U.S. OFFICE OF PERSONNEL MANAGEMENT
   OFFICE OF THE INSPECTOR GENERAL
            OFFICE OF AUDITS




 Final Audit Report
AUDIT OF THE INFORMATION TECHNOLOGY
       SECURITY CONTROLS OF THE
U.S. OFFICE OF PERSONNEL MANAGEMENT’S
 CONSOLIDATED BUSINESS INFORMATION
                 SYSTEM
         Report Number 4A-CF-00-17-043
               September 29, 2017




                 -- CAUTION --
                EXECUTIVE SUMMARY
                               Audit of the Information Technology Security Controls of the
                                          U.S. Office of Personnel Management’s 

                                         Consolidated Business Information System

Report No. 4A-CF-00-17-043                                                                               September 29, 2017


Why Did We Conduct the Audit?               What Did We Find?

The Consolidated Business Information       Our audit of the IT security controls of CBIS determined that:
System (CBIS) is one of the U.S. Office
of Personnel Management’s (OPM) major       	   A Security Assessment and Authorization of CBIS was completed in
Information Technology (IT) systems. The         2017. An authorization to operate was granted for up to three years.
Digital Accountability and Transparency
Act of 2014 and the Federal Information     	   The security categorization of CBIS is consistent with Federal
Security Modernization Act (FISMA)               Information Processing Standards 199 and NIST Special Publication
require that the Office of the Inspector         (SP) 800-60, and we agree with the categorization of “moderate.”
General (OIG) perform an audit of IT
security controls of this system.           	   OPM has completed a Privacy Impact Assessment for CBIS.

What Did We Audit?                          	   The CBIS System Security Plan generally follows the OCIO template,
                                                 but there were instances where the documentation was incomplete.
The OIG has completed a performance
audit of CBIS to ensure that the system’s   	   An independent security controls assessment has been performed for
security controls meet the standards             CBIS, but elements of the test work were missing and/or incomplete and
established by FISMA, the National               not all of the identified control weaknesses were included in the CBIS
Institute of Standards and Technology            risk assessment.
(NIST), the Federal Information Security
Controls Audit Manual and OPM’s Office      	   CBIS has been subject to routine testing as part of OPM continuous
of the Chief Information Officer (OCIO).         monitoring.

                                            	   A contingency plan was developed for CBIS that is generally in
                                                 compliance with NIST SP 800-34 Revision 1 and OCIO guidance.

                                            	   The CBIS Plan of Action and Milestones (POA&M) documentation did
                                                 not include all required information and known weaknesses, and did not
                                                 accurately reflect targeted weakness remediation deadlines.

                                            	 We evaluated a subset of the system controls outlined in NIST SP 800-
                                               53 Revision 4. We determined most of security controls tested appear to
                                               be in compliance, however we did note one area for improvement.

 ______________________
 Michael R. Esser
 Assistant Inspector General
 for Audits
                                                        i
                      ABBREVIATIONS

ATO             Authorization to Operate
CBIS            Consolidated Business Information System
DATA Act        Digital Accountability and Transparency Act
FIPS            Federal Information Processing Standards
FISMA           Federal Information Security Management Act
GAO             U.S. Government Accountability Office
ISCMP           Information Security Continuous Monitoring Plan
IT              Information Technology
IG              Inspector General
MRB             Management Review Board
NIST            National Institute of Standards and Technology
OCFO            Office of the Chief Financial Officer
OCIO            Office of the Chief Information Officer
OIG             Office of the Inspector General
OMB             U.S. Office of Management and Budget
OPM             U.S. Office of Personnel Management
POA&M           Plan of Action and Milestones
PIA             Privacy Impact Analysis
PTA             Privacy Threshold Analysis
Authorization   Security Assessment and Authorization
SAR             Security Assessment Report
SP              Special Publication
SSP             System Security Plan




                                      ii
                         TABLE OF CONTENTS

                                                                                                            Page 

       EXECUTIVE SUMMARY ........................................................................................ i


       ABBREVIATIONS ..................................................................................................... ii 


I.     BACKGROUND ..........................................................................................................1 


II.    OBJECTIVES, SCOPE, AND METHODOLOGY ..................................................2 


III.   AUDIT FINDINGS AND RECOMMENDATIONS.................................................5


       A. Security Assessment and Authorization .................................................................5 


       B. FIPS 199 Analysis ...................................................................................................5 


       C. Privacy Impact Assessment .....................................................................................6 


       D. System Security Plan ...............................................................................................6 


       E. Security Assessment Plan and Report .....................................................................8 


       F. Continuous Monitoring..........................................................................................10 


       G. Contingency Planning and Contingency Plan Testing...........................................11 


       H. Plan of Action and Milestones Process..................................................................12 


       I. NIST 800-53 Evaluation ........................................................................................14 


       APPENDIX: OPM’s August 18, 2017, response to the draft audit report, issued
                 August 2, 2017.

