Federal Information Security Modernization Act Audit FY 2015 Final Audit Report

Published by the Office of Personnel Management, Office of Inspector General on 2015-11-10.

Below is a raw (and likely hideous) rendition of the original report. (PDF)

         U.S. OFFICE OF PERSONNEL MANAGEMENT
            OFFICE OF THE INSPECTOR GENERAL
                     OFFICE OF AUDITS




            Final Audit Report

        Federal Information Security Modernization Act Audit
                               FY 2015

                                           Report Number 4A-CI-00-15-011
                                                 November 10, 2015




                                                             -- CAUTION --
This audit report has been distributed to Federal officials who are responsible for the administration of the audited program. This audit report may
contain proprietary data which is protected by Federal law (18 U.S.C. 1905). Therefore, while this audit report is available under the Freedom of
Information Act and made available to the public on the OIG webpage (http://www.opm.gov/our-inspector-general), caution needs to be exercised
before releasing the report to the general public as it may contain proprietary information that was redacted from the publicly distributed copy.
             EXECUTIVE SUMMARY
                   Federal Information Security Modernization Act Audit – FY 2015

Report No. 4A-CI-00-15-011                                                                             November 10, 2015



Why Did We Conduct the Audit?           What Did We Find?
Our overall objective was to evaluate   In FY 2015 OPM was the victim of a massive data breach that involved the
OPM’s security program and              theft of sensitive personal information of millions of individuals. For many
                                        years we have reported critical weaknesses in OPM’s ability to manage its
practices, as required by the Federal
                                        information technology (IT) environment, and warned that the agency was at
Information Security Modernization
                                        an increased risk of a data breach. In the wake of this data breach, OPM is
Act (FISMA). Specifically, we           finally focusing its efforts on improving its IT security posture.
reviewed the status of OPM’s            Unfortunately, as indicated by the variety of findings in this audit report,
information technology security         OPM continues to struggle to meet many FISMA requirements.
program in accordance with the
Department of Homeland Security’s       During this audit we did close a long-standing recommendation related to
                                        OPM’s information security management structure. However, this audit also
(DHS) FISMA Inspector General
                                        determined that there has been a regression in OPM’s management of its
reporting instructions.
                                        system Authorization program, which we classified as a material weakness in
                                        the FY 2014 FISMA audit report. In April 2015, the Chief Information
What Did We Audit?                      Officer issued a memorandum that granted an extension of the previous
                                        Authorizations for all systems whose Authorization had already expired, and
The Office of the Inspector General
                                        for those scheduled to expire through September 2016. Should this
(OIG) has completed a performance       moratorium on Authorizations continue, the agency will have up to 23
audit of OPM’s general FISMA            systems that have not been subject to a thorough security controls assessment.
compliance efforts in the specific
areas defined in DHS’s guidance and     We continue to believe that OPM’s management of system Authorizations
the corresponding reporting             represents a material weakness in the internal control structure of the agency’s
                                        IT security program. The moratorium on Authorizations will result in the IT
instructions. Our audit was conducted
                                        security controls of OPM’s systems being neglected. Combined with the
from April through September 2015       inadequacy and non-compliance of OPM’s continuous monitoring program,
at OPM headquarters in Washington,      we are very concerned that the agency’s systems will not be protected against
D.C.                                    another attack.

                                        Additionally, OPM’s inability to accurately inventory its systems and network
                                        devices drastically diminishes the effectiveness of its security controls. OPM
                                        has implemented a large number of improved security monitoring tools, but
                                        without a complete understanding of its network, it cannot adequately monitor
                                        its environment and therefore the usefulness of these tools is reduced.

                                        The following page outlines the additional issues that we identified during
                                        this FY 2015 FISMA audit.

 _______________________
 Michael R. Esser
 Assistant Inspector General
 for Audits
                                                       i
     EXECUTIVE SUMMARY 

          Federal Information Security Modernization Act Audit – FY 2015

Summary of FY 2015 FISMA Results

	 The significant deficiency related to information security governance has been dropped due to
   the reorganization of the Office of the Chief Information Officer (OCIO).
	 OPM’s system development life cycle policy is not enforced for all system development
   projects.
	 OPM does not maintain a comprehensive inventory of servers, databases, and network
   devices.
	 Up to 23 major OPM information systems are operating without a valid Authorization. This
   represents a material weakness in the internal control structure of OPM’s IT security program.
	 OPM does not have a mature continuous monitoring program. Also, security controls for all
   OPM systems are not adequately tested in accordance with OPM policy.
	 The OCIO has implemented an agency-wide information system configuration management
   policy; however, configuration baselines have not been created for all operating platforms.
   Also, all operating platforms are not routinely scanned for compliance with configuration
   baselines.
	 We are unable to independently attest that OPM has a mature vulnerability scanning program.
	 Multi-factor authentication is not required to access OPM systems in accordance with OMB
   memorandum M-11-11.
	 OPM has established an Enterprise Network Security Operations Center that is responsible for
   incident detection and response.
	 OPM has not fully established a Risk Executive Function.
	 Many individuals with significant information security responsibility have not taken
   specialized security training in accordance with OPM policy.
	 Program offices are not adequately incorporating known weaknesses into Plans of Action and
   Milestones (POA&M) and the majority of systems contain POA&Ms that are over 120 days
   overdue.
	 OPM has not configured its virtual private network servers to automatically terminate remote
   sessions in accordance with agency policy.
	 Not all OPM systems have reviewed their contingency plans or conducted contingency plan
   tests in FY 2015.
	 Several information security agreements between OPM and contractor-operated information
   systems have expired.




                                                ii
                       ABBREVIATIONS

Authorization   Security Assessment and Authorization
CDM             Continuous Diagnostic and Mitigation
CISO            Chief Information Security Officer
DHS             Department of Homeland Security
DSO             Designated Security Officer
ENSOC           Enterprise Network Security Operations Center
FIPS            Federal Information Processing Standards
FISMA           Federal Information Security Modernization Act
FY              Fiscal year
IOC             Internal Oversight and Compliance
ISA             Interconnection Security Agreements
ISCM            Information Systems Continuous Monitoring
ISSO            Information System Security Officer
IT              Information Technology
LAN             Local area network
MOU/A           Memorandum of Understanding/Agreement
NIST            National Institute for Standards and Technology
OCIO            Office of the Chief Information Officer
OIG             Office of the Inspector General
OMB             Office of Management and Budget
OPM             Office of Personnel Management
POA&M           Plan of Action and Milestones
SDLC            System Development Life Cycle
SIEM            Security information and event management
SP              Special Publication
US-CERT         United States Computer Emergency Readiness Team
VPN             Virtual private network




                                      iii
          TABLE OF CONTENTS
IV. MAJOR CONTRIBUTORS  TO THIS REPORT

                                                                                                                       Page
       EXECUTIVE SUMMARY ......................................................................................... i

       ABBREVIATIONS .................................................................................................... iii 


I.     BACKGROUND ..........................................................................................................1 


II.    OBJECTIVES, SCOPE, AND METHODOLOGY ..................................................2 


III.   AUDIT FINDINGS AND RECOMMENDATIONS.................................................5

       A. Information Security Governance ...........................................................................6
       B. Security Assessment and Authorization ..................................................................9
       C. Continuous Monitoring..........................................................................................12
       D. Configuration Management ...................................................................................14
       E. Identity and Access Management ..........................................................................19
       F. Incident Response and Reporting ..........................................................................21
       G. Risk Management ..................................................................................................23
       H. Security Training ..................................................................................................25
       I. Plan of Action & Milestones..................................................................................26
       J. Remote Access Management.................................................................................28
       K. Contingency Planning............................................................................................29
       L. Contractor Systems ................................................................................................31

IV.    MAJOR CONTRIBUTORS TO THIS REPORT ..................................................33


       APPENDIX I: Status of Prior OIG Audit Recommendations
       APPENDIX II: The Office of the Chief Information Officer’s October 22, 2015
                     response to the draft audit report, issued September 30, 2015.
       APPENDIX III: FY 2015 Inspector General FISMA reporting metrics

       REPORT FRAUD, WASTE, AND MISMANAGEMENT
                               I.I.BACKGROUND
                                   BACKGROUND

On December 17, 2002, the President signed into law the E-Government Act (Public Law
107-347), which includes Title III, the Federal Information Security Management Act. This Act
requires (1) annual agency program reviews, (2) annual Inspector General (IG) evaluations, (3)
agency reporting to the Office of Management and Budget (OMB) the results of IG evaluations
for unclassified systems, and (4) an annual OMB report to Congress summarizing the material
received from agencies. On December 18, 2014 President Obama signed Public Law 113-283,
the Federal Information Security Modernization Act (FISMA), which reiterates the need for an
annual IG evaluation. In accordance with FISMA, we conducted an evaluation of OPM’s
security program and practices. As part of our evaluation, we reviewed OPM’s FISMA
compliance strategy and documented the status of its compliance efforts.

FISMA requirements pertain to all information systems supporting the operations and assets of
an agency, including those systems currently in place or planned. The requirements also pertain
to IT resources owned and/or operated by a contractor supporting agency systems.

FISMA reemphasizes the Chief Information Officer’s strategic, agency-wide security
responsibility. At OPM, security responsibility is assigned to the agency’s Office of the Chief
Information Officer (OCIO). FISMA also clearly places responsibility on each agency program
office to develop, implement, and maintain a security program that assesses risk and provides
adequate security for the operations and assets of programs and systems under its control.

To assist agencies and IGs in fulfilling their FISMA evaluation and reporting responsibilities, the
Department of Homeland Security (DHS) Office of Cybersecurity and Communications issued
the Fiscal Year (FY) 2015 Inspector General FISMA Reporting Instructions. This document
provides a consistent form and format for agencies to report FISMA audit results to DHS. It
identifies a series of reporting topics that relate to specific agency responsibilities outlined in
FISMA. Our audit and reporting strategies were designed in accordance with the above DHS
guidance.




                                                 1                           Report No. 4A-CI-00-15-011
    IVII.. OBJECTIVE, SCOPE, AND METHODOLOGY
           MAJOR CONTRIBUTORS     TO THIS REPORT
Objective

Our overall objective was to evaluate OPM’s security program and practices, as required by
FISMA. Specifically, we reviewed the status of the following areas of OPM’s information
technology (IT) security program in accordance with DHS’s FISMA IG reporting requirements:

   Continuous Monitoring Management;
   Configuration Management;
   Identity and Access Management;
   Incident Response and Reporting;
   Risk Management;
   Security Training;
   Plan of Action & Milestones (POA&M);
   Remote Access Management;
   Contingency Planning; and
   Contractor Systems.

In addition, we evaluated the status of OPM’s IT security governance structure and the agency’s
system Authorization process, areas that have represented a material weakness in OPM’s IT 

security program in prior FISMA audits.


We also audited the security controls of four major applications/systems at OPM (see the Scope
and Methodology section below for details of these audits), and followed-up on outstanding 

recommendations from prior FISMA audits (see Appendix I). 


Scope and Methodology
We conducted this performance audit in accordance with generally accepted government 

auditing standards. Those standards require that we plan and perform the audit to obtain 

sufficient, appropriate evidence to provide a reasonable basis for our findings and conclusions 

based on our audit objectives. We believe that the evidence obtained provides a reasonable basis
for our findings and conclusions based on our audit objectives. The audit covered OPM’s 

FISMA compliance efforts throughout FY 2015. 


We reviewed OPM’s general FISMA compliance efforts in the specific areas defined in DHS’s 

guidance and the corresponding reporting instructions. We also performed information security
audits on the following major information systems: 

 Multi-State Plan Program Portal (Report No. 4A-RI-00-15-013, issued May 11, 2015);
 USA Performance System (Report No. 4A-HR-00-15-018, issued July 20, 2015);



                                                2                          Report No. 4A-CI-00-15-011
 Annuitant Health Benefits Open Season System (Report No. 4A-RI-00-15-019, issued
  July 29, 2015); and,
 GP Plateau Baseline 6 Learning Management System (Report No. 4A-HR-00-15-015, issued
  July 31, 2015).

We considered the internal control structure for various OPM systems in planning our audit
procedures. These procedures were mainly substantive in nature, although we did gain an
understanding of management procedures and controls to the extent necessary to achieve our
audit objectives. Accordingly, we obtained an understanding of the internal controls for these
various systems through interviews and observations, as well as inspection of various documents,
including information technology and other related organizational policies and procedures. This
understanding of these systems’ internal controls was used to evaluate the degree to which the
appropriate internal controls were designed and implemented. As appropriate, we conducted
compliance tests using judgmental sampling to determine the extent to which established
controls and procedures are functioning as required.

In conducting our audit, we relied to varying degrees on computer-generated data provided by
OPM. Due to time constraints, we did not verify the reliability of the data generated by the
various information systems involved. However, we believe that the data was sufficient to
achieve the audit objectives, and nothing came to our attention during our audit to cause us to
doubt its reliability.

Since our audit would not necessarily disclose all significant matters in the internal control
structure, we do not express an opinion on the set of internal controls for these various systems
taken as a whole.

The criteria used in conducting this audit included:
 DHS Office of Cybersecurity and Communications FY 2015 Inspector General Federal
  Information Security Modernization Act Reporting Instructions;
 OPM Information Technology Security and Privacy Policy Handbook;
 OPM Information Technology Security FISMA Procedures;
 OPM Security Assessment and Authorization Guide;
 OPM Plan of Action and Milestones Standard Operating Procedures;
 OMB Circular A-130, Appendix III, Security of Federal Automated Information Resources;
 OMB Memorandum M-07-16, Safeguarding Against and Responding to the Breach of
  Personally Identifiable Information;
 OMB Memorandum M-11-11: Continued Implementation of Homeland Security Presidential
  Directive 12;
 P.L. 107-347, Title III, Federal Information Security Management Act of 2002;



                                                 3                           Report No. 4A-CI-00-15-011
 P.L. 113-283, Federal Information Security Modernization Act of 2014;
 National Institute for Standards and Technology (NIST) Special Publication (SP) 800-12, An
  Introduction to Computer Security;
 NIST SP 800-18 Revision 1, Guide for Developing Security Plans for Federal Information
  Systems;
 NIST SP 800-30 Revision 1, Guide for Conducting Risk Assessments;
 NIST SP 800-34 Revision 1, Contingency Planning Guide for Federal Information Systems;
 NIST SP 800-37 Revision 1, Guide for Applying the Risk Management Framework to Federal
  Information Systems;
 NIST SP 800-39, Managing Information Security Risk – Organization, Mission, and
  Information System View;
 NIST SP 800-47, Security Guide for Interconnecting Information Technology Systems;
 NIST SP 800-53 Revision 4, Security and Privacy Controls for Federal Information Systems
  and Organizations;
 NIST SP 800-60 Volume 2, Guide for Mapping Types of Information and Information
  Systems to Security Categories;
 Federal Information Processing Standards (FIPS) Publication 199, Standards for Security
  Categorization of Federal Information and Information Systems;
 FIPS Publication 140-2, Security Requirements for Cryptographic Modules; and,
 Other criteria as appropriate.

