rely on AHA’s internal
control procedures. Because of weak controls we performed extensive substantive testing to
determine what effect the weak controls had on program operations.

A significant weakness exists if internal control does not give reasonable assurance that the entity's
goals and objectives are met; that resource use is consistent with laws, regulations, and policies; that
resources are safeguarded against waste, loss, and misuse; and that reliable data is obtained,
maintained, and fairly disclosed in reports.

Based on our review, significant weaknesses existed in the controls we tested as discussed in the
findings.




                                                                                                      23
                                                                                      98-AT-201-1001



Follow-up on Prior Audits
This was the first OIG audit of AHA and ARC’s operations.

The last Independent Auditor (IA) audit report was completed by Donald G. Crews, Certified Public
Accountant, for the year ended December 31, 1995. The report disclosed the following deficiencies in
AHA’s operations which are also discussed in the findings of this report:

      •   Failure to update its procurement procedures to conform with current requirements.

      •   Improper charging of costs to its modernization programs.

      •   Failure to properly allocate administrative salaries among benefiting activities.

      •   High tenant accounts receivables and collection losses.




                                                                                                 24
                                                                                          98-AT-201-1001



Appendices
                                                                                        Appendix A

         Schedule of Ineligible And Unsupported Costs


                                        Amounts                             Amounts
    Recommendations                     Ineligible1                        Unsupported2

             1A                           $79,290                            $568,388
                                                                               28,198

             2A                           38,692                                21,434
                                           1,947                                   390
                                                                                 2,520

    Totals                             $119,929                              $620,930




1
    Ineligible amounts obviously violate law, contract, HUD or local agency policies or regulations.
2
    Unsupported amounts do not obviously violate law, contract, policy or regulation, but warrant being
    contested for various reasons such as the lack of satisfactory documentation to support eligibility and
    HUD approval.


                                                                                                        25
                                                                                 98-AT-201-1001


                                                                                Appendix B

DEFICIENCIES IN THE ADMINISTRATION OF THE
COMPREHENSIVE GRANT PROGRAM
SUMMARY

AHA wasted a substantial portion of its $1.3 million in Comprehensive Grant funds due to
mismanagement. The ED, whose performance was not properly monitored by the Board, ignored the
program's objective and budget. The ED (as discussed in Finding 1) used funds budgeted for physical
improvements to pay force account workers who primarily performed unallowable routine maintenance
work. The ED also diverted over $120,000 budgeted for physical improvements to fund unjustified
administrative budget overruns. As a result, AHA spent over $800,000 budgeted for major physical
improvements with virtually no progress toward completing many of the repairs.

REQUIREMENTS

PHAs are required to complete their Comprehensive Grant program in accordance with the five-year
Action Plan approved by HUD. The approved Comprehensive Grant Plan (which incorporates the
five-year Action Plan) is binding upon HUD and the PHA until such time the PHA submits, and HUD
approves, an amendment (Title 24 CFR 968.320 (c). PHAs are required to obtain prior HUD
approval for any additional work categories which were not included in the approved five-year Action
Plan. They are also required to advise HUD of program changes as part of their Annual Performance
and Evaluation Report. [(Title 24 CFR 968.325 (h)].

DETAILS

Work Not Performed - AHA, despite having spent all funds budgeted for its 1993, 1994, and 1995
grants, did not perform certain repairs budgeted at $326,452. We detected the omitted work from the
inspection of 49 of 287 occupied units (17 percent). We also observed that AHA's 1993 program
budget included $14,931 to renovate kitchens at project 133-4. AHA reported $14,355 of the work to
be completed even though the project did not have kitchens. The omitted work ($326,452) was for the
following items:

      Work Category                     Budget               Project Number

      Energy conservation              $ 101,618             133-1, 4, and 7
      Lead based paint                    66,300             133-1
      Interior Surfaces                   56,913             133-4, 5, and 7
      Renovate Bathrooms                  51,932             133-4, 5, and 7
      Interior doors                      18,836             133-4, and 7
      Playground equipment                17,815             133-1 and 7



                                                                                                 26
                                                                                 98-AT-201-1001

      Paint                                 4,938                133-5
      Storm windows / gutters               3,500                133-5
      Storm doors                           2,500                133-5
      Fluorescent lights                    2,100                133-5
                        Total            $326,452

The inspections revealed the following substandard conditions.