       REPORT FRAUD, WASTE, AND MISMANAGEMENT
            I. BACKGROUND
IV. MAJOR CONTRIBUTORS TO THIS REPORT

On December 17, 2002, President Bush signed into law the E-Government Act (P.L. 107-347),
which includes Title III, the Federal Information Security Management Act. It requires (1)
annual agency program reviews, (2) annual Inspector General (IG) evaluations, (3) agency
reporting to the U.S. Office of Management and Budget (OMB) the results of IG evaluations for
unclassified systems, and (4) an annual OMB report to Congress summarizing the material
received from agencies. In 2014, Public Law 113-283, the Federal Information Security
Modernization Act (FISMA) was established and reaffirmed the objectives of the prior Act. As
part of our evaluation, we will review the Office of Personnel Management’s (OPM) FISMA
compliance strategy and document the status of their compliance efforts.

On May 9, 2014, the President signed into law the Digital Accountability and Transparency Act
of 2014 (DATA Act) (P.L. 113-101), which includes Section 6, Accountability for Federal
Funding. It requires the Office of the Inspector General (OIG) to (1) conduct a review of a
statistically valid sampling of the spending data submitted under the DATA Act by the Federal
agency; and (2) submit to Congress and make publically available a report assessing the
completeness, timeliness, quality, and accuracy of the data sampled and the implementation and
use of data standards by the Federal agency. In accordance with the DATA Act, we are
conducting an evaluation of OPM’s systems, processes, and internal controls in place over
financial data management.

OPM’s Consolidated Business Information System (CBIS) is used by the Office of the Chief
Financial Officer (OCFO) to manage the financial resources and obligations of OPM. CBIS’s
functionality includes management of the agency’s general ledger, accounts payable, accounts
receivable, purchasing, procurement, and budgeting processes. CBIS is one of the agency’s
major information technology (IT) systems and a key system providing data for DATA Act
reporting. As such, FISMA and the DATA Act require that the OIG perform an audit of IT
security controls of this system.

OPM recently moved the CBIS technical infrastructure to a new technical environment – a
shared service provider managed by another government agency.

OPM’s Office of the Chief Information Officer (OCIO) and OCFO, in conjunction with the
external shared service provider, share responsibility for implementing and managing the IT
security controls of CBIS. We discussed the results of our audit with the OCIO and the OCFO
representatives at an exit conference.
                                               1                  Report No. 4A-CF-00-17-043
IV. OBJECTIVES,
II.  MAJOR CONTRIBUTORS
                SCOPE, ANDTO THIS REPORT
                          METHODOLOGY

 OBJECTIVES

 Our goal was to perform an evaluation of the security controls for CBIS to ensure that the OCIO
 and the OCFO officials have managed the implementation of IT security policies and procedures
 in accordance with standards established by FISMA, the National Institute of Standards and
 Technology (NIST), the Federal Information System Controls Audit Manual, and OPM’s OCIO.

 The audit objective was carried out by reviewing the degree to which a variety of security
 program elements have been implemented for CBIS, including: 


    Security Assessment and Authorization (Authorization);

    Federal Information Processing Standards (FIPS) 199 Analysis;

    Privacy Impact Assessment (PIA);

    System Security Plan (SSP);

    Security Assessment Plan and Report;

    Continuous Monitoring;

    Contingency Planning and Contingency Plan Testing;

    Plan of Action and Milestones (POA&M) Process; and

    NIST Special Publication (SP) 800-53, Revision 4, Security Controls.

 SCOPE AND METHODOLOGY

 This performance audit was conducted in accordance with the Generally Accepted Government
 Auditing Standards, issued by the Comptroller General of the United States. Accordingly, the
 audit included an evaluation of related policies and procedures, compliance tests, and other
 auditing procedures that we considered necessary. The audit covered security controls and


                                                 2                   Report No. 4A-CF-00-17-043
FISMA compliance efforts of OPM officials responsible for CBIS, including the evaluation of IT
security controls in place as of July 2017.

We considered the CBIS internal control structure in planning our audit procedures. These
procedures were mainly substantive in nature, although we did gain an understanding of
management procedures and controls to the extent necessary to achieve our audit objectives.

To accomplish our objective, we interviewed representatives of OPM’s OCIO and OCFO
program offices with CBIS security responsibilities, reviewed documentation and system
screenshots, viewed demonstrations of system capabilities, and conducted tests directly on the
system. We also reviewed relevant OPM IT policies and procedures, federal laws, OMB policies
and guidance, and NIST guidance. As appropriate, we conducted compliance tests to determine
the extent to which established controls and procedures are functioning as required.