The audit was performed by the OIG at OPM, as established by the Inspector General Act of
1978, as amended. Our audit was conducted from April through September 2015 in OPM’s
Washington, D.C. office.

Compliance with Laws and Regulations
In conducting the audit, we performed tests to determine whether OPM’s practices were
consistent with applicable standards. While generally compliant, with respect to the items tested,
OPM’s OCIO and other program offices were not in complete compliance with all standards, as
described in section III of this report.




                                                4                           Report No. 4A-CI-00-15-011
III. AUDIT FINDINGS AND RECOMMEDATIONS

Introduction
In FY 2015 OPM was the victim of a massive data breach that involved the theft of sensitive
personal information of millions of individuals. This was an advanced attack that may have been
impossible to prevent in even the most advanced network environment. However, for many
years we have reported critical weaknesses in OPM’s ability to manage its IT environment, and
warned that the agency was at an increased risk of a data breach. OPM continuously failed a
variety of FISMA metrics and carried material weaknesses in the annual FISMA reports. Our
recommendations appeared to garner little attention, as the same findings were repeated year
after year.

In the wake of this data breach, OPM is finally focusing its efforts on improving its IT security
posture. Unfortunately, as indicated by the variety of findings in this audit report, OPM
continues to fail to meet FISMA requirements, and we now have additional concerns with the
manner in which the agency is attempting to quickly fix problems that were decades in the
making.

OPM has determined that in order to best secure the sensitive data it maintains, it must create an
entirely new technical infrastructure and migrate all of the agency’s systems into this new
environment (referred to as the ‘Shell’). OPM faces enormous hurdles in reaching its desired
outcome – many of which we do not believe the agency is adequately prepared to address. This
infrastructure improvement project has an impact on a variety of the FY 2015 FISMA reporting
metrics and will be referenced throughout this report. However, our specific concerns with this
project are detailed through separate reporting mechanisms. 1

Of particular concern in this year’s FISMA audit results is the overall lack of compliance that
seems to permeate the agency’s IT security program. For example, OPM’s decision to put
system Security Assessment and Authorizations on hold until applications are migrated into the
Shell is an extremely poor decision, and makes it likely that the IT security controls of OPM’s
systems will remain neglected during the time that it takes to move the systems to the new
environment (probably many years – see section B below). Combined with the inadequacy and
non-compliance of OPM’s continuous monitoring program, we are very concerned that the
agency’s systems will not be protected against another attack.




1
 Flash Audit Alert – U.S. Office of Personnel Management’s Infrastructure Improvement Project (Report No. 4A-
CI-00-15-055) and Interim Status Report on OPM’s Responses to Flash Audit Alert – U.S. Office of Personnel
Management’s (OPM) Infrastructure Improvement Project (Report No. 4A-CI-00-15-055)


                                                      5                               Report No. 4A-CI-00-15-011
  Additionally, OPM’s inability to accurately inventory its systems and network devices drastically
  diminishes the effectiveness of its security controls. OPM has implemented a large number of
  improved security monitoring tools, but without a complete understanding of its network, it
  cannot adequately monitor its environment and therefore the usefulness of these tools is reduced.
  This same concern extends to OPM’s vulnerability scanning program (see section D below).

  In its response to our draft audit report, the OPM Office of the Chief    21 of the 27
  Information Officer (OCIO) stated “I am proud that OCIO has closed        recommendations in
  77% of the recommendations for the FY 2007 through FY 2014 OIG            this report are at
  FISMA Audits, as well as OIG system audits.” Although this number         least one year old.
  is technically accurate, the vast majority of those recommendations
  were closed many years ago, and are no longer relevant to the current cybersecurity threats that
  the agency faces. A more relevant statistic is that OPM has closed only 43% of the FISMA
  recommendations issued in the FY 2013 and FY 2014 FISMA audits. In addition, 21 of the 27
  recommendations in this FY 2015 report are at least one year old2.

  We acknowledge that OPM has recently placed additional focus on addressing OIG audit
  recommendations, and has sought our input in implementing controls to protect its technical
  environment. Significant work remains for the agency to secure its IT systems, and we are
  hopeful that this trend continues through the next fiscal year.

A. Information Security Governance
  Information security governance is the overall framework and supporting management structure
  and processes that are the foundation of a successful information security program. Proper
  governance involves a variety of activities, challenges, and requirements, but three primary
  elements include a well-defined security management structure, maintaining a comprehensive
  inventory of information systems, and managing systems development projects in a disciplined
  and consistent manner.

  The following sections provide additional details from the OIG’s review of IT security
  governance at OPM.

  a) Security Management Structure
      For many years, we have reported increasing concerns about the state of OPM’s information
      security management structure. Our Federal Information Security Management Act audit
      reports from FY 2009 through FY 2013 reported this issue as a material weakness, and our
      recommendation was that the agency recruit a staff of information security professionals to

  2
    Two of the 27 recommendations in this report were implemented by the OCIO in early FY 2016, including one
  recommendation that was more than one year old, and will be closed upon issuance of this report.


                                                        6                               Report No. 4A-CI-00-15-011
   act as Information System Security Officers (ISSO) that report to the OCIO. Our FY 2014
   FISMA report reduced the severity of the material weakness to a significant deficiency based
   on OPM’s plan to imminently hire enough ISSOs to manage the security for 100 percent of
   the agency’s information systems. Throughout FY 2015, OPM was successful in filling the
   vacant ISSO positions, effectively centralizing IT security responsibility under the Chief
   Information Officer (CIO) and fulfilling our audit recommendation.
                                                                     OPM has made progress
   With this new governance structure in place, we are closing the in addressing security
   audit recommendation related to security management structure governance issues by
   and removing the significant deficiency from our report.          centralizing IT security
   However, the reorganization of IT security responsibility is      responsibility.
   only the first step in addressing OPM’s security governance
   issues. We will closely monitor the effectiveness of this new management structure and will
   issue additional audit recommendations as necessary.

b) Infrastructure and Inventory
   In addition to the decentralization of personnel with IT responsibility, OPM has historically
   maintained a fragmented and decentralized technical infrastructure that is spread over six
   data centers and is maintained by different organizations within the agency. OPM’s various
   program offices would procure, configure, and manage their own information systems, and
   the OCIO had little control over them – assuming it knew they existed.

   OPM has several initiatives underway to improve its inventory management program, but it
   is a monumental task. During this audit we reviewed OPM’s inventory of major information
   systems (i.e., those subject to FISMA reporting requirements) and compared it to a
   “comprehensive inventory” that was developed in preparation for migrating systems to the
   new Shell environment. There are significant discrepancies between the two lists, and our
   primary concern is that there are still unidentified systems residing on OPM’s network, and
   that existing applications are not appropriately classified as major or minor.

   Over the past several years, the agency has procured a variety of tools to help automate
   efforts to secure the OPM network. However, our FY 2014 FISMA audit determined that all
   of these tools are not being utilized to their fullest capacity, as the agency was having
   difficulty implementing and enforcing the new controls on all endpoints of the decentralized
   network. In the wake of the data breach, OPM procured even more security tools to help
   further secure the network. We agree that these tools add value, but OPM continues to face
   the challenge of implementing them into a fragmented environment where it continues to
   lack a comprehensive inventory of information systems, computer hardware, and network
   devices. Despite this major investment in security software and hardware, OPM cannot fully




                                               7                           Report No. 4A-CI-00-15-011
   leverage the capability of these tools without knowing which assets must be protected, and
   therefore continues to remain vulnerable to security breaches.

   OPM’s issues with its system inventory also have a major impact on the infrastructure
   improvement project. Without knowing exactly how many and what type of systems need to
   be migrated to the new environment, there is no way to adequately plan the time and money
   that will be required.
                                                                     Failure to maintain an
   Failure to maintain an up-to-date inventory and appropriately     accurate IT inventory
   classify all systems in the environment undermines all other      undermines all attempts
   attempts at oversight, risk management, and securing the          at securing OPM’s
   agency’s information systems.                                     information systems.

   Recommendation 1 (Rolled Forward from 2014)
   We recommend that the OCIO develop and maintain a comprehensive inventory of all
   servers, databases, and network devices that reside on the OPM network.

   OCIO Response:
   “OCIO concurs with the recommendation. Asset inventory tools were installed on the
   network in FY 2015 and are being further configured to address gaps in network coverage.
   Additionally, network access control appliances have been installed to prevent
   unauthorized equipment from logging onto or being installed on the network. These tools
   will be aggressively implemented to provide additional assurance that a comprehensive
   inventory of assets is maintained.”

   OIG Comment:
   As part of the audit resolution process, we recommend that the OCIO provide evidence to
   OPM’s Internal Oversight and Compliance (IOC) office that is has developed a
   comprehensive inventory and has also implemented a process to maintain it. This statement
   applies to all subsequent audit recommendations that OCIO agrees to implement.

c) Systems Development Lifecycle Methodology
   OPM has a history of troubled system development projects. In our opinion, the root causes
   of these issues are related to the lack of centralized oversight of systems development.
   Despite multiple attempts and hundreds of millions of dollars invested, OPM has
   encountered well publicized failures to modernize its retirement claims processing system.
   OPM has also faced struggles in modernizing its financial systems and its applications
   supporting the background investigation process. OPM’s current infrastructure improvement
   project will be far more complex than these examples or anything the agency has attempted
   in the past.



                                               8                          Report No. 4A-CI-00-15-011
     At the end of FY 2013, the OCIO published a new Systems Development Lifecycle (SDLC)
     policy, which was a significant first step in implementing a centralized SDLC methodology
     at OPM. The new SDLC policy incorporated several prior OIG recommendations related to
     a centralized review process of system development projects. However, this new SDLC is
     only applicable to major investment projects, and thus is not actively enforced for all IT
     projects in the agency. Of further concern, OPM has not been following this SDLC for its
     infrastructure overhaul. This initiative requires a disciplined project management and
     systems development approach – not only for the overall project, but for the process of
     upgrading and migrating each individual information system.

     Recommendation 2 (Rolled Forward from 2013)
     We continue to recommend that the OCIO develop a plan and timeline to enforce the new
     SDLC policy to all of OPM’s system development projects.

     OCIO Response:
     “OCIO concurs with the recommendation. An enhanced policy is being developed to
     update the Systems Development Life Cycle (SDLC) requirements. A plan and timeline for
     implementation of the policy for all Development, Modernization and Enhancement
     (DM&E) projects is also being developed.”

B. Security Assessment and Authorization
  Information system Security Assessment and Authorization (Authorization) is a
  comprehensive assessment that evaluates whether a system’s security controls are meeting
  the security requirements of that system.

  The Authorization packages reviewed as part of last year’s FY 2014 FISMA audit were
  generally of satisfactory quality. However , 11 out of OPM’s 47 major information systems
  had not been through the Authorization process in over three years, and several of these
  systems are critical to OPM’s mission and/or process extremely sensitive data. Due to the
  volume and sensitivity of the OPM systems that were operating without an active
  Authorization, we classified this issue as a material weakness in the FY 2014 FISMA report.

  Unfortunately, our FY 2015 FISMA audit work indicates that OPM’s management of system
  Authorizations has deteriorated even further. In April 2015, the CIO issued a memorandum that
  granted an extension of the previous Authorizations for all systems whose Authorization had
  already expired, and for those scheduled to expire through September 2016. Should this
  moratorium on Authorizations continue throughout FY 2016, the agency will have up to 23
  systems that have not been subject to a thorough security controls assessment. The justification
  for this action was that OPM is in the process of modernizing its IT infrastructure, and that once
  this modernization is complete, all systems would have to receive new Authorizations anyway.



                                                  9                           Report No. 4A-CI-00-15-011
However, the migration to OPM’s new technical environment is at least five years away from
completion. This is enough time for all systems to go through nearly two full Authorization
cycles, and does not justify delaying the process.
                                                                                It is irresponsible to
Federal agencies also have the option of continuously monitoring their          allow information
systems IT security controls in lieu of performing formal                       systems to operate
Authorizations every three years. However, it will also take significant        indefinitely without
time before OPM has a continuous monitoring program in place that is            subjecting them to a
mature enough to mitigate the necessity of system Authorizations.               thorough security
OPM is planning to implement DHS’s Continuous Diagnostic and                    controls assessment,
Mitigation (CDM) program. However, the CDM tools are not                        as OPM is doing.
scheduled to be installed until mid-FY 2016, and it will take some time
after that for the program to mature. Although the new infrastructure and the use of CDM will
certainly impact the way OPM handles Authorizations in the future, we believe that in the
interim it is critical that OPM continue to subject all of its systems to this assessment process.

The Office of Management and Budget's (OMB) Circular A-130, Appendix III mandates that
all Federal information systems have a valid Authorization. According to OMB, information
systems should not be operating in a production environment without an Authorization, and
agencies should consider shutting down systems that do not have a current and valid
Authorization.

We acknowledge that the lack of an Authorization does not, by definition, mean that a system is
insecure. However, it absolutely does mean that a system is at a significantly higher risk of
containing unidentified security vulnerabilities. The authorization process - nearly without
exception - identifies significant issues that must be addressed. If the agency does not know
what weaknesses and vulnerabilities exist in its IT environment, it cannot take steps to address
and remove those weaknesses, or develop a proactive and comprehensive IT security strategy.