      Substandard Conditions                   Units Affected

      Interior painting                               38
      Damaged floors/Tub tile                         17
      Damaged interior surfaces                       15
      Exterior Doors                                  13
      Stoves (old/rusted units)                       11
      Refrigerators (old/rusted units)                11
      Weather-stripping                               10
      Cracks in Foundation                            17
      Defective Base Board                            07
      Insects/Roaches and Termites                    13
      Screen Doors                                    04
      Faucet/Water Leaks                              06
      Old/Leaking Roofs                               07

We recognize that work related to some of the foregoing items were not budgeted in the 1993, 1994,
and 1995 grants (e.g., stoves and refrigerators for some projects). However, we looked for the items
because AHA did not complete much of the work included in the 1993, 1994, and 1995 budgets. We
wanted to determine if AHA used the funds for other repairs included in its Five Year Plan. They did
not.




                                                                                                 27
                                                                                  98-AT-201-1001

The following pictures illustrates the substandard conditions some tenants had to contend with due to
AHA's ineffective administration of the grant and its ineffective use of funds:




Picture #1 - Badly rusted refrigerator, 801 N. Wayne Street Queen City Heights Project (001)




Picture #2 - Badly rusted stove 808 E. 20th Street Washington Heights Project (003)

                                                                                                  28
                                                                                  98-AT-201-1001




Picture #3 - Damaged interior surface 533 E. 12th Street Albert Pitts Homes Project (007)




Picture #4 - Peeling paint and possible termite damage,113 Mullis Drive, Wilfred B. Terrace (008)

                                                                                                    29
                                                                                   98-AT-201-1001




Picture #5 - Old exterior door, 512 E. 14th Street, Albert Pitts, Homes Project (007)

Poor Quality Work - We also noted that some repairs made by AHA's force account labor crew were
of poor quality and incomplete. For example, we found instances where the workers did a poor job
patching holes in walls. We also found instances where AHA started painting a unit damaged by fire in
1994 but never finished the work . The wall still contained the residue from smoke. The following
pictures illustrate the conditions found:




Picture #6 - Unfinished repair of hole in wall, 808 E. 20th Street, Washington Heights (003)



                                                                                                  30
                                                                                  98-AT-201-1001




Picture #7 - Painting not finished from fire damage, 808 E. 20th Street, Washington Heights




                                                                                              31
                   98-AT-201-1001


                   Appendix C
Auditee Comments




                              32
98-AT-201-1001




           33
                                                                            98-AT-201-1001

                                                                          Appendix D

                                     Distribution

Secretary's Representative, 4AS
Director, Office of Public Housing, 4APH
Director, Administrative Service Center, 4AA
Audit Liaison Officer, 3AFI
Director, Accounting Division, 4AFF
Acquisitions Librarian, Library, AS (Room 8141)
Chief Financial Officer, F (Room 10164)
Deputy Chief Financial Officer for Finances, FF (Room 10166)
Director, Housing and Community Development, Issue Area, U.S. GAO, 441 G Street, NW,
     Room 2474 Washington, DC 20548 ATTN: Judy England-Joseph
Counsel to the IG, GC (Room 8260)
HUD OIG Webmaster-Electronic format via Electronic mail-Morris_F._Grissom@Hud.Gov
Director, Office of Public and Indian Housing Comptroller, PF
     ATTN: Audit Liaison Officer (Room 4122)
Director, General Management Division, PMG (Room 4216)
Assistant to the Deputy Secretary for Field Management, SDF (Room 7106)
Assistant to the Secretary for Labor Relations (Acting), SL (Room 7118
The Honorable Fred Thompson, Chairman, Committee on Governmental Affairs,
     United States Senate, Washington, DC 20510-6250
The Honorable John Glenn, Ranking Member, Committee on Governmental Affairs,
     United States Senate, Washington, DC 20510-6250
Mr. Pete Sessions, Government Reform and Oversight Committee, Congress of the
     United States, House of Representatives, Washington, DC 20515-4305
Ms. Cindy Sprunger, Subcommittee on General Oversight and Investigations,
     Room 212, O'Neill House Office Building, Washington, DC
Housing Authority of the City of Alma, Georgia
Board of Commissioners, Housing Authority of the City of Alma, Georgia
Mayor, City of Alma, Georgia
President, Alma Resident Counsel




                                                                                       34