Details of the security controls protecting the confidentiality, integrity, and availability of CBIS
are located in the “Results” section of this report. Since our audit would not necessarily disclose
all significant matters in the internal control structure, we do not express an opinion on CBIS’s
internal controls taken as a whole. The criteria used in conducting this audit include:

	 OPM Information Security and Privacy Policy Handbook;

	 OMB Circular A-130, Appendix III, Security of Federal Automated Information Resources;

	 E-Government Act of 2002 (P.L. 107-347), Title III, Federal Information Security
   Management Act of 2002;

	 P.L. 113-283, Federal Information Security Modernization Act of 2014;

	 The Federal Information System Controls Audit Manual;

	 NIST SP 800-12, An Introduction to Computer Security;

	 NIST SP 800-18, Revision 1, Guide for Developing Security Plans for Federal Information
   Systems;

	 NIST SP 800-30, Revision 1, Guide for Conducting Risk Assessments;

	 NIST SP 800-34, Revision 1, Contingency Planning Guide for Federal Information Systems;

                                                 3	                          Report No. 4A-CF-00-17-043
	 NIST SP 800-37, Revision 1, Guide for Applying the Risk Management Framework to
   Federal Information Systems;

	 NIST SP 800-53, Revision 4, Security and Privacy Controls for Federal Information Systems
   and Organizations;

	 NIST SP 800-60, Revision 1, Guide for Mapping Types of Information and Information
   Systems to Security Categories;

	 NIST SP 800-84, Guide to Test, Training, and Exercise Programs for IT Plans and
   Capabilities;

	 FIPS Publication 199, Standards for Security Categorization of Federal Information and
   Information Systems; and

	 Other criteria as appropriate.

In conducting the audit, we relied to varying degrees on computer-generated data. Due to time
constraints, we did not verify the reliability of the data generated by the various information
systems involved. However, nothing came to our attention during our audit testing utilizing the
computer-generated data to cause us to doubt its reliability. We believe the data was sufficient to
achieve the audit objectives. Except as noted above, the audit was conducted in accordance with
the Generally Accepted Government Auditing Standards issued by the Comptroller General of
the United States.

The audit was performed by the OPM Office of the Inspector General, as established by the
Inspector General Act of 1978, as amended. The audit was conducted from May through August
2017 in OPM’s Washington, D.C. office.

COMPLIANCE WITH LAWS AND REGULATIONS

In conducting the audit, we performed tests to determine whether OPM’s management of CBIS
is consistent with applicable standards. While generally compliant, with respect to the items
tested, OPM was not in complete compliance with all standards, as described in section III of this
report.




                                                4	                          Report No. 4A-CF-00-17-043
III. AUDIT FINDINGS AND RECOMMENDATIONS

A. SECURITY ASSESSMENT AND AUTHORIZATION

  A Security Assessment and Authorization (Authorization) includes 1) a comprehensive
  assessment attesting that a system’s security controls meet security requirements and 2) an
  official management decision to authorize operation of an information system and accept its
  known risks. OMB’s Circular A-130, Appendix I, mandates that all Federal information
  systems have a valid Authorization. Although OMB previously required periodic
  Authorizations every three years, Federal agencies now have the option of continuously
  monitoring their systems to fulfill the Authorization requirement. However, OPM does not yet
  have a fully mature program in place to continuously monitor system security controls, therefore
  a current Authorization is required for every OPM system.

  CBIS was most recently authorized to operate (ATO) on May 1,
                                                                           CBIS has a current
  2017. This ATO is valid for up to three years and includes
                                                                           Authorization, valid
  provisions that the system owner monitor and remediate identified
                                                                           for up to three years.
  weaknesses on an ongoing basis.

B. FIPS 199 ANALYSIS

  The E-Government Act of 2002 requires federal agencies to categorize all Federal information
  and information systems. FIPS 199 provides guidance on how to assign appropriate
  categorization levels for information security according to a range of risk levels.

  NIST SP 800-60 Volume II, Guide for Mapping Types of Information and Information Systems
  to Security Categories, provides an overview of the security objectives and impact levels
  identified in FIPS Publication 199.

  The CBIS security categorization documentation analyzes information processed by the system
  and its corresponding potential impacts on confidentiality, integrity, and availability. CBIS is
  categorized with a “moderate” impact level for each area - confidentiality, integrity, and
  availability - resulting in an overall categorization of “moderate.”

  The security categorization of CBIS appears to be consistent with FIPS Publication 199 and
  NIST SP 800-60 requirements, and we agree with the categorization of “moderate.”



                                                  5                   Report No. 4A-CF-00-17-043
C. PRIVACY IMPACT ASSESSMENT

  The E-Government Act of 2002 requires agencies to perform a Privacy Threshold Analysis
  (PTA) screening of federal information systems to determine if a PIA is required for that system.
  OMB Memorandum M-03-22 outlines the necessary components of a PIA. The purpose of the
  assessment is to evaluate and document any personally identifiable information maintained by an
  information system.

                                                                          A privacy impact
  A PTA was not included in the CBIS Authorization package.
                                                                          assessment was
  However, a PIA was completed and approved by OPM’s Chief
                                                                          performed for CBIS.
  Privacy Officer in April 2017.

  We did not detect any issues with the CBIS PIA.