Considering the rapidly changing pace of technology, it is irresponsible to allow these systems to
operate without routinely subjecting them to a thorough security controls assessment. We
continue to believe that OPM’s management of system Authorizations represents a material
weakness in the internal control structure of the agency's IT security program.

Recommendation 3 (Rolled Forward from 2014)
We recommend that all active systems in OPM’s inventory have a complete and current
Authorization.

OCIO Response:
“OCIO concurs with the recommendation. OCIO made a risk-based cost-effective decision in
FY 2014 to extend the authorizations for all systems in the current enterprise network. Upon

                                                  10                           Report No. 4A-CI-00-15-011
migration to the new environment, all systems will undergo a full security assessment and
authorization as this constitutes a major change. As part of our analysis and planning for
migration to the new infrastructure, OCIO will conduct a full assessment of the existing
authorization package for systems that may remain in the legacy environment for a prolonged
period of time.”

OIG Comment:
Although the OCIO states that it concurs with our recommendation, its response to our draft
report makes it clear that it has no intention of actually addressing this issue. We are well aware
of the decision to extend Authorizations for all systems in the current enterprise network until
they are migrated to the new environment. While the OCIO is presenting this extension as some
sort of compensating control, we view it as the core of the problem. The OCIO could not have
made a “risk-based” decision to extend the authorizations of these systems because it has not
done any assessment to determine what risks actually exist within these systems. We maintain
that it is irresponsible to allow these systems to operate without routinely subjecting them to a
thorough security controls assessment.

Recommendation 4 (Rolled Forward from 2014)
We recommend that the performance standards of all OPM system owners be modified to
include a requirement related to FISMA compliance for the information systems they own. At a
minimum, system owners should be required to ensure that their systems have valid
Authorizations.

OCIO Response: 

“OCIO concurs with the recommendation. OCIO established and implemented these 

performance standards for the OCIO IT Project Managers (IT PM) in FY 2015. In FY 2016, 

OCIO will improve these standards and create a new policy to require these standards for IT 

PMs not positioned within OCIO.” 


Recommendation 5 (Rolled Forward from 2014)
We recommend that the OPM Director consider shutting down information systems that do not
have a current and valid Authorization.

OCIO Response: 

“OCIO partially concurs with the recommendation. OCIO will establish a policy and process 

for managing authorizations to include documenting a risk-based decision by the authorizing 

officials to continue operations when authorizations expire.” 





                                                11                           Report No. 4A-CI-00-15-011
  OIG Comment:
  The recommendation is that the OPM Director place consideration on shutting down information
  systems that do not have a current and valid Authorization – this includes a large number of
  systems whose Authorizations have already expired. If the Director decides to keep these
  systems operational even though no assessment has been done to determine what risks exist
  within them, then this decision should be formally documented.

C. Continuous Monitoring
  The following sections detail our review of OPM’s efforts to continuously monitor the security
  controls of its information systems.

  a) Continuous Monitoring Methodology
     In FY 2015, the Council of the Inspectors General on Integrity and Efficiency (CIGIE)
     developed a Continuous Monitoring Maturity Model that provides a framework for
     evaluating an agency’s information security program and ranking the maturity of its security
     control monitoring program on a 5-level scale (level 1 being the least mature and effective).

     We utilized this maturity model to conduct our review of OPM’s information systems
     continuous monitoring program (ISCM). Our review determined that OPM’s ISCM is
     currently operating at level 1, “Ad-Hoc.”

     Through interviews with OCIO personnel we were informed that the ISCM policies and
     procedures are currently being restructured to better suit the current OPM environment.
     These new policies and procedures will also help create a more transparent ISCM program,
     as the previous iteration of ISCM policies did not prove to be very effective. The policies are
     currently in draft form and the OCIO did not provide an estimated completion date.

     We were also informed that the software platform currently used for continuous monitoring
     submissions and reporting has not been meeting the needs of the ISCM program. The OCIO
     currently has a project underway to acquire a new software package that will better integrate
     with OPM’s environment and the requirements of the ISCM program. Defining the
     technology needed to support a continuous monitoring program is a critical element of
     CIGIE’s ISCM Maturity Model.

     Implementation of our recommendation will help the agency reach the next level of
     continuous monitoring maturity. As mentioned above, OPM is not currently performing
     Authorizations on many of its systems. Failure to assess the IT security controls of
     information systems significantly increases the risk that a system vulnerability will remain
     undetected and exploited.



                                                 12                           Report No. 4A-CI-00-15-011
   Recommendation 6
   We recommend that the new ISCM policies and procedures being developed utilize and 

   incorporate the controls identified in the CIGIE Information Security Continuous Monitoring 

   Maturity Model. At a minimum the policies and procedures should: 

    Document key stakeholders and their responsibilities;

    Implement continuous monitoring submissions standardization;

    Develop requirements for personnel with significant ISCM responsibilities to have the

     necessary skill, knowledge, and training to complement their role;
    Develop qualitative and quantitative measures for assessing the effectiveness of the ISCM
     program;
    Define how ISCM information is routinely shared with top management and personnel
     with significant ISCM responsibilities, and
    Define the technology needed to support the ISCM program.

   OCIO Response:
   “OCIO partially concurs with the recommendation. We agree that policies and procedures
   should be developed to address the items listed in the recommendation, and will meet
   OPM’s ISCM responsibilities in accordance with Federal laws, regulations, directives, and
   policies. While OPM does not have a requirement to follow the CIGIE ISCM Maturity
   Model, we will consider using the CIGIE ISCM Maturity Model where desirable and
   practicable.”

   OIG Comment:
   While the OCIO states that it only partially agrees with the recommendation, its planned
   action of implementing the minimum items outlined above and leveraging the ISCM
   Maturity model while developing its ISCM program will address the audit recommendation.

b) Assessment of Individual System Security Controls
   Not only did we determine that OPM’s continuous monitoring program is inadequate, we
   found that many system owners are not even in compliance with it. OPM’s existing policy
   requires all OPM operated system owners to submit evidence of continuous monitoring
   activities at least quarterly. Security control testing is currently required only once a year for
   OPM systems operated by a contractor.

   We requested the security control testing documentation for all OPM systems in order to
   review them for quality and consistency. We determined that only 20 out of 29 systems
   operated by OPM were subject to adequate security control continuous monitoring activity in
   FY 2015, and only 10 of the 17 systems operated by a contractor were subject to an adequate
   annual security control testing exercise.



                                                 13                           Report No. 4A-CI-00-15-011
     The following program offices own information systems that failed the security control
     testing metric in FY 2015.
        Office of the Chief Financial Officer (two systems);
        Office of the Chief Information Officer (one system);                It has been over nine
        Employee Services (two systems);                                     years since OPM has
        Healthcare and Insurance (three systems);                            assessed the security
                                                                              controls of all of its
        Human Resources Solutions (two systems);
                                                                              systems in a single
        Office of the Inspector General (three systems); and
                                                                              fiscal year.
        Retirement Services (three systems).

     Between contractor and agency-operated information systems, only 30 out of 46 systems
     were subject to adequate security controls testing in FY 2015. Failure to continuously
     monitor and assess security controls increases the risk that agency officials are unable to
     make informed judgments to appropriately mitigate risks to an acceptable level.

     It has been over nine years since all OPM systems were subject to an adequate security
     controls test within a single fiscal year.

     Recommendation 7 (Rolled forward from 2008)
     We recommend that OPM ensure that an annual test of security controls has been completed
     for all systems.

     OCIO Response: 

     “OCIO concurs with the recommendation and will ensure all systems have security 

     controls testing performed at least annually and in accordance with OPM ISCM policy.” 


D. Configuration Management
  The sections below detail the controls that the OCIO has in place to manage the technical 

  configuration of OPM servers, databases, and workstations. 


  a) Agency-wide security configuration policy
     OPM’s Information Security and Privacy Policy Handbook contains policies and procedures
     related to agency-wide configuration management. The handbook requires the establishment
     of secure baseline configurations and the monitoring and documenting of all configuration
     changes.

  b) Configuration baselines
     Our FY 2014 FISMA audit determined that OPM did not have formal baseline configurations
     in place for all of the operating platforms and databases used in its environment. In FY 2015,


                                                 14                           Report No. 4A-CI-00-15-011
we again reviewed OPM’s progress toward establishing formal baseline configurations and
determined that OPM has not made progress in implementing our recommendation. In fact it
appears OPM has regressed, as we only received current baseline configurations for two
operating systems (           and                   ), fewer than we reported in FY 2014.

Furthermore, as mentioned in Section A, Information Security            OPM has not
Governance, OPM has not developed a comprehensive server,               documented baseline
database and applications inventory. As a result, we are not able to    configurations for
independently verify whether OPM has created baseline                   all operating
configurations for all of the operating platforms it uses. However,     platforms used in its
we do know from our test work that the following operating              environment.
platforms do exist in OPM’s environment, but do not have a
documented baseline:            ,          ,        , and           .

NIST SP 800-53 Revision 4 requires agencies to develop, document, and maintain a current
baseline configuration of the information system. A baseline should serve as a formally
approved standard outlining how to securely configure various operating platforms. Without
an approved baseline, there is no standard against which actual configuration settings can be
measured, increasing the risk that insecure systems exist in the operating environment.

Recommendation 8 (Rolled Forward from 2014)
We recommend that the OCIO develop and implement a baseline configuration for all
operating platforms in use by OPM including, but not limited to,   ,          ,               ,
and             .

OCIO Response:
“OCIO partially concurs with the recommendation. While we agree that a baseline
configuration should be developed for all operating platforms on the network, all of the
operating platforms identified specifically in the recommendation do not exist as operating
platforms on the network. OCIO will use the comprehensive asset inventory developed in
conjunction with recommendation 1 to [develop] baseline configurations for the applicable
operating platforms. Further, implementation of network access control appliances will
prevent unauthorized devices with unauthorized operating systems from connecting to the
OPM network.”

OIG Comment:
All of the operating platforms listed in the recommendation did exist in the OPM
environment at some point in the past year. If these platforms are no longer used at OPM,
then yes, we agree that there is no need to develop a baseline configuration for them. Once
OPM has developed a comprehensive asset inventory and developed baselines for all



                                            15                          Report No. 4A-CI-00-15-011
   operating platforms that the agency does use, it should provide IOC with relevant supporting
   documentation.

c) United States Government Computer Baseline Configuration
   OPM user workstations are built with a standard image that is compliant with the United
   States Government Baseline Configuration. Any deviations deemed necessary by the agency
   from the configurations are documented within each operating platform’s baseline
   configuration.

   We conducted an automated scan of the           standard image to independently verify
   compliance with OPM’s baseline. Nothing came to our attention to indicate that there are
   weaknesses in OPM’s methodology to securely configure user workstations.

d) Compliance with baselines
   The OCIO uses automated scanning tools to conduct routine compliance audits on many of
   the operating platforms used in OPM’s server environment. These tools compare the actual
   configuration of servers and workstations to the approved baseline configuration. However,
   as mentioned above, there are operating platforms used by OPM that do not have
   documented baseline configurations, and therefore it is impossible to subject these systems to
   adequate compliance audits.

   NIST SP 800-53 Revision 4 requires agencies to audit activities associated with information
   system configurations.

   Recommendation 9 (Rolled Forward from 2014)
   We recommend the OCIO conduct routine compliance scans against established baseline
   configurations for all servers and databases in use by OPM. This recommendation cannot be
   addressed until Recommendation 8 has been completed.

   OCIO Response:
   “OCIO concurs with the recommendation. OCIO currently conducts routine compliance
   scans for existing baseline configurations and will extend scans to cover new baselines
   identified by remediating recommendation 8 once new operating systems and databases
   are identified and baselines are established.”

e) Documented change management process
   The OCIO has developed a Configuration Change Control Policy           OPM has a
   that outlines a formal process to approve and document all             documented change
   computer software and hardware changes. OPM utilizes a software        management process.



                                              16                           Report No. 4A-CI-00-15-011
   application to manage, track, and document change requests.

   In FY 2015, OPM acquired and implemented a software product that has the capability to
   detect, approve, and revert all changes made to information systems. Nothing came to our
   attention to indicate that there are weaknesses in OPM’s software and hardware change
   procedures. However, as mentioned above, no software tool can be fully effective if OPM
   does not have a good grasp of the inventory of assets that the tool must be applied against.

f) OPM’s vulnerability scanning program
                                                                         We detected a variety
   OPM performs some form of automated network vulnerability             of issues with OPM’s
   scanning on a bi-weekly basis. However, as mentioned                  vulnerability
   throughout this report, OPM’s lack of a complete system               management program.
   inventory makes it impossible to attest that controls of this nature
   are adequate and comprehensive. Furthermore, our test work identified issues with the
   inventory documentation that OPM does maintain for vulnerability scanning purposes, as we
   found information systems residing in areas of the network that were labeled as empty by
   OPM. Without a complete inventory, OPM is unable to ensure that all systems within the
   network environment are being scanned routinely for weaknesses.

   In addition to our concerns that OPM is not conducting vulnerability scans on its entire
   environment, we also identified issues with the scans that do take place. OPM runs
   vulnerability scans using the credentials of a “service level” account. However, the scanning
   tool used by OPM actually requires “administrator” credentials to be fully effective. This
   access level is necessary to conduct the scanning, as it allows the automated tool to run a full
   uninhibited check for any vulnerabilities that are present within the information system.
   Without this level of access, an organization cannot ensure that the tool completed all of its
   checks and that the results from the scans are reliable. We reviewed reports that indicate
   numerous OPM systems are being routinely scanned with credentials that do not have
   sufficient access rights for a comprehensive vulnerability check.

   In addition, while the OCIO has documented “accepted” weaknesses for OPM user
   workstations, it has not fully documented accepted weaknesses (i.e., vulnerabilities whose
   risk has been accepted due to a business need) for servers or databases. A recommendation
   related to this issue remains open from FY 2011 and is rolled forward again this year.

   Finally, OPM has not implemented a process to centrally track the current status of security
   weaknesses identified during vulnerability scans to remediation or risk acceptance, and we
   have concerns that OPM is not remediating known vulnerabilities in a timely manner.




                                                17                           Report No. 4A-CI-00-15-011
   In conclusion, we remain unable to independently attest that OPM has a mature vulnerability
   scanning program, and must indicate as such on the FISMA metrics provided to OMB.