D. SYSTEM SECURITY PLAN

  Federal agencies must implement, for each information system, the security controls outlined in
  NIST SP 800-53, Revision 4, Security and Privacy Controls for Federal Information Systems and
  Organizations. NIST SP 800-18, Revision 1, Guide for Developing Security Plans for Federal
  Information Systems, requires that these controls be documented in an SSP for each system, and
  provides guidance for doing so.

  The SSP for CBIS was developed using the OCIO’s SSP template that utilizes NIST SP 800-18,
  Revision 1, as guidance. The template requires that the following elements be documented
  within the SSP:

     System Name and Identifier;
                                                         Assignment of Security Responsibility;
     System Categorization;
                                                         System Operational Status;
     System Owner;
                                                         Information System Type;
     Authorizing Official;
                                                         System Interconnection/Information
     Laws, Regulations, and Policies                     Sharing;
      Affecting the System;
                                                         General Description/Purpose;
     System Environment;

                                                  6                         Report No. 4A-CF-00-17-043
	 Other Designated Contacts;
                                                          Minimum Security Controls; and
   Completion and Approval Dates.
   Security Control Selection;
                                                                               The CBIS SSP
The current SSP was signed on April 7, 2017. However, the CBIS SSP             does not contain
does not adequately address all of the requirements of NIST.                   all information
Specifically, we found instances of the following issues:                      required by NIST.

	 Security controls that were labeled as “inherited” from another system, but the SSP did not
   identify which system provided the control (e.g., a general support system); and

	 Controls that had previously been defined as deficient were not mapped to existing Plan of
   Action and Milestones (POA&M) entries.

NIST SP 800-18, Revision 1, states “it is important to periodically assess the plan, review any
change in system status, functionality, design, etc., and ensure that the plan continues to reflect
the correct information about the system.”

The lack of current and complete documentation about a system’s security controls increases the
risk that controls are not implemented and functioning as required. This increases the difficulty
of assessing risks to the system and to OPM as a whole.

Recommendation 1

We recommend that OPM update the CBIS SSP in accordance with the agency’s policies and
NIST standards.

OPM Response:

“OPM does not concur with the recommendation. The SSP is a living document, which is updated
on an ongoing basis. The SSP for the major system was updated within the timeframe required by
OPM policy. Additional updates will always be expected of a living document to enhance security
control descriptions, add references to newly-identified POA&Ms, or improve any other facet of
the document. OPM will continue to update its security plans based on the evolution of its systems
and timeframes established in OPM policy.”




                                                  7	                          Report No. 4A-CF-00-17-043
  OIG Comment:

  While we acknowledge that an SSP is a living document and is always subject to change, that
  does not justify the fact that critical information was simply missing from the CBIS SSP at the
  time the Authorizing official made the risk-based decision to authorize the system to operate.
  CBIS inherits security controls from multiple sources, and details about these controls should be
  clearly identified within the SSP for both testing and remediation purposes. We continue to
  recommend that OPM update the CBIS SSP in accordance with the agency’s policies and NIST
  standards to ensure all required information is included.

E. SECURITY ASSESSMENT PLAN AND REPORT

  A Security Assessment Plan and Security Assessment Report (SAR) were completed for CBIS in
  March and May 2017, respectively, as a part of the system’s Authorization process. We
  reviewed the documents to verify that a risk assessment was conducted in accordance with NIST
  SP 800-30, Revision 1, Guide for Conducting Risk Assessments. We also verified that
  appropriate management, operational, and technical controls were tested for a system with a
  “moderate” security categorization. The following issues were identified:

  1) Incomplete Testing

     Three elements of the CBIS security control testing process were missing and/or incomplete.

     First, the assessors performing the test work noted that there were time constraints while
     testing 34 access controls, and that testing was not completed at the application level.

     Second, there were 16 security controls applicable to CBIS that did not have any test work or
     results documented.

     Third, the entire CBIS system environment was not accessible to the assessors at the time of
     testing. The CBIS system boundary includes several different logical environments (e.g.,
                                                                , etc.). Two of these
     environments had not been created at the time of the assessment testing, and therefore have
     not been subject to a security controls assessment.

     Excluding system components and required security controls from testing increases the risk
     that unidentified weaknesses exist in the system. NIST SP 800-37, Revision 1, requires that
     organizations “Assess the security controls in accordance with the assessment procedures

                                                  8                          Report No. 4A-CF-00-17-043
   defined in the security assessment plan.” OPM policy also requires that “All controls
   selected by the system (Task 2-2) are assessed.”

   Recommendation 2

   We recommend that OPM test the CBIS security controls that were not assessed during the
   Authorization process.

   OPM Response:

   “OPM partially concurs with the recommendation. The majority of the 16 controls referred by
   the OIG in the draft audit report are common, management controls identified as inherited in
   the SSP for the major system. Therefore, these controls do not require assessment, as that
   would be a duplication of previous work performed. OPM concurs that additional testing is
   necessary for the major system's application access controls and four other controls and
   enhancements.

   Additionally, all environments of the major system that were available at the time were
   assessed. The authorization to operate the system states that it is issued for the existing
   operating environment. As further environments are stood up, the security controls for those
   environments may be evaluated through OPM's continuous monitoring program.”

   OIG Comment:

   Although a majority of the 16 controls in question are inherited from an external entity, it is
   critical that information about these controls (i.e., validation that they have been
   implemented and tested) be documented in the CBIS Authorization package so that the
   authorizing official can make a fully informed decision in authorizing the system to operate.

   We continue to recommend that OPM ensure that all of the required security controls for all
   CBIS environments are tested.

2) Risk Assessment

   The assessment results table showed that 89 of the 238 tested controls     Not all of the
   were not fully satisfied. Of these 89 controls, 29 were not                identified control
   incorporated into the CBIS risk assessment, and therefore the risk         weaknesses were
   assessment was completed without a comprehensive picture of the            assessed for risk.
   system’s potential security vulnerabilities.

                                                9                           Report No. 4A-CF-00-17-043
     OPM’s policy requires that each weakness identified in the security controls assessment be
     assessed for risk as a part of the SAR.

     Failure to assess the risk associated with all identified weaknesses increases the possibility
     that weaknesses are not properly prioritized for remediation and compound risks may not be
     identified.

     Recommendation 3

     We recommend that OPM perform an analysis to assess the risk of the 29 control
     deficiencies that were omitted from the CBIS risk assessment. OPM should update the CBIS
     risk assessment and POA&Ms to include all identified weaknesses and their risk levels.

     OPM Response:

     “OPM does not concur with the recommendation. All control deficiencies identified from
     the assessment were included in the risk assessment and added to the Security Assessment
     Report (SAR). The SAR included all identified risk, both residual risk inherited from the
     infrastructure and risk specific to the major system. POA&Ms already existed for the
     infrastructure system risks and new POA&Ms were created for the newly identified risks
     for the major system.”

     OIG Comment:

     OPM’s statement in its response to the draft audit report is inaccurate. The Risk Assessment
     Table does not address 29 controls that were determined to be not fully satisfied. Despite
     multiple opportunities for the agency to provide evidence that these controls were assessed
     for risk, the information has not been provided to the OIG.

F. CONTINUOUS MONITORING

  OPM requires that the IT security controls of each application be assessed on a continuous basis.
  OPM’s OCIO has developed an Information Security Continuous Monitoring Plan (ISCMP) that
  includes a template outlining the security controls that must be tested for all information systems.
  This template must be tailored to each individual system’s specific security control needs. All
  system owners are required to customize their system’s ISCMP and then test the system’s
  security controls on an ongoing basis. The test results must be provided to the OCIO routinely
  for centralized tracking.

                                                  10                           Report No. 4A-CF-00-17-043
  We reviewed and had no issues with the two most recent continuous monitoring submissions for
  CBIS.

G. CONTINGENCY PLANNING AND CONTINGENCY PLAN TESTING

  NIST SP 800-34, Revision 1, Contingency Planning Guide for Federal Information Systems,
  states that effective contingency planning, execution, and testing are essential to mitigate the risk
  of system and service unavailability. OPM’s security policies require all major applications to
  have viable and logical disaster recovery and contingency plans, and that these plans be routinely
  reviewed, tested, and updated.
                                                                                     An updated
  1) Contingency Plan
                                                                                     contingency
                                                                                     plan has been
     The CBIS contingency plan documents the functions, operations, and
                                                                                     approved for
     resources necessary to restore and resume CBIS when unexpected events
                                                                                     CBIS.
     or disasters occur. The CBIS contingency plan adequately follows the
     format suggested by NIST SP 800-34, Revision 1, and OPM’s template for contingency
     plans. The version of the CBIS contingency plan that was approved during the Authorization
     process did not contain all of the required information. The contingency plan has been
     updated to include the missing information, but evidence that the updated version had been
     formally reviewed and approved was not provided to the OIG by the time we issued our draft
     audit report.

     Failure to review and approve a contingency plan increases the risk that the document
     contains incomplete and/or inaccurate information.

     Recommendation 4

     We recommend that OPM formally review and approve the revised CBIS contingency plan.

     OPM Response:

     “OPM does not concur with the recommendation. Before receipt of the draft report, OPM
     reviewed and approved a complete contingency plan for the major system. The
     contingency plan was included in the authorization package that was approved by the
     authorizing official.”




                                                   11                          Report No. 4A-CF-00-17-043
     OIG Comment:

     In response to the draft audit report, we were provided a copy of the approved contingency
     plan. No further action is required.

  2) Contingency Plan Testing

     Contingency plan testing is a critical element of a viable disaster recovery capability. OPM
     requires that contingency plans be tested routinely to determine the plan’s effectiveness and
     the organization’s readiness to execute the plan. NIST SP 800-34, Revision 1, provides
     guidance for testing contingency plans and documenting the results.

     The CBIS contingency plan was most recently tested in August 2016. The test was identified
     as a tabletop test.