   Recommendation 10 (Rolled Forward from 2014)
   We recommend that the OCIO implement a process to ensure routine vulnerability scanning
   is conducted on all network devices documented within the inventory.

   OCIO Response: 

   “OCIO concurs with the recommendation. OCIO will use the inventory created by

   remediating recommendation 1 to help ensure that vulnerability scanning is performed on 

   all network devices and errors are corrected in a timely manner.” 


   Recommendation 11 (Rolled Forward from 2014)
   We recommend that the OCIO implement a process to centrally track the current status of
   security weaknesses identified during vulnerability scans to remediation or risk acceptance.

   OCIO Response: 

   “OCIO concurs with the recommendation. OCIO is working with the Department of

   Homeland Security (DHS), as part of the Continuous Diagnostics and Mitigation (CDM) 

   Program, to implement and integrate the tools necessary to meet this recommendation.” 


   Recommendation 12 (Rolled Forward from 2011)
   We recommend that the OCIO document “accepted” weaknesses identified in vulnerability
   scans.

   OCIO Response: 

   “OCIO concurs with the recommendation. OCIO will follow its standard process for 

   documenting acceptances of risk for weaknesses identified in vulnerability scans.” 


   OIG Comment:
   We are not aware of an existing standard process for documenting acceptance of risks for
   weaknesses identified in vulnerability scans. If such a process exists, we recommend that the
   OCIO provide IOC with relevant supporting documentation.

g) Vulnerabilities identified through OIG scanning
   We worked with OCIO personnel to conduct independent vulnerability scans of OPM’s
   information systems. The results and findings of our vulnerability scanning test work is
   detailed below.




                                               18                          Report No. 4A-CI-00-15-011
     Unsupported software
     The results of our vulnerability scans indicated that OPM’s production environment contains
     severely out-of-date and unsupported software and operating platforms. This means that the
     vendor no longer provides patches, security fixes, or updates for the software.

     Recommendation 13
     We recommend the OCIO implement a process to ensure that only supported software and
     operating platforms are utilized within the network environment.

     OCIO Response:
     “OCIO concurs with the recommendation. In FY 2016, OCIO will implement a software
     configuration management tool in support of Enterprise Architecture that prevents
     unapproved software and operating platforms from being implemented within the network
     environment. OCIO currently has several controls that assist in preventing unapproved
     software from being implemented in the network, such as requiring administrator
     privileges to download software.”

     Patch management
     The OCIO has implemented a process to apply operating system patches on all devices
     within OPM’s network on a weekly basis. The OCIO also utilizes a third party patching
     software management program to manage and maintain all non-operating system software.
     However, our scans determined that although the problems are less severe than in prior years,
     numerous servers are not patched in a timely fashion. Once again, OPM’s lack of a
     comprehensive inventory makes it impossible for us or the OCIO to determine how many
     servers are not receiving timely patches.

     Recommendation 14 (Roll Forward from 2014)
     We recommend the OCIO implement a process to apply operating system and third party
     vendor patches in a timely manner, which is defined within the OPM Information Security
     and Privacy Policy Handbook.

     OCIO Response:
     “OCIO concurs with the recommendation. Significant progress was made in FY 2015 to
     apply available patches, and OCIO recognizes additional work is necessary to build a
     sustainable and measurable process. OCIO will continue to refine its processes for patch
     management.”

E. Identity and Access Management
  The following sections detail OPM’s account and identity management program.



                                                19                          Report No. 4A-CI-00-15-011
a) Policies for account and identity management
   OPM maintains policies and procedures for agency-wide account and identity management
   within the OCIO Information Security and Privacy Policy Handbook. The policies contain
   procedures for creating user accounts with the appropriate level of access as well as
   procedures for removing access for terminated employees.

b) Terminated employees
   OPM maintains policies related to management of user accounts for its local area network
   (LAN) and its mainframe environments. Both policies contain procedures for creating user
   accounts with the appropriate level of access as well as procedures for removing access for
   terminated employees.

   We conducted a test comparing the current Windows and mainframe active user lists against
   a list of terminated employees from the past year. Nothing came to our attention to indicate
   that there are weaknesses in OPM’s procedures for removing system access for terminated
   employees.

c) Multi-factor authentication with PIV
   OMB Memorandum M-11-11 required all Federal information              No OPM
   systems to be upgraded to use PIV credentials for multi-factor       applications require
   authentication by the beginning of FY 2012. In addition, the         PIV authentication.
   memorandum stated that all new systems under development must
   be PIV compliant prior to being made operational, and that agencies must be compliant with
   the memorandum prior to using technology refresh funds to complete other activities.

   Approximately 97 percent of laptops procured and configured by OPM require PIV
   authentication to log into that device. However, throughout FY 2015 there were no controls
   enforced that require two-factor authentication to connect other devices to the network. In
   other words, users could gain access to OPM’s network without two-factor authentication by
   simply connecting with a personal device. Therefore, very few, if any, OPM users were
   technically required to log onto the network with two-factor PIV authentication. The only
   exception would be users that exclusively telework and do not have physical access to any
   OPM facility.

   In early FY 2016 (after our draft audit report was issued), OPM began rolling out controls
   that would prevent non-OPM issued devices from connecting to the network. This control
   closes the loophole that allowed users to gain access to the network without PIV
   authentication.




                                              20                          Report No. 4A-CI-00-15-011
     Although OPM has made some progress in requiring PIV authentication to unlock OPM-
     issued devices, this does not meet OMB mandates related to two-factor authentication. OMB
     Memorandum M-11-11 states that PIV credentials must be used to gain authorized access to
     an agency’s 1) facilities, 2) network, and 3) information systems. Even if OPM implements
     controls that prevent the connection of personal devices to its network, it is not fully PIV
     compliant until all of its information systems (applications) can be accessed only via PIV
     authentication in lieu of a username and password. Our audit work indicated that none of
     OPM’s 46 major applications enforced PIV authentication. This is a critical component
     because without enforcing PIV authentication at the application level, users of the network
     (either authorized or unauthorized) could still gain access to applications that they are not
     authorized to use, and public-facing systems are more vulnerable to remote attack.

     Recommendation 15                                                       In early FY 2016
     We recommend that the OCIO require PIV authentication to access         OPM implemented
     the OPM network.                                                        controls that enforce
                                                                             PIV authentication
     OCIO Response:                                                          to access the
     “This recommendation has been remediated and verified by the            network.
     OIG.”

     OIG Comment:
     OPM has addressed this recommendation, no further action is required.

     Recommendation 16 (Rolled Forward from 2012)
     We recommend that the OCIO meet the requirements of OMB M-11-11 by upgrading its
     major information systems to require multi-factor authentication using PIV credentials.

     OCIO Response:
     “OCIO concurs with the recommendation. OCIO will follow its planned schedule for
     enforcing multi-factor authentication, including the use of PIV credentials wherever
     feasible.”

F. Incident Response and Reporting
  OPM’s Incident Response and Reporting Guide outlines the responsibilities of OPM’s Situation
  Room and documents procedures for reporting all IT security events to the appropriate entities.
  We evaluated the degree to which OPM is following its internal procedures and FISMA
  requirements for reporting security incidents internally, to the United States Computer
  Emergency Readiness Team (US-CERT), and to appropriate law enforcement authorities.




                                                21                           Report No. 4A-CI-00-15-011
a) Identifying and reporting incidents internally
   OPM’s Incident Response and Reporting Guide requires any user of the agency’s IT
   resources to immediately notify OPM’s Situation Room when IT security incidents occur.
   OPM reiterates this requirement in an annual mandatory IT security and privacy awareness
   training course.

b) Reporting incidents to US-CERT and law enforcement
   OPM’s Incident Response and Reporting policy states that OPM’s           OPM’s Acting
   Situation Room is responsible for sending incident reports to US-        Director has taken
   CERT on security incidents. OPM notifies US-CERT within one              steps to ensure that
   hour of a reportable security incident occurrence.                       OIG is timely
   The Incident Response and Reporting policy also states that              notified about any
   security incidents should be reported to law enforcement                 future security
   authorities, where appropriate. The OIG’s Office of Investigations       incidents.
   is part of the incident response notification distribution list, and
   should be notified when security incidents occur. However, the OIG was not notified on a
   timely basis of the major data breach that occurred in FY 2015. Failure to notify OIG
   investigators and auditors about the incidents in a timely manner had a negative impact on
   our ability to coordinate with other law enforcement organizations and conduct audit
   oversight activity. We brought this issue to the attention of OPM’s new Acting Director, and
   she assured us that steps have been taken to ensure we will be directly and immediately
   informed of any future incidents on a timely basis.

c) Detecting, monitoring, and responding to security incidents
   OPM owns a security information and event management (SIEM) tool with the technical
   ability to automatically detect, analyze, and correlate potential security incidents over time.
   We noted in the FY 2014 FISMA audit report that the tool only received event data from
   approximately 80 percent of major OPM information systems. In FY 2015, the SIEM now
   receives event data from all known OPM systems. We also reported last year that the tool
   needs to be configured to collect relevant and meaningful data so the potential security alerts
   contain fewer false-positives. The OPM systems currently providing data to the SIEM are
   over-reporting log and event data, which results in an excessive amount of data for security
   analysts to review. The number of alerts that security analysts must review and identify as
   false-positive creates a backlog that could cause a delay in identifying and responding to
   actual incidents. We have not been provided any evidence that this issue has been resolved.

   The recent data breach was a clear indictor that OPM could improve its incident detecting
   and monitoring capabilities. In response to the breach, OPM procured many new security
   tools that are intended to better prevent and detect incidents. While it is good that OPM is



                                               22                           Report No. 4A-CI-00-15-011
      attempting to improve its incident detection and monitoring capabilities, we learned that all
      of these tools have not been fully implemented or optimized. We believe that it is too early
      to tell if these tools are actually improving OPM’s incident response capabilities. We will
      follow up on the implementation of security tools in next year’s FISMA audit.

      NIST 800-53 Revision 4 states that an organization must implement “an incident handling
      capability for security incidents that includes preparation, detection and analysis,
      containment, eradication, and recovery.” The organization should also employ “automated
      mechanisms to support the incident handling process.”

      Recommendation 17 (Rolled Forward from FY 2014)
      We recommend that OCIO configure its security information and event management tool to
      collect and report meaningful data, while reducing the volume of non-sensitive log and event
      data.

      OCIO Response: 

      “OCIO concurs with the recommendation. We will configure the filtering capability of the 

      security information and event management tool to meet OPM requirements, reducing 

      unnecessary event logs and event data where possible.”


      OIG Comment:
      OPM addressed this recommendation in early FY 2016 (after the draft audit report was
      issued); no further action is required.

G. Risk Management
  NIST SP 800-37 Revision 1 “Guide for Applying the Risk Management Framework to Federal
  Information Systems” (Guide) provides Federal agencies with a framework for implementing an
  agency-wide risk management methodology. The Guide suggests that risk be assessed in
  relation to the agency’s goals and mission from a three-tiered approach:
     Tier 1: Organization (Governance); 

     Tier 2: Mission/Business Process (Information and Information Flows); and, 

     Tier 3: Information System (Environment of Operation). 


  NIST SP 800-39 “Managing Information Security Risk – Organization, Mission, and 

  Information System View” provides additional details of this three-tiered approach. 





                                                  23                           Report No. 4A-CI-00-15-011
a) Agency-wide Risk Management
   NIST SP 800-39 states that agencies should establish and implement “Governance structures
   [that] provide oversight for the risk management activities conducted by organizations and
   include:
   (i)	 the establishment and implementation of a risk executive (function);
   (ii)	 the establishment of the organization’s risk management strategy including the 

         determination of risk tolerance; and, 

   (iii) the development and execution of organization-wide investment strategies for 

         information resources and information security.” 


   In FY 2011 the OCIO organized a group comprised of several IT security professionals to
   fulfill the Risk Executive Function. However, as of the end of FY 2015, the group still does
   not have an approved charter, and therefore does not have clearly defined responsibility and
   authority for risk management activity at OPM. In addition, the 12 primary elements of the
   Risk Executive Function as described in NIST SP 800-39 are not all fully implemented. Key
   elements still missing from OPM’s approach to managing risk at an agency-wide level
   include: conducting a risk assessment, maintaining a risk registry, communicating the
   agency-wide risks down to the system owners, and ensuring proper authorization of agency
   information systems.

   Recommendation 18 (Rolled Forward from 2011)
   We recommend that OPM continue to develop its Risk Executive Function to meet all of the
   intended requirements outlined in NIST SP 800-39, section 2.3.2 Risk Executive (Function).

   OCIO Response: 

   “OCIO partially concurs with this finding. While we believe the Risk Executive Function 

   is important for OPM-wide risk management, OCIO can only manage risk associated with 

   its portfolio. To that end, OCIO will use its IT governance processes and other governance 

   processes, such as the annual Federal Financial Managers’ Integrity Act (FMFIA) 

   internal control processes, to manage risks within the OCIO portfolio.”


   OIG Comment:
   The OCIO should continue its efforts to manage risks associated with OPM’s technology
   portfolio, and the OPM Director should assign responsibility for implementing the elements
   of an agency-wide risk management program that are not covered by the OCIO.

b) System Specific Risk Management
   NIST SP 800-37 Revision 1 outlines a risk management framework (RMF) that contains six
   primary steps, including “(i) the categorization of information and information systems; (ii)



                                               24 	                        Report No. 4A-CI-00-15-011
     the selection of security controls; (iii) the implementation of security controls; (iv) the
     assessment of security control effectiveness; (v) the authorization of the information system;
     and (vi) the ongoing monitoring of security controls and the security state of the information
     system.”

     The OCIO has implemented the six-step RMF into its system-specific risk management
     activities through the Authorization process. In addition, OPM policy requires each major
     information system to be subject to routine security controls testing though a continuous
     monitoring program (see Continuous Monitoring section C).

H. Security Training
  FISMA requires all government employees and contractors to take IT security awareness training
  on an annual basis. In addition, employees with IT security responsibility are required to take
  additional specialized training.

  a) IT security awareness training                                         Over 99 percent of
     The OCIO provides annual IT security and privacy awareness             OPM employees and
     training to all OPM employees through an interactive web-based         contractors completed
     course. The course introduces employees and contractors to the         IT security awareness
     basic concepts of IT security and privacy, including topics such as training.
     the importance of information security, security threats and
     vulnerabilities, viruses and malicious code, privacy training, telework, mobile devices, Wi-Fi
     guidance, and the roles and responsibilities of users.