     Nothing came to our attention to indicate that the CBIS contingency plan testing process is
     not adequate.

H. PLAN OF ACTION AND MILESTONES PROCESS

  A POA&M is a tool used to assist agencies in identifying, assessing, prioritizing, and monitoring
  the progress of corrective efforts for known IT security weaknesses. OPM has implemented an
  agency-wide POA&M process to help track known IT security weaknesses associated with the
  agency’s information systems.

  1) Incomplete POA&M Documentation

     The POA&M documentation contained in the CBIS Authorization package does not follow
     OPM’s template and does not include all of the required information (e.g., weakness IDs and
     affected controls).

     Incomplete POA&M documentation increases the risk that weaknesses are not resolved
     appropriately and/or timely.

     Recommendation 5

     We recommend that OPM update the CBIS POA&M to include the information required per
     OPM policy.

                                                 12                          Report No. 4A-CF-00-17-043
  OPM Response:

  “After receipt of the draft report, OPM added the major system's POA&M to the new
  repository and added the missing data element. OPM believes this addresses the intent of
  the OIG recommendation and requests the item be closed.”

  OIG Comment:

  In response to the draft report OCIO provided evidence that the POA&Ms had been updated.
  No further action is required.

2) Overdue POA&Ms

  CBIS has 40 open POA&Ms dating back to 2012. While 1 POA&M is pending closure, 39
  have scheduled completion dates that are over 6 months overdue. These POA&Ms should be
  updated to reflect any milestone changes and new reasonable estimated completion dates. If
  the recent move of CBIS made any of these items no longer applicable, they should be
  removed from the CBIS POA&M.

  OPM’s policy states that “Should expected completion dates for milestones of POA&Ms be
  missed, the associated POA&Ms will be brought before the [Management Review Board
  (MRB)] for review in order to address any corrective actions needed for remediating the
  POA&Ms in accordance with the requirements defined in the Authorization to Operate
  (ATO) issued for the applicable system. Updated milestones and expected completion dates
  will be required for the following MRB meeting.”

  Failure to properly maintain a system’s POA&M increases the likelihood of weaknesses not
  being addressed in a timely manner and potentially exposing the system to malicious attacks
  exploiting those unresolved vulnerabilities.

  Recommendation 6

  We recommend that OPM develop a detailed action plan to remediate all overdue POA&M
  items and close any that are no longer applicable. This action plan should include realistic
  estimated completion dates.




                                              13                         Report No. 4A-CF-00-17-043
      OPM Response:

      “OPM partially concurs with the recommendation. During the course of the audit, OPM
      provided the OIG the POA&M for the weaknesses identified during the assessment and
      authorization of the system. The items on the POA&M included the action plan, with
      estimated completion dates, for the remediation of the weaknesses.”

      As discussed in the prior recommendation, the POA&M for the major system had not yet
      transitioned to the new repository during the course of the audit. After receipt of the draft
      report, OPM updated the POA&M items with new estimated completion dates, taking into
      consideration any factors that have led to the previously missed dates. All POA&Ms that
      were no longer relevant have been remedied within the confines of our POA&M repository
      system of record. OPM believes this addresses the intent of the OIG recommendation and
      requests the item be closed.”

      OIG Comment:

      As part of the audit resolution process, we recommend the OCIO provide OPM’s Internal
      Oversight and Compliance division with evidence that this recommendation has been
      implemented.

I. NIST SP 800-53 EVALUATION

  NIST SP 800-53, Revision 4, Security and Privacy Controls for Federal Information Systems and
  Organizations, provides guidance for implementing a variety of security controls for information
  systems supporting the federal government. As part of this audit, we evaluated whether a subset
  of these controls had been implemented for CBIS. We tested approximately 20 controls from
  NIST SP 800-53, Revision 4, including one or more controls from each of the following control
  families:

     Access Control;                                 Planning;

     Security Assessment and Authorization;          Risk Assessment;

     Contingency Planning;                           Audit and Accountability;


     Incident Response;                              Configuration Management;



                                                 14                         Report No. 4A-CF-00-17-043
	 Identity and Authentication;                      System and Information Integrity;

	 Media Protection; and                             System and Communications Protection.

These controls were evaluated by interviewing individuals with CBIS security responsibilities,
reviewing documentation and system screenshots, viewing demonstrations of system
capabilities, and conducting tests directly on the system.

We determined that the tested security controls appear to be in compliance with NIST SP 800-
53, Revision 4, requirements with the following exception:

1) Control SI-4 Information System Monitoring

   Monitoring a system reduces the time required to detect and mitigate attacks against an
   information system.

   Despite the SSP reporting the use of a security tool to monitor CBIS for attacks or
   inappropriate access, the OCFO and/or the OCIO have not provided evidence indicating that
   the control is in place. Therefore, this report assumes that the control has not yet been
   implemented. Intrusion detection systems, log analyzers, or system event and incident
   management tools are some of the controls that could be used to monitor information
   systems.

   NIST SP 800-53, Revision 4, requires that an “organization:

       a.	 Monitor the information system to detect:
           1.	 Attacks and indicators of potential attacks in accordance with [organization-
               defined objectives]; and
           2.	 Unauthorized local, network, and remote connections;

       b.	 Identify unauthorized use of the information [with organization-defined techniques
           and methods];

       c.	 Deploy monitoring devices: (i) strategically within the information system to collect
           organization-determined essential information; and (ii) at ad hoc locations within the
           system to track specific types of transactions of interest to the organization; and




                                               15 	                        Report No. 4A-CF-00-17-043
   d.	 Protect information obtained from intrusion-monitoring tools from unauthorized
       access, modification, and deletion . . . . ”

Failure to monitor a system for attacks and unauthorized access increases the risks that an
attacker can access the system undetected and then steal, delete, or corrupt the system’s data.

Recommendation 7

We recommend that OPM implement tools and procedures to monitor CBIS according to
NIST guidance.

OPM Response:

“OPM does not concur with the recommendation. OPM requires tools and procedures be
implemented to monitor each of the systems it hosts and each of the systems that provide
services to OPM. These controls are inherited from the service provider and are monitored
on an ongoing basis by the OPM continuous monitoring program. OPM provided the OIG
with descriptions of the services provided by the service provider, including network and
security monitoring and incident response, as well as the tools that provide those services.”

OIG Comment:

In response to the draft report, OCIO provided documentation indicating that CBIS inherits
several NIST security controls from the external service provider. However, none of the
documents provided were evidence that control SI-4 is in place. As a part of the audit
resolution process we recommend that OPM provide Internal Oversight and Compliance
evidence of tools and procedures implemented to monitor CBIS.




                                            16 	                        Report No. 4A-CF-00-17-043
                                       APPENDIX
 
 
 
                 UNITED STATES OFFICE OF PERSONNEL MANAGEMENT
                                          Washington, DC 20415


                                          August 18, 2017

MEMORANDUM FOR
                         OFFICE OF THE INSPECTOR GENERAL

FROM:                    DAVID L. DEVRIES
                         CHIEF, INFORMATION SYSTEMS AUDIT GROUP
                         CHIEF INFORMATION OFFICER

                         DENNIS D. COLEMAN
                         CHIEF FINANCIAL OFFICER

Subject:                 Office of Personnel Management Response to the Office of the Inspector
                         General Audit Report No. 4A-CF-00-17-043

Thank you for the opportunity to provide comments to the Office of the Inspector General (OIG)
draft report 4A-CF-00-17-043. We recognize that even the most well-run programs benefit from
external evaluation and we appreciate your assessment of our operations as it will help guide our
improvements to enhance the security of the data provided to OPM by the Federal workforce, the
Federal agencies, Private industries, and the general public.

OPM has documented cybersecurity policies and procedures to protect OPM information and
information systems, and to implement requirements in Federal law. The recommendations provided
by the OIG generally state that OPM should implement its documented policies and procedures.
While OPM agrees that these actions should take place, OPM does not agree with the analysis or
findings supporting many of the recommendations issued by the OIG. OPM has highlighted these
areas with the partially concur and not concur responses below and provided additional
documentation to affirm OPM's statements and demonstrate OPM's accomplishments. We welcome a
collaborative dialogue to help us fully understand the OIG's recommendations as we plan our
remediation efforts so that our actions, and the closure of the recommendations, thoroughly address
the underlying issues.

The response to your recommendations is provided below.

Recommendation 1
We recommend that OPM update the [major system] SSP in accordance with the agency's policies
and NIST standards.

OPM Response: OPM does not concur with the recommendation. The SSP is a living document,
which is updated on an ongoing basis. The SSP for the major system was updated within the
                                                                              Report No. 4A-CF-00-17-043
timeframe required by OPM policy. Additional updates will always be expected of a living document
to enhance security control descriptions, add references to newly-identified POA&Ms, or improve
any other facet of the document. OPM will continue to update its security plans based on the
evolution of its systems and timeframes established in OPM policy. 
 
Recommendation 2
We recommend that OPM test the [major system] security controls that were not assessed during the
authorization process.

OPM Response: OPM partially concurs with the recommendation. The majority of the 16 controls
referred by the OIG in the draft audit report are common, management controls identified as
inherited in the SSP for the major system. Therefore, these controls do not require assessment, as that
would be a duplication of previous work performed. OPM concurs that additional testing is necessary
for the major system's application access controls and four other controls and enhancements.

Additionally, all environments of the major system that were available at the time were assessed. The
authorization to operate the system states that it is issued for the existing operating environment. As
further environments are stood up, the security controls for those environments may be evaluated
through OPM's continuous monitoring program.

Recommendation 3
We recommend that OPM perform an analysis to assess the risk of the 29 control deficiencies that
were omitted from the [major system] risk assessment. OPM should update the [major system] risk
assessment and POA&Ms to include all identified weaknesses and their risk levels.