     Over 99 percent of OPM’s employees and contractors completed the security awareness
     training course in FY 2015.

  b) Specialized IT security training
     OPM employees with significant information security responsibilities are required to take
     specialized security training in addition to the annual awareness training.

     The OCIO has developed a table outlining the security training requirements for specific job
     roles. The OCIO uses a spreadsheet to track the security training taken by employees that
     have been identified as having security responsibility. Only 65 percent of employees
     identified as having significant security responsibilities completed special IT training in FY
     2015.




                                                 25                           Report No. 4A-CI-00-15-011
     Recommendation 19
     We recommend that the OCIO ensure that all employees with significant information
     security responsibility take meaningful and appropriate specialized security training on an
     annual basis.

     OCIO Response: 

     “OCIO concurs with this recommendation. OCIO will establish training plans for

     personnel with significant information security responsibility and track progress toward 

     completion of approved classes.” 


I. Plan of Action & Milestones (POA&M)
  A POA&M is a tool used to assist agencies in identifying, assessing, prioritizing, and monitoring
  the progress of corrective efforts for IT security weaknesses. The sections below detail OPM’s
  effectiveness in using POA&Ms to track the agency’s security weaknesses.

  a) POA&Ms incorporate all known IT security weaknesses
     In November 2014, the OIG issued the FY 2014 FISMA audit report with 29 audit
     recommendations. However, only 13 of the 29 recommendations were appropriately
     incorporated into the OCIO master POA&M. We have not seen how or if the remaining 16
     recommendations were documented.

     Failure to incorporate all known IT security weaknesses into the associated POA&M limits
     the agency’s ability to effectively identify, assess, prioritize, and monitor the progress of the
     corrective efforts to remediate identified weaknesses. The following program offices failed
     to update their system’s POA&Ms to document all known security weaknesses:
        Federal Investigative Services (three systems); 

        Office of the Inspector General (one system); and 

        Human Resource Solutions (one system). 


     Recommendation 20 (Rolled Forward from 2014)
     We recommend that the OCIO and program offices that own information systems ensure that
     all known security weaknesses are incorporated into the appropriate POA&M.

     OCIO Response:
     “OCIO concurs with the recommendation. While the vast majority of weaknesses were
     incorporated into the appropriate POA&M, we acknowledge that a few weaknesses were
     not added timely. We will update our POA&M process accordingly to assure that
     weaknesses are added timely in the future.”




                                                   26                           Report No. 4A-CI-00-15-011
b) Prioritize Weaknesses
   Each program office at OPM is required to prioritize the security weaknesses on their
   POA&Ms to help ensure significant IT issues are addressed in a timely manner. We verified
   the POA&Ms that were provided did identify and prioritize each security weakness.

c) Effective Remediation Plans and Adherence to Remediation Deadlines
   Many system owners are not meeting the self-imposed remediation deadlines listed on the
   POA&Ms. Only 5 of OPM’s 46 systems do not have POA&M items that are greater than
   120 days overdue. We issued an audit recommendation in FY 2012 related to overdue
   POA&M items, and that recommendation was closed during this fiscal year based on
   evidence provided at the time. However, our subsequent test work determined that
   adherence to POA&M deadlines continues to be an issue, therefore we are issuing this
   recommendation once again for FY 2015. The 41 systems with overdue POA&M items are
   owned by:
      Office of the Chief Financial Officer (two systems); 

      Office of the Chief Information Officer (nine systems); 

      Employee Services (three systems); 

      Federal Investigative Services (seven systems); 

      Healthcare and Insurance (three systems); 

      Human Resource Solutions (seven systems); 

      Office of the Inspector General (four systems); and 

      Retirement Services (six systems). 


   Recommendation 21
   We recommend that the OCIO and system owners develop formal corrective action plans to
   remediate all POA&M weaknesses that are over 120 days overdue.

   OCIO Response: 

   “OCIO concurs with the recommendation. OCIO will create a corrective action plan for 

   weaknesses that are more than 120 days overdue.” 


d) Identifying Resources to Remediate Weaknesses
   Only 40 of OPM’s 46 systems appropriately identify the resources needed to address 

   POA&M weaknesses, as required by OPM’s POA&M policy. 


   We issued an audit recommendation in FY 2014 related to resources not being identified to
   resolve POA&M items, and that recommendation was closed during this fiscal year based on
   evidence provided at that time. However, on our subsequent test work we determined that



                                               27                        Report No. 4A-CI-00-15-011
     the necessary resources to remediate vulnerabilities are still not being identified on system
     POA&Ms for systems owned by:
        Office of the Chief Information Officer (two systems); 

        Human Resource Solutions (two systems); 

        Federal Investigative Services (two systems). 


     Recommendation 22
     We recommend that all POA&Ms list the specific resources required to address each security
     weakness identified.

     OCIO Response: 

     “OCIO concurs with the recommendation. OCIO will include in its POA&Ms resources 

     required to remediate security weaknesses.”


  e) Supporting Documentation for Closing POA&Ms
     The OCIO requires program offices to provide the evidence, or “proof of closure,” that
     security weaknesses have been resolved before officially closing the related POA&M. When
     the OCIO receives a proof of closure document from the program offices for a POA&M
     item, an OCIO staff member will judgmentally review the documentation to determine
     whether or not the evidence provided was appropriate. Nothing came to our attention to
     indicate problems with the OCIO’s process for closing POA&M items.

J. Remote Access Management
  OPM has implemented policies and procedures related to authorizing, monitoring, and
  controlling all methods of accessing the agency’s network resources from a remote location. In
  addition, OPM has issued agency-wide telecommuting policies and procedures, and all
  employees are required to sign a Rules of Behavior document that outlines their responsibility
  for the protection of sensitive information when working remotely.

  OPM utilizes a Virtual Private Network (VPN) client to facilitate secure remote access to the
  agency’s network environment. The OPM VPN requires the use of an individual’s PIV card and
  password authentication to uniquely identify users. The OIG has reviewed the VPN access list to
  ensure that there are no shared accounts and that each user account has been tied to an individual.
  The agency maintains logs of individuals who remotely access the network, and the logs are
  reviewed on a monthly basis for unusual activity or trends.

  Although there are still a small number of authorized network devices that are not compliant
  with PIV cards (e.g.,       ), these devices still require multi-factor authentication for remote
  access through the use of RSA tokens and password authentication.


                                                   28                            Report No. 4A-CI-00-15-011
  In previous years, we discovered that remote access sessions do not terminate or lock out after 30
  minutes of inactivity as required by FISMA. OPM has acknowledged the issue and stated that
  the weakness has not been remediated and a project is in place to address this. The scheduled
  completion date for the project is May 2016.

  Recommendation 23 (Rolled Forward from 2012)
  We recommend the OCIO configure the VPN servers to terminate VPN sessions after 30 minutes
  of inactivity.

  OCIO Response:
  “OCIO concurs with the recommendation. We have thoroughly analyzed and investigated this
  matter. Virtual Private Network (VPN) appliances are configured and have been validated to
  terminate connections to the network after 30 minutes of inactivity. Some applications,
  agents, and software purposefully run in the background because they take a prolonged period
  of time to complete or because they periodically refresh data to the device. This is valid and
  authorized activity. Thus, OCIO believes the VPN appliance is working in accordance with
  the intended configuration setting.”

  OIG Comment:
  As part of the audit resolution process, we recommend that the OCIO provide IOC with a list of
  the applications, agents, and software that prevents a VPN session from terminating after 30
  minutes. We will work with IOC to evaluate whether it is appropriate to close this
  recommendation.

K. Contingency Planning
  OPM’s Information Security Privacy and Policy Handbook requires a contingency plan to be in
  place for each information system and that each system’s contingency plan be tested on an
  annual basis. The sections below detail our review of contingency planning activity in FY 2015.

  a) Documenting contingency plans of individual OPM systems
     We received contingency plans for 23 out of 46 information systems on OPM’s master
     system inventory. The following program offices failed to submit adequate contingency
     planning documentation for one or more systems that they own:
        Office of the Chief Financial Officer (two systems); 

        Office of the Chief Information Officer (six systems); 

        Employee Services (three systems); 

        Federal Investigative Services (one system); 

        Office of Healthcare and Insurance (two systems); 

        Human Resource Solutions (four systems); and 



                                                 29                           Report No. 4A-CI-00-15-011
      Office of Retirement Services (five systems).

   According to OPM’s Information Security and Privacy Policy Handbook, “Contingency
   Plans shall be reviewed, updated, and tested at least annually to ensure its effectiveness.”
   Failure to document contingency plans increases the risk that agency information systems
   will not be recovered in a timely manner and that critical data could be lost.

   Recommendation 24 (Rolled Forward from FY2014)
   We recommend that the OCIO ensure that all of OPM’s major systems have Contingency
   Plans in place and that they are reviewed and updated annually.

   OCIO Response: 

   “OCIO concurs with the recommendation. OCIO will ensure contingency plans are 

   reviewed and updated annually.” 


b) Testing contingency plans of individual OPM systems
   OPM’s Information Security Privacy and Policy Handbook requires that the contingency
   plan for each information system be tested at least annually using information system
   specific tests and exercises. We received evidence that contingency plans were tested for
   only 18 of OPM’s 46 systems in FY 2015. This is a significant decrease from the number of
   systems that were tested in FY 2014. The following program offices failed to submit
   adequate documentation for one or more systems that they own:
      Office of the Chief Financial Officer (two systems); 

      Office of the Chief Information Officer (seven systems); 

      Employee Services (three systems); 

      Federal Investigative Services (three systems); 

      Healthcare and Insurance (two systems);

      Human Resources Solutions (six systems); and 

      Retirement Services (five systems). 


   Of the contingency plan tests we did receive, we noted improved quality in documentation as
   it relates to the analysis or “lessons learned” section of the report. However, due to the
   significantly low number of tests received, we cannot conclude that OPM has improved the
   overall quality and consistency of its contingency plan testing methodology.

   NIST SP 800-34 Revision 1 states that following a contingency plan test, “results and lessons
   learned should be documented and reviewed by test participants and other personnel as
   appropriate. Information collected during the test and post-test reviews that improve plan
   effectiveness should be incorporated into the contingency plan.”


                                               30                           Report No. 4A-CI-00-15-011
     Recommendation 25 (Rolled Forward from 2008)
     We recommend that OPM’s program offices test the contingency plans for each system on an
     annual basis. The contingency plans should be immediately tested for the 29 systems that
     were not subject to adequate testing in FY 2015.

     OCIO Response:
     “OCIO concurs with the recommendation. OCIO will test contingency plans annually.”

  c) Testing contingency plans of OPM general support systems
     In the FY 2011 FISMA audit report we recommended that the               OPM conducted
     OCIO implement a centralized (agency-wide) approach to                  tests of its general
     contingency plan testing. The intent of the recommendation is to        support system
     ensure that all elements of the general support systems are subject     contingency plans.
     to a full functional disaster recovery test each year. This
     recommendation has been remediated in FY 2015 and is now closed.

     Many OPM systems reside on one of the agency’s general support systems. The OCIO
     typically conducts a full recovery test at the backup location of the Enterprise Server
     Infrastructure general support system (i.e., the mainframe and associated systems) on an
     annual basis. In FY 2015 a successful functional contingency plan test was conducted and
     documented that involved OPM’s Enterprise Server Infrastructure and the LAN/WAN
     general support system.

L. Contractor Systems
  We evaluated the methods that the OCIO and various program offices use to maintain oversight
  of their systems operated by contractors on behalf of OPM.

  a) Contractor system documentation
     OPM’s master system inventory indicates that 17 of the agency’s 46 major applications are
     operated by a contractor.

     In the past, the OCIO maintained a separate spreadsheet documenting interfaces between
     OPM and contractor-operated systems and the related Interconnection Security Agreements
     (ISA). However, we were told that the spreadsheet was not maintained in FY 2015. NIST
     SP 800-47, Security Guide for Interconnecting Information Technology Systems, states that
     improperly designed interconnections could result in security failures that compromise the
     connected systems and the data that they store, process, or transmit. Failure to maintain valid
     ISAs could introduce risks similar to improperly designed interconnections.




                                                 31                          Report No. 4A-CI-00-15-011
The OCIO did not provide evidence that they track Memoranda of Understanding/Agreement
(MOU/A). These documents outline the terms and conditions for sharing data and
information resources in a secure manner. The OCIO should track MOU/As to ensure that
valid agreements are in place for each documented ISA.

Recommendation 26 (Rolled Forward from 2014)
We recommend that the OCIO ensure that all ISAs are valid and properly maintained.

OCIO Response: 

“OCIO concurs with the recommendation. OCIO will update its processes for identifying, 

controlling, and maintaining interconnections and their associated documentation.” 


Recommendation 27 (Rolled Forward from 2014)
We recommend that the OCIO ensure that a valid MOU/A exists for every interconnection.

OCIO Response:
Recommendation 27 was combined with Recommendation 26 in the draft audit report. The
OCIO response to Recommendation 26 applies to this recommendation as well.




                                         32                         Report No. 4A-CI-00-15-011
 IV. MAJOR CONTRIBUTORS TO THIS REPORT

Information Systems Audit Group

              , Lead IT Auditor-In-Charge
           , Lead IT Auditor
                  , Lead IT Auditor
                     , IT Auditor
            , IT Auditor
             , IT Auditor
                 , IT Auditor
                   , IT Auditor
______________________________________________________________________________

                , Group Chief




                                            33              Report No. 4A-CI-00-15-011
                                                                                 Appendix I                                                    page 1 of 4

                                                           Status of Prior OIG Audit Recommendations

    The tables below outline the current status of prior audit recommendations issued in FY 2014 by the Office of the Inspector General.

        Report No. 4A-CI-00-14-016: FY 2014 Federal Information Security Management Act Audit, issued November 12, 2014

Rec #                       Original Recommendation                                        Recommendation History                      Current Status
         We recommend that OPM implement a centralized information security
         governance structure where all information security practitioners,          Roll-forward from OIG Reports:
         including designated security officers, report to the CISO. Adequate         4A-CI-00-10-019 Recommendation 4,
         resources should be assigned to the OCIO to create this structure.
1                                                                                     4A-CI-00-11-009 Recommendation 2,       CLOSED 9/30/2015
         Existing designated security officers who report to their program offices
         should return to their program office duties. The new staff that reports     4A-CI-00-12-016 Recommendation 1, and
         to the CISO should consist of experienced information security               4A-CI-00-13-021 Recommendation 1
         professionals.
                                                                                     Roll-forward from OIG Report:
         We recommend that the OCIO develop a plan and timeline to enforce                                                     OPEN: Rolled-forward as Report
2                                                                                     4A-CI-00-13-021 Recommendation 2,
         the new SDLC policy to all of OPM’s system development projects.                                                      4A-CI-00-15-011 Recommendation 2

         We recommend that all active systems in OPM’s inventory have a
                                                                                                                               OPEN: Rolled-forward as Report
3        complete and current Authorization.                                         Recommendation new in FY 2014
                                                                                                                               4A-CI-00-15-011 Recommendation 3

         We recommend that the performance standards of all OPM system
         owners be modified to include a requirement related to FISMA
                                                                                                                               OPEN: Rolled-forward as Report
4        compliance for the information systems they own. At a minimum,              Recommendation new in FY 2014
                                                                                                                               4A-CI-00-15-011 Recommendation 4
         system owners should be required to ensure that their systems have
         valid Authorizations.
         We recommend that the OPM Director consider shutting down                                                             OPEN: Rolled-forward as Report
5                                                                                    Recommendation new in FY 2014
         information systems that do not have a current and valid Authorization.                                               4A-CI-00-15-011 Recommendation 5
                                                                                     Roll-Forward from OIG Report:
         We recommend that the OCIO continue to develop its Risk Executive
         Function to meet all of the intended requirements outlined in NIST SP        4A-CI-00-11-009 Recommendation 6,       OPEN: Rolled-forward as Report
6
         800-39, section 2.3.2 Risk Executive (Function).                             4A-CI-00-12-016 Recommendation 2, and   4A-CI-00-15-011 Recommendation 18
                                                                                      4A-CI-00-13-021 Recommendation 3
                                                                                                                                           page 2 of 4

                                                        Status of Prior OIG Audit Recommendations

     We recommend that the OCIO develop and implement a baseline
                                                                                                                           OPEN: Rolled-forward as Report
7    configuration for all operating platforms in use by OPM including, but      Recommendation new in 2014
                                                                                                                           4A-CI-00-15-011 Recommendation 8
     not limited to,         ,         ,        , and            .
     We recommend the OCIO conduct routine compliance scans against
     established baseline configurations for all servers and databases in use                                              OPEN: Rolled-forward as Report
8                                                                                Recommendation new in 2014
     by OPM. This recommendation cannot be addressed until                                                                 4A-CI-00-15-011 Recommendation 9
     Recommendation 7 has been completed.
     We recommend the OCIO implement technical controls that prevent
9                                                                                Recommendation new in 2014                CLOSED 8/26/2015
     configuration changes without proper documentation and approvals.
     We recommend that the OCIO develop and maintain a comprehensive
                                                                                                                           OPEN: Rolled-forward as Report
10   inventory of all servers, databases, and network devices that reside on     Recommendation new in 2014
                                                                                                                           4A-CI-00-15-011 Recommendation 1
     the OPM network.
     We recommend that the OCIO implement a process to ensure routine
                                                                                                                           OPEN: Rolled-forward as Report
11   vulnerability scanning is conducted on all network devices documented       Recommendation new in 2014
                                                                                                                           4A-CI-00-15-011 Recommendation 10
     within the inventory.
     We recommend that the OCIO implement a process to centrally track
                                                                                                                           OPEN: Rolled-forward as Report
12   the current status of security weaknesses identified during vulnerability   Recommendation new in 2014
                                                                                                                           4A-CI-00-15-011 Recommendation 11
     scans to remediation or risk acceptance.
                                                                                 Roll-forward from OIG Reports:
     We recommend that the OCIO document “accepted” weaknesses
     identified in vulnerability scans.                                           4A-CI-00-11-009 Recommendation 9,       OPEN: Rolled-forward as Report
13
                                                                                  4A-CI-00-12-016 Recommendation 4, and   4A-CI-00-15-011 Recommendation 12
                                                                                  4A-CI-00-13-021 Recommendation 6
     We recommend the OCIO implement a process to apply operating
     system and third party vendor patches in a timely manner, which is
                                                                                 Recommendation new in 2014                OPEN: Rolled-forward as Report
14   defined within the OPM Information Security and Privacy Policy
                                                                                                                           4A-CI-00-15-011 Recommendation 14
     Handbook.

     We recommend that the OCIO expand the capabilities of the ENSOC to
     ensure that security incidents from all OPM-operated information            Recommendation new in 2014
15                                                                                                                         CLOSED: 9/30/2015
     systems are centrally analyzed and correlated.
                                                                                                                                   page 3 of 4

                                                    Status of Prior OIG Audit Recommendations


     We recommend that OCIO configure its security information and        Recommendation new in 2014
16   event management tool to collect and report meaningful data, while                                            CLOSED: 11/06/15
     reducing the volume of non-sensitive log and event data.
     We recommend that the OCIO and program offices that own              Recommendation new in 2014               OPEN: Rolled-forward as Report
17   information systems ensure that all known security weaknesses are                                             4A-CI-00-15-011 Recommendation 20
     incorporated into the appropriate POA&M.
     We recommend that the OCIO and system owners develop formal          Roll-forward from OIG Reports:           CLOSED: 1/16/15
18
     corrective action plans to remediate all POA&M weaknesses that are    4A-CI-00-12-016 Recommendation 8 and   Reissued as 4A-CI-00-15-011
     over 120 days overdue.
                                                                           4A-CI-00-13-021 Recommendation 8       Recommendation 21
     We recommend that all POA&Ms list the specific resources required                                             CLOSED: 11/12/14
19
     to address each security weakness identified.                        Recommendation new in 2014               Reissued as 4A-CI-00-15-011
                                                                                                                   Recommendation 22
     We recommend the OCIO configure the VPN servers to terminate VPN     Roll-forward from OIG Reports:
     sessions after 30 minutes of inactivity.                             4A-CI-00-12-016 Recommendation 10 and    OPEN: Rolled-forward as Report
20
                                                                                                                   4A-CI-00-15-011 Recommendation 23
                                                                          4A-CI-00-13-021 Recommendation 10
     We recommend that the OCIO meet the requirements of OMB M-11-11      Roll-forward from OIG Reports:
     by upgrading its major information systems to require multi-factor   4A-CI-00-12-016 Recommendation 11 and    OPEN: Rolled-forward as Report
21
     authentication using PIV credentials.                                                                         4A-CI-00-15-011 Recommendation 16
                                                                          4A-CI-00-13-021 Recommendation 11
     We recommend that the OCIO expand its continuous monitoring
     program to include mandatory continuous monitoring for contractor-
     operated systems and implementation of the DHS Continuous
22                                                                        Recommendation new in 2014               CLOSED: 9/30/2015
     Diagnostic and Mitigation program as outlined in the OCIO’s
     continuous monitoring strategy.
                                                                                                                                        page 4 of 4

                                                     Status of Prior OIG Audit Recommendations


     We recommend that OPM ensure that an annual test of security controls    Roll-forward from OIG Reports:
     has been completed for all systems.                                       4A-CI-00-08-022 Recommendation 1,
                                                                               4A-CI-00-09-031 Recommendation 6,
                                                                                                                         OPEN: Rolled-forward as Report
23                                                                             4A-CI-00-10-019 Recommendation 10,
                                                                                                                         4A-CI-00-15-011 Recommendation 7
                                                                               4A-CI-00-11-009 Recommendation 11,
                                                                               4A-CI-00-12-016 Recommendation 14, and
                                                                               4A-CI-00-13-021 Recommendation 13
     We recommend that the OCIO ensure that all of OPM’s major systems                                                   OPEN: Rolled-forward as Report
24   have contingency plans in place and are reviewed and updated annually.   Recommendation new in 2014
                                                                                                                         4A-CI-00-15-011 Recommendation 24
     We recommend that OPM’s program offices test the contingency plans       Roll-forward from OIG Reports:
     for each system on an annual basis. The contingency plans should be
                                                                               4A-CI-00-08-022 Recommendation 2,
     immediately tested for the eight systems that were not subject to
     adequate testing in FY 2014.                                              4A-CI-00-09-031 Recommendation 9,
                                                                                                                         OPEN: Rolled-forward as Report
                                                                               4A-CI-00-10-019 Recommendation 30,
25                                                                                                                       4A-CI-00-15-011 Recommendation 25
                                                                               4A-CI-00-11-009 Recommendation 19,
                                                                               4A-CI-00-12-016 Recommendation 15, and
                                                                               4A-CI-00-13-021 Recommendation 14
     We recommend that the OCIO implement and document a centralized          Roll-forward from OIG Reports:
     (agency-wide) approach to contingency plan testing.
                                                                               4A-CI-00-11-009 Recommendation 21,
26                                                                                                                       CLOSED: 9/30/2015
                                                                               4A-CI-00-12-016 Recommendation 16, and
                                                                               4A-CI-00-13-021 Recommendation 15
     We recommend that the OCIO identify agency systems that reside in a
27   public cloud and document those systems on the master system             Recommendation new in 2014                 CLOSED: 11/12/2014
     inventory.
     We recommend that the OCIO ensure that all ISAs are valid and                                                       OPEN: Rolled-forward as Report
28   properly maintained.                                                     Recommendation new in 2014
                                                                                                                         4A-CI-00-15-011 Recommendation 26
     We recommend that the OCIO ensure that a valid MOU/A exists for                                                     OPEN: Rolled-forward as Report
29   every interconnection.                                                   Recommendation new in 2014
                                                                                                                         4A-CI-00-15-011 Recommendation 27
                                             Appendix II

                         UNITED STATES OFFICE OF PERSONNEL MANAGEMENT
                                                 Washington DC 20415



Chief Information
     Officer

                                                   October 22, 2015

      MEMORANDUM FOR:
                                 Chief, Information Systems Audit Group
                                 Office of the Inspector General

      FROM:                      DONNA K. SEYMOUR
                                 Chief Information Officer

      SUBJECT:                   Office of the Chief Information Officer Response to the Office of the
                                 Inspector General Federal Information Security Modernization Act
                                 Audit – FY 2015 (Report No. 4A-CI-00-15-011)


      Thank you for the opportunity to provide comments to the Office of the Inspector General (OIG)
      draft report for the Fiscal Year (FY) 2015 Federal Information Security Modernization Act
      (FISMA) Audit for the U.S. Office of Personnel Management (OPM). The OIG comments are
      valuable to the office of the Chief Information Officer (OCIO) as they afford us an independent
      assessment of our operations and help guide our improvements to enhance the security of the
      data furnished to OPM by the Federal workforce, the Federal agencies, our private industry
      partners, and the public.

      We welcome a collaborative dialogue to help ensure we fully understand the OIG’s
      recommendations as we plan our remediation efforts so that our actions and the closure of the
      recommendations thoroughly address the underlying issues. I look forward to continued
      discussions during our monthly reviews to help ensure we remain aligned.

      As a practice we have established in our monthly meetings, OCIO intends to track these
      recommendations in our dashboards to facility the aggressive pursuit of remediations, and we
      will provide updates at each meeting. I am proud that OCIO has closed 77% of the
      recommendations for the FY 2007 through FY 2014 OIG FISMA Audits, as well as OIG system
      audits. We believe this progress during the past year demonstrates that OPM takes the
      recommendations seriously and is focused on protecting its data and information technology (IT)
      systems.

      Each of the recommendations provided in the draft report is discussed below:

      Recommendation 1 (Rolled Forward from 2014)
      We recommend that the OCIO develop and maintain a comprehensive inventory of all servers,
      databases, and network devices that reside on the OPM network.
CIO Response: OCIO concurs with the recommendation. Asset inventory tools were installed
on the network in FY 2015 and are being further configured to address gaps in network
coverage. Additionally, network access control appliances have been installed to prevent
unauthorized equipment from logging onto or being installed on the network. These tools will be
aggressively implemented to provide additional assurance that a comprehensive inventory of
assets is maintained.

Recommendation 2 (Rolled Forward from 2013)
We continue to recommend that the OCIO develop a plan and timeline to enforce the new SDLC
policy to all of OPM’s system development projects.

CIO Response: OCIO concurs with the recommendation. An enhanced policy is being
developed to update the Systems Development Life Cycle (SDLC) requirements. A plan and
timeline for implementation of the policy for all Development, Modernization and Enhancement
(DM&E) projects is also being developed.

Recommendation 3 (Rolled Forward from 2014)
We recommend that all active systems in OPM’s inventory have a complete and current
Authorization.

CIO Response: OCIO concurs with the recommendation. OCIO made a risk-based cost-
effective decision in FY 2014 to extend the authorizations for all systems in the current
enterprise network. Upon migration to the new environment, all systems will undergo a full
security assessment and authorization as this constitutes a major change. As part of our analysis
and planning for migration to the new infrastructure, OCIO will conduct a full assessment of the
existing authorization package for systems that may remain in the legacy environment for a
prolonged period of time.

Recommendation 4 (Rolled Forward from 2014)
We recommend that the performance standards of all OPM system owners be modified to
include a requirement related to FISMA compliance for the information systems they own. At a
minimum, system owners should be required to ensure that their systems have valid
Authorizations.

CIO Response: OCIO concurs with the recommendation. OCIO established and implemented
these performance standards for the OCIO IT Project Managers (IT PM) in FY 2015. In FY
2016, OCIO will improve these standards and create a new policy to require these standards for
IT PMs not positioned within OCIO.

Recommendation 5 (Rolled Forward from 2014)
We recommend that the OPM Director consider shutting down information systems that do not
have a current and valid Authorization.