OPM Response: OPM does not concur with the recommendation. All control deficiencies identified
from the assessment were included in the risk assessment and added to the Security Assessment
Report (SAR). The SAR included all identified risk, both residual risk inherited from the
infrastructure and risk specific to the major system. POA&Ms already existed for the infrastructure
system risks and new POA&Ms were created for the newly identified risks for the major system.

[A portion of the OPM response to the draft report has been removed by the OIG as it is not
relevant to the Final Report.]

Recommendation [4] 

We recommend that OPM formally review and approve the [major system] contingency plan. 


OPM Response: OPM does not concur with the recommendation. Before receipt of the draft report, 

OPM reviewed and approved a complete contingency plan for the major system. The contingency

plan was included in the authorization package that was approved by the authorizing official. 


Recommendation [5] 

We recommend that OPM update the [major system] POA&M to include the information required 

per OPM policy.
 
 
OPM Response: OPM partially concurs with the recommendation. OPM concurs with the OIG that the
information included on the POA&M provided to the OIG during the course of the audit was incomplete;
                                                                             Report No. 4A-CF-00-17-043
however, the POA&M was missing only one data element required by the Office of Management and 

Budget and OPM policy, not the list of elements documented in the report. This missing POA&M 

element was first identified in a prior audit by the General Accountability Office (GAO) and OPM created 

an item on its POA&M to remediate the issue. Since the issuance of the GAO audit report, OPM has 

undergone a transition of its POA&M to a new repository that can support the inclusion of the missing 

data element. During the course of this OIG audit, the POA&M for the major system had not yet 

transitioned to use the new repository. After receipt of the draft report, OPM added the major system's 

POA&M to the new repository and added the missing data element. OPM believes this addresses the 

intent of the OIG recommendation and requests the item be closed.


Recommendation [6]

We recommend that OPM develop a detailed action plan to remediate all overdue POA&M items and 

close any that are no longer applicable. This action plan should include realistic estimated completion 

dates. 


OPM Response: OPM partially concurs with the recommendation. During the course of the audit, OPM
provided the OIG the POA&M for the weaknesses identified during the assessment and authorization of
the system. The items on the POA&M included the action plan, with estimated completion dates, for the
remediation of the weaknesses.

As discussed in the prior recommendation, the POA&M for the major system had not yet transitioned to
the new repository during the course of the audit. After receipt of the draft report, OPM updated the
POA&M items with new estimated completion dates, taking into consideration any factors that have led
to the previously missed dates. All POA&Ms that were no longer relevant have been remedied within the
confines of our POA&M repository system of record. OPM believes this addresses the intent of the OIG
recommendation and requests the item be closed.

[A portion of the OPM response to the draft report has been removed by the OIG as it is not
relevant to the Final Report.]

Recommendation [7] 

We recommend that OPM implement tools and procedures to monitor [the major system] according 

to NIST guidance. 


OPM Response: OPM does not concur with the recommendation. OPM requires tools and
procedures be implemented to monitor each of the systems it hosts and each of the systems that
provide services to OPM. These controls are inherited from the service provider and are monitored
on an ongoing basis by the OPM continuous monitoring program. OPM provided the OIG with
descriptions of the services provided by the service provider, including network and security
monitoring and incident response, as well as the tools that provide those services.

The audit recommendations provided in this draft report highlight that OPM and its OIG may not
have a mutual understanding of OPM's work in this area. We believe further discussion regarding
OIG's recommendations and findings would be beneficial in reaching resolution of the audit
recommendations effectively and efficiently. Please contact us, or               , if you have
questions or need additional information.


                                                                                   Report No. 4A-CF-00-17-043
cc:

Chief Information Security Officer

Mark W. Lambert
Associate Director, Merit Systems Accountability and Compliance

Janet L. Barnes
Director, Internal Oversight and Compliance

Jason D. Simmons
Chief of Staff

Kathie Whipple
Deputy General Counsel

Jason Foster
Associate General Counsel 
 
 
 
 
 
 
 
 
 
 




                                                                  Report No. 4A-CF-00-17-043
 




                                                                                      



                    Report Fraud, Waste, and
                        Mismanagement 

                               Fraud, waste, and mismanagement in
                            Government concerns everyone: Office of
                                the Inspector General staff, agency
                             employees, and the general public. We
                           actively solicit allegations of any inefficient
                                 and wasteful practices, fraud, and
                            mismanagement related to OPM programs
                          and operations. You can report allegations to
                                        us in several ways:

         By Internet: 	        http://www.opm.gov/our-inspector-general/hotline-to-
                               report-fraud-waste-or-abuse

           By Phone:           Toll Free Number:                   (877) 499-7295
                               Washington Metro Area:              (202) 606-2423

            By Mail:           Office of the Inspector General
                               U.S. Office of Personnel Management
                               1900 E Street, NW
                               Room 6400
                               Washington, DC 20415-1100