CIO Response: OCIO partially concurs with the recommendation. OCIO will establish a policy
and process for managing authorizations to include documenting a risk-based decision by the
authorizing officials to continue operations when authorizations expire.
Recommendation 6
We recommend that the new ISCM policies and procedures being developed utilize and
incorporate the controls identified in the CIGIE Information Security Continuous Monitoring
Maturity Model. At a minimum the policies and procedures should:

      Document key stakeholders and their responsibilities;
      Implement continuous monitoring submissions standardization;
      Develop requirements for personnel with significant ISCM responsibilities to have the
       necessary skill, knowledge, and training to complement their role;
      Develop qualitative and quantitative measures for assessing the effectiveness of the
       ISCM program;
      Define how ISCM information is routinely shared with top management and personnel
       with significant ISCM responsibilities, and
      Define the technology needed to support the ISCM program.

CIO Response: OCIO partially concurs with the recommendation. We agree that policies and
procedures should be developed to address the items listed in the recommendation, and will meet
OPM’s ISCM responsibilities in accordance with Federal laws, regulations, directives, and
policies. While OPM does not have a requirement to follow the CIGIE ISCM Maturity Model,
we will consider using the CIGIE ISCM Maturity Model where desirable and practicable.

Recommendation 7 (Rolled forward from 2008)
We recommend that OPM ensure that an annual test of security controls has been completed for
all systems.

CIO Response: OCIO concurs with the recommendation and will ensure all systems have
security controls testing performed at least annually and in accordance with OPM ISCM policy.

Recommendation 8 (Rolled Forward from 2014)
We recommend that the OCIO develop and implement a baseline configuration for all operating
platforms in use by OPM including, but not limited to,   ,         ,        , and
 .

CIO Response: OCIO partially concurs with the recommendation. While we agree that a
baseline configuration should be developed for all operating platforms on the network, all of the
operating platforms identified specifically in the recommendation do not exist as operating
platforms on the network. OCIO will use the comprehensive asset inventory developed in
conjunction with recommendation 1 to baseline configurations for the applicable operating
platforms. Further, implementation of network access control appliances will prevent
unauthorized devices with unauthorized operating systems from connecting to the OPM network.

Recommendation 9 (Rolled Forward from 2014)
We recommend the OCIO conduct routine compliance scans against established baseline
configurations for all servers and databases in use by OPM. This recommendation cannot be
addressed until Recommendation 8 has been completed.
CIO Response: OCIO concurs with the recommendation. OCIO currently conducts routine
compliance scans for existing baseline configurations and will extend scans to cover new
baselines identified by remediating recommendation 8 once new operating systems and
databases are identified and baselines are established.

Recommendation 10 (Rolled Forward from 2014)
We recommend that the OCIO implement a process to ensure routine vulnerability scanning is
conducted on all network devices documented within the inventory.

CIO Response: OCIO concurs with the recommendation. OCIO will use the inventory created
by remediating recommendation 1 to help ensure that vulnerability scanning is performed on all
network devices and errors are corrected in a timely manner.

Recommendation 11 (Rolled Forward from 2014)
We recommend that the OCIO implement a process to centrally track the current status of
security weaknesses identified during vulnerability scans to remediation or risk acceptance.

CIO Response: OCIO concurs with the recommendation. OCIO is working with the
Department of Homeland Security (DHS), as part of the Continuous Diagnostics and Mitigation
(CDM) Program, to implement and integrate the tools necessary to meet this recommendation.

Recommendation 12 (Rolled Forward from 2011)
We recommend that the OCIO document “accepted” weaknesses identified in vulnerability
scans.

CIO Response: OCIO concurs with the recommendation. OCIO will follow its standard process
for documenting acceptances of risk or weaknesses identified in vulnerability scans.

Recommendation 13
We recommend the OCIO implement a process to ensure that only supported software and
operating platforms are utilized within the network environment.

CIO Response: OCIO concurs with the recommendation. In FY 2016, OCIO will implement a
software configuration management tool in support of Enterprise Architecture that prevents
unapproved software and operating platforms from being implemented within the network
environment. OCIO currently has several controls that assist in preventing unapproved software
from being implemented in the network, such as requiring administrator privileges to download
software.

Recommendation 14 (Roll Forward from 2014)
We recommend the OCIO implement a process to apply operating system and third party vendor
patches in a timely manner, which is defined within the OPM Information Security and Privacy
Policy Handbook.

CIO Response: OCIO concurs with the recommendation. Significant progress was made in FY
2015 to apply available patches, and OCIO recognizes additional work is necessary to build a
sustainable and measurable process. OCIO will continue to refine its processes for patch
management.

Recommendation 15
We recommend that the OCIO require PIV authentication to access the OPM network.

CIO Response: This recommendation has been remediated and verified by the OIG.

Recommendation 16 (Rolled Forward from 2012)
We recommend that the OCIO meet the requirements of OMB M-11-11 by upgrading its major
information systems to require multi-factor authentication using PIV credentials.

CIO Response: OCIO concurs with the recommendation. OCIO will follow its planned
schedule for enforcing multi-factor authentication, including the use of PIV credentials wherever
feasible.

Recommendation 17 (Rolled Forward from FY 2014)
We recommend that OCIO configure its security information and event management tool to
collect and report meaningful data, while reducing the volume of non-sensitive log and event
data.

CIO Response: OCIO concurs with the recommendation. We will configure the filtering
capability of the security information and event management tool to meet OPM requirements,
reducing unnecessary event logs and event data where possible.

Recommendation 18 (Rolled Forward from 2011)
We recommend that the OCIO continue to develop its Risk Executive Function to meet all of the
intended requirements outlined in NIST SP 800-39, section 2.3.2 Risk Executive (Function).

CIO Response: OCIO partially concurs with this finding. While we believe the Risk Executive
Function is important for OPM-wide risk management, OCIO can only manage risk associated
with its portfolio. To that end, OCIO will use its IT governance processes and other governance
processes, such as the annual Federal Financial Managers’ Integrity Act (FMFIA) internal
control processes, to manage risks within the OCIO portfolio.

Recommendation 19
We recommend that the OCIO ensure that all employees with significant information security
responsibility take meaningful and appropriate specialized security training on an annual basis.

CIO Response: OCIO concurs with this recommendation. OCIO will establish training plans for
personnel with significant information security responsibility and track progress toward
completion of approved classes.

Recommendation 20 (Rolled Forward from 2014)
We recommend that the OCIO and program offices that own information systems ensure that all
known security weaknesses are incorporated into the appropriate POA&M.
CIO Response: OCIO concurs with the recommendation. While the vast majority of
weaknesses were incorporated into the appropriate POA&M, we acknowledge that a few
weaknesses were not added timely. We will update our POA&M process accordingly to assure
that weaknesses are added timely in the future.

Recommendation 21
We recommend that the OCIO and system owners develop formal corrective action plans to
remediate all POA&M weaknesses that are over 120 days overdue.

CIO Response: OCIO concurs with the recommendation. OCIO will create a corrective action
plan for weaknesses that are more than 120 days overdue.

Recommendation 22
We recommend that all POA&Ms list the specific resources required to address each security
weakness identified.

CIO Response: OCIO concurs with the recommendation. OCIO will include in its POA&Ms
resources required to remediate security weaknesses.

Recommendation 23 (Rolled Forward from 2012)
We recommend the OCIO configure the VPN servers to terminate VPN sessions after 30 minutes
of inactivity.

CIO Response: OCIO concurs with the recommendation. We have thoroughly analyzed and
investigated this matter. Virtual Private Network (VPN) appliances are configured and have
been validated to terminate connections to the network after 30 minutes of inactivity. Some
applications, agents, and software purposefully run in the background because they take a
prolonged period of time to complete or because they periodically refresh data to the device.
This is valid and authorized activity. Thus, OCIO believes the VPN appliance is working in
accordance with the intended configuration setting.

Recommendation 24 (Rolled Forward from FY2014)
We recommend that the OCIO ensure that all of OPM’s major systems have Contingency Plans
in place and that they are reviewed and updated annually.

CIO Response: OCIO concurs with the recommendation. OCIO will ensure contingency plans
are reviewed and updated annually.

Recommendation 25 (Rolled Forward from 2008)
We recommend that OPM’s program offices test the contingency plans for each system on an
annual basis. The contingency plans should be immediately tested for the 29 systems that were
not subject to adequate testing in FY 2015.

CIO Response: OCIO concurs with the recommendation. OCIO will test contingency plans
annually.
Recommendation 26
We recommend the OCIO ensure that a valid ISA and MOU/A exists for every interconnection.

CIO Response: OCIO concurs with the recommendation. OCIO will update its processes for 

identifying, controlling, and maintaining interconnections and their associated documentation.


Again, thank you for the opportunity to provide comment. Please contact me or               

           if you have questions or need additional information. 





Copy to: 

Janet Barnes, Director, Internal Oversight and Control 

                             Appendix III
                            For Official Use Only




Inspector General                                     2015
                                                     Annual FISMA
Section Report                                          Report




                 Office of Personnel Management




                             For Official Use Only
                                                                            For Official Use Only

 ection 1: Continuous Monitoring Management
1.1 	   Utilizing the ISCM maturity model definitions, please assess the maturity of the organization's ISCM program along the domains of people,
        processes, and technology. Provide a maturity level for each ofthese domains as well as for the ISCM program overall.
         1.1.1 	   Please provide the D/A ISCM maturity level for the People domain. 

                   Ad Hoc (Level 1) 

         1.1.2 	   Please provide the D/A ISCM maturity level for the Processes domain. 

                   Ad Hoc (Level 1) 

         1.1.3 	   Please provide the D/A ISCM maturity level for the Technology domain 

                   Ad Hoc (Level 1) 

         1.1.4 	   Please provide the D/A ISCM maturity level for the ISCM Program Overall. 

                   Ad Hoc (Level 1) 

1.2 	   Please provide any additional information on the effectiveness of the organization's Information Security Continuous Monitoring Management
        Program that was not noted in the maturity model above.
         Comments
                   Comments:      OPMs ISCM policies and procedures are currently being restructured to better suit the current OPM environment. These
                                  newpolicies and procedures will also help create a more transparent ISCM program, as the previous iteration ofiSCM policies did
                                  notprove to be very effective. The policies are currently in draft form and the OCIO did not provide an estimated completion date. We
                                  were also informed that the software platform currently used for continuous monitoring submissions and reporting has not beenmeeting
                                  the needs ofthe ISCM program. The OCIO currently has a project underway to acquire a new software package that willbetter
                                  integrate with OPM's environment and the requirements of the ISCM program. Defining the technology needed to support
                                  acontinuous monitoring program is a critical element of CIGIE 's ISCM Maturity Model.

~ection 2: Configuration Management
2.1     Has the organization established a security configuration management program that is consistent with FISMA requirements, OMB policy, and
        applicable NIST guidelines? Besides the improvement opportunities that may have been identified by the OIG, does the program include the
        following attributes?
         No




OIG Report- Annual2015                                                                                                                                           Page 1 of 16
                                                                            For Official Use Only
                                                                           For Official Use Only

~ection 2: Configuration Management
         2.1.1   Documented policies and procedures for configuration management.
                 Yes
         2.1.2   Defined standard baseline configurations.
                 No
                          Comments:       OPM does not have formal baseline configurations for all ofthe operating platforms and databases used in its environment.
         2.1.3   Assessments of compliance with baseline configurations.
                 No
                          Comments:       The OCIO uses automated scanning tools to conduct routine compliance audits on many of the operating platforms used in
                                          OPM's server environment. However, as mentioned above, there are operating platforms used by OPM that do not have
                                          documented baseline configurations, and therefore it is impossible to subject these systems to adequate compliance audits.
         2.1.4   Process for timely (as specified in organization policy or standards) remediation of scan result findings.
                 No
                          Comments:       OPM has not implemented a process to centrally track the current status of security weaknesses identified during
                                          vulnerability scans to remediation or risk acceptance, and we have concerns that OPM is not remediating known
                                          vulnerabilities in a timely manner.
         2.1.5   For Windows-based components, USGCB secure configuration settings are fully implemented (when available), and any deviations
                 from USGCB baseline settings are fully documented.
                 Yes
         2.1.6   Documented proposed or actual changes to hardware and software baseline configurations.
                 Yes




OIG Report- Annual2015                                                                                                                                          Page 2 of 16
                                                                           For Official Use Only


                                                                                                                                                                                
                                                                              For Official Use Only

~ection 2: Configuration Management
          2.1.7 	   Implemented software assessing (scanning) capabilities (NIST SP 800-53 : RA-5, SI- 2).
                    Yes 

                             Comments: 
     OPM performs some form ofautomated network vulnerability scanning on a bi-weekly basis. However, OPM's lack ofa
                                             complete system inventory makes it impossible to attest that controls ofthis nature are adequate and comprehensive. In
                                             addition to our concerns that OPM is not conducting vulnerability scans on its entire environment, we also identified issues
                                             with the scans that do take place. OPM runs vulnerability scans using the credentials ofa "service level" account.
                                             However, the scanning tool used by OPM actually requires "administrator" credentials to be fully effective. We reviewed
                                             reports that indicate numerous OPM systems are being routinely scanned with credentials that do not have sufficient access
                                             rights for a comprehensive vulnerability check.

          2.1.8 	   Configuration-related vulnerabilities, including scan findings, have been remediated in a timely manner, as specified in organization
                    policy or standards. (NIST SP 800-53: CM-4, CM-6, RA-5, SI-2).
                    No 

                             Comments: 
     OPM has not implemented a process to centrally track the current status of security weaknesses identified during
                                             vulnerability scans to remediation or risk acceptance, and we have concerns that OPM is not remediating known
                                             vulnerabilities in a timely manner.

          2.1.9 	   Patch management process is fully d eveloped, as specified in organization policy or standards, including timely and secure installation
                    of software patches (NIST SP 800-53: CM-3, SI-2).
                    No 

                             Comments: 
     The OCIO has implemented a process to apply operating system patches on all devices within OPM's network on a
                                             weeklybasis. The OCIO also utilizes a third party patching software management program to manage and maintain
                                             allnon-operating system software. However, our scans determined that although the problems are less severe than in
                                             prioryears, numerous servers are not patched in a timely fashion. Once again, OPM's lack of comprehensive inventory
                                             makes it impossible for us or the OCIO to determine how many servers are not receiving timely patches.

2.2      Please provide any additional information on the effectiveness of the organization' s Configuration Management Program that was not noted in
         the questions above. 

          N/A 





OIG Report- Annual201 5 	                                                                                                                                             Page J of 16
                                                                              For Official Us e Only
                                                                            For Official Use Only

~ection 2: Configuration Management
2.3      Does the organization have an enterprise deviation handling process and is it integrated with an automated scanning capability?
          Yes
          2.3.1 	   Is there a process for mitigating the risk introduced by those deviations? A deviation is an authorized departure from an approved
                    configuration. As such it is not remediated but may require compensating controls to be implemented.
                    Yes

~ection 3: Identity and Access Management
3.1      Has the organization established an identity and access management program that is consistent with FISMA requirements, OMB policy, and
         applicable NIST guidelines and which identifies users and network devices? Besides the improvement opportunities that have been identified
         by the OIG, does the program include the following attributes?
          Yes
          3.1.1     Documented policies and procedures for account and identity management (NIST SP 800-53: AC-1). 

                    Yes 

          3.1.2     Identifies all users, including Federal employees, contractors, and others who access organization systems (HSPD 12, NIST SP
                    800-53, AC-2).
                    Yes
          3.1.3 	   Organization has planned for implementation ofPIV for logical access in accordance with government policies (HSPD 12, FIPS 201,
                    OMB M-05-24, OMB M-07-06, OMB M-08-01, OMB M -11-11).
                    Yes
          3.1.4 	   Organization has planned for implementation ofPIV for physical access in accordance with government policies (HSPD 12, FIPS 201,
                    OMB M-05-24, OMB M -07-06, OMB M -08-01, OMB M -11-11).
                    Yes
                             Comments:      Approximately 97 percent oflaptops procured and configured by OPM require PIV authentication to log into that
                                            device.However, throughout FY 2015 there were no controls enforced that require two-factor authentication to connect
                                            otherdevices to the network. In addition, none of OPM's 46 major applications enforced PIV authentication. OPM has a
                                            plan in place to implement PIV authentication for all systems, but it will be a multi-year project.




OIG Report- Annual201 5 	                                                                                                                                      Page 4 of 16
                                                                            Fo r Official Use Only
                                                                          For Official Use Only

~ection 3: Identity and Access Management
         3.1.5   Ensures that the users are granted access based on needs and separation-of-duties principles.
                 Yes
         3.1.6   Distinguishes hardware assets that have user accounts (e.g., desktops, laptops, servers) from those without user accounts (e.g. IP
                 phones, faxes, printers).
                 Yes
         3.1.7   Ensures that accounts are terminated or deactivated once access is no longer required according to organizational policy.
                 Yes
         3.1.8   Identifies and controls use of shared accounts.
                 Yes
3.2     Please provide any additional information on the effectiveness of the organization's Identity and Access Management Program that was not
        noted in the questions above.
         N/A

~ection 4: Incident Response and Reporting
4.1     Has the organization established an incident response and reporting program that is consistent with FISMA requirements, OMB policy, and
        applicable NIST guidelines? Besides the improvement opportunities that may have been identified by the OIG, does the program include the
        following attributes?
         Yes
         4.1.1   Documented policies and procedures for detecting, responding to, and reporting incidents (NIST SP 800-53: IR-1).
                 Yes
         4.1.2   Comprehensive analysis, validation, and documentation of incidents.
                 Yes
         4.1.3   When applicable, reports to US-CERTwithin established timeframes (NIST SP 800-53, 800-61; OMB M-07-16, M -06-19).
                 Yes
         4.1.4   When applicable, reports to law enforcement and the agency Inspector General within established timeframes.
                 Yes



OIG Report- Annual2015                                                                                                                                Page 5 of 16
                                                                          For Off icial Use Only


                                                                                                                                                                      
                                                                             For Official Use Only

~ection 4: Incident Response and Reporting
         4.1.5     Responds to and resolves incidents in a timely manner, as specified in organization policy or standards, to minimize further damage
                   (NISI SP 800-53, 800-61; OMB M-07-16, M-06-19).
                   Yes
         4.1.6     Is capable of correlating incidents. 

                   Yes 

         4.1.7 	 Has sufficient incident monitoring and detection coverage in accordance with government policies (NISI SP 800-53, 800-61; OMB
                   M-07-16, M-06-19). 

                   Yes 

4.2      Please provide any additional information on the effectiveness of the organization's Incident Management Program that was not noted in the
         questions above.
         N/A

~ection 5: Risk Management
5.1      Has the organization established a risk management program that is consistent with FISMA requirements, OM B policy, and applicable NISI
         guidelines? Besides the improvement opportunities that may have been identified by the OIG, does the program include the following
         attributes? 

         No 

                   Comments:       In FY 2011 the OCIO organized a group comprised of several IT security professionals to fulfill the Risk ExecutiveFunction.
                                   However, as ofthe end ofFY 2015, the group still does not have an approved charter, and therefore does nothave clearly defined
                                   responsibility and authority for risk management activity at OPM. In addition, the 12 primary elementsofthe Risk Executive Function
                                   as described in NISI SP 800-39 are not all fully implemented. Key elements still missing from OPM's approach to managing risk at
                                   an agency-wide level include: conducting a risk assessment, maintaining a risk registry, communicating the agency-wide risks down to
                                   the system owners, and ensuring proper authorization of agency information systems.

         5.1.1 	   Addresses risk from an organization perspective with the development of a comprehensive governance structure and 

                   organization-wide risk management strategy as described in NISI SP 800-37, Rev. 1. 

                   No 

                             Comments:       OPM has not taken steps to address risk management from an organization perspective, and has not conducted an
                                             agency-wide risk assessment.


OIG Report- Annual2015 	                                                                                                                                         Page 6 of 16
                                                                             For Official Use Only
                                                                              For Official Use Only

~ection 5: Risk Management
         5.1.2     Addresses risk from a mission and business process perspective and is guided by the risk decisions from an organizational
                   perspective, as described in NIST SP 800- 37, Rev. 1.
                   No
                            Comments:       OPM has not implemented a process to address risk from an organization perspective ( 5.1 .1), therefore organization risk
                                            cannot guide mission and business process risk management.

         5.1.3 	   Addresses risk from an information system perspective and is guided by the risk decisions from an organizational perspective and the
                   mission and business perspective, as described in NIST SP800-37, Rev.l.
                   No 

                            Comments: 
     OPM has not implemented a process to address risk from an organization perspective ( 5.1.1 ), therefore organization risk
                                            cannot guide information system risk management.
         5.1.4 	 Has an up-to-date system inventory.
                   No 

                            Comments: 
     OPMhas not developed a comprehensive server, database and applications inventory. Without a reliable inventory,
                                            OPMsconfiguration management controls are not effective, as there is no assurance that they are being enforced in the
                                            entiretechnical environment. OPM has historically maintained a fragmented and decentralized technical infrastructure that is
                                            spreadover six data centers and is maintained by different organizations within the agency . Over the past several years, the
                                            agencyhas procured a variety oftools to help automate efforts to secure the OPMnetwork. However, our audit determined
                                            that all of these tools are not being utilized to their fullest capacity, as the agency was having difficulty implementing and
                                            enforcing the new controls on all endpoints ofthe decentralized network.
         5.1.5     Categorizes information systems in accordance with government policies.
                   Yes
         5.1.6 	   Selects an appropriately tailored set of baseline security controls a nd describes how the controls are employed within the information
                   system and its environment of operation. 

                   Yes 

         5.1.7 	   Implements the approved set oftailored baseline security controls specified in metric 5.1.6.
                   Yes




OIG Report- Annual2015 	                                                                                                                                             Page 7 of 16
                                                                              For Official Use Only
                                                                              For Official Use Only

~ection 5: Risk Management
         5.1.8 	   Assesses the security controls using appropriate assessment procedures to determine the extent to which the controls are
                   implemented correctly, operating as intended, and producing the desired outcome with respect to meeting the security requirements
                   for the system.
                   No
                            Comments:       OPM's existing policy requires all OPM operated system owners to submit evidence of continuous monitoring activities
                                            atleast quarterly. Security control testing is currently required only once a year for OPM systems operated by a
                                            contractor.We determined that only 20 out of29 systems operated by OPMwere subject to adequate security control
                                            continuous monitoring activity in FY 2015, and only 10 of the 17 systems operated by a contractor were subject to an
                                            adequate annual security control testing exercise.
         5.1.9 	   Authorizes information system operation based on a determination ofthe risk to organizational operations and assets, individuals,
                   other organizations, and the Nation resulting from the operation of the information system and the decision that this risk is acceptable.
                   No 

                            Comments: 
     Due to the volume and sensitivity of the OPM systems that were operating without an active Authorization, we classified
                                            thisissue as a material weakness in the FY 2014 FISMA report. Unfortunately, our FY 2015 FISMA audit work indicates
                                            thatOPM's management ofsystem Authorizations has deteriorated even further. In April 2015, the CIO issued a
                                            memorandumthat granted an extension ofthe previous Authorizations for all systems whose Authorization had already
                                            expired, and forthose scheduled to expire through September 2016. Should this moratorium on Authorizations continue, the
                                            agency willhave up to 23 systems that have not been subject to a thorough security controls assessment. It is irresponsible to
                                            allowthese systems to operate without routinely subjecting them to a thorough security controls assessment. We continue to
                                            believe that OPM's management ofsystem Authorizations represents a material weakness in the internal control structure of
                                            the agency's IT security program.

         5.1.10 	 Information-system-specific risks (tactical), mission/business-specific risks, and organizational-level (strategic) risks are 

                   communicated to appropriate levels ofthe organization. 

                   No 

                            Comments:       OPM has not implemented a process to address risk from an organization perspective (5.1.1), therefore it is not possible to
                                            measure whether risks are communicated to the appropriate levels of the organization.
         5.1.11 	 Senior officials are briefed on threat activity on a regular basis by appropriate personnel (e.g., CISO). 

                   Yes 



OIG Report - Annual2015                                                                                                                                              Page 8 of 16
                                                                              For Official Use Only
                                                                           For Official Use Only

~ection 5: Risk Management
          5.1.12 	 Prescribes the active involvement of information system owners and common control providers, chief information officers, senior
                   information security officers, authorizing officials, and other roles as applicable in the ongoing management of information-system­
                   related security risks.
                   Yes
          5.1.13 	 Security authorization package contains system security plan, security assessment report, POA&M, accreditation boundaries in
                   accordance with government policies for organization information systems (NIST SP 800-18, 800-37).
                   No 

                             Comments: 
   The Authorization packages that do exist are of acceptable quality, but many OPM systems do not currently have an active
                                           Authorization (see 5.1.9).
          5.1.14 	 The organization has an accurate and complete inventory of their cloud systems, including identification ofFedRAMP approval status.
                   Yes
          5.1.15 	 For cloud systems, the organization can identify the security controls, procedures, policies, contracts, and service level agreements
                   (SLA) in place to track the performance ofthe Cloud Service Provider (CSP) and manage the risks of Federal program and personal
                   data stored on cloud systems.
                   No
                             Comments:     OPM cannot effectively track the performance ofCloud Service Providers because many ofthe existing contracts do not
                                           contain appropriate language.
5.2       Please provide any additional information on the effectiveness of the organization 's Risk M anagement Program that was not noted in the
          questions above. 

          N/A 


~ection 6: Security Training
6.1       Has the organization established a security training program that is consistent with FISMA requirements, OMB policy, and applicable NIST
          guidelines? Besides the improvement opportunities that may have been identified by the OIG, does the program include the following
          attributes?
          Yes




OIG Report - Annual 2015 	                                                                                                                                     Page 9 of 16
                                                                           For Official Use Only
                                                                           For Official Use Only

~ection 6: Security Training
         6.1.1   Documented policies and procedures for security awareness training (NIST SP 800-53: AT-1).
                 Yes
         6.1.2   Documented policies and procedures for specialized training for users with significant information security responsibilities.
                 Yes
         6.1.3   Security training content based on the organization and roles, as specified in organization policy or standards.
                 Yes
         6.1.4   Identification and tracking ofthe status of security awareness training for all personnel (including employees, contractors, and other
                 organization users) with access privileges that require security awareness training.
                 Yes
         6.1.5   Identification and tracking of the status of specialized training for all personnel (including employees, contractors, and other
                 organization users) with significant information security responsibilities that require specialized training.
                 No
                          Comments:       OPM employees with significant information security responsibilities are required to take specialized security training
                                          inaddition to the annual awareness training. The OCIO has developed a table outlining the security training requirements
                                          forspecific job roles. The OCIO uses a spreadsheet to track the security training taken by employees that have been
                                          identifiedas having security responsibility. Only 65 percent of employees identified as having significant security
                                          responsibilities have completed special IT training in FY 2015.
         6.1.6   Training material for security awareness training contains appropriate content for the organization (NIST SP 800-50, 800-53).
                 Yes
6.2     Please provide any additional information on the effectiveness of the organization's Security Training Program that was not noted in the
        questions above.
         N/A

~ection 7: Plan Of Action & Milestones (POA&M)




OIG Report- Annual2015                                                                                                                                         Page 10 of 16
                                                                           For Official Use Only


                                                                                                                                                                                
                                                                         For Official Use Only

~ection 7: Plan Of Action & Milestones (POA&M)
7.1     Has the organization established a POA&M program that is consistent with FISMA requirements, OMB policy, and applicable NIST
        guidelines and tracks and monitors known information security weaknesses? Besides the improvement opportunities that may have been
        identified by the OIG, does the program include the following attributes?
         Yes
         7.1.1   Documented policies and procedures for managing IT security weaknesses discovered during security control assessments and that
                 require remediation.
                 Yes
         7.1.2   Tracks, prioritizes, and remediates weaknesses.
                 Yes
         7.1.3   Ensures remediation plans are effective for correcting weaknesses.
                 Yes
         7.1.4   Establishes and adheres to milestone remediation dates and provides adequate justification for missed remediation dates.
                 No
                          Comments:      :Many system owners are not meeting the self-imposed remediation deadlines listed on the POA&Ms. Only 5 of OPM's 46
                                         systems do not have POA&M items that are greater than 120 days overdue.
         7.1.5   Ensures resources and ownership are provided for correcting weaknesses.
                 No
                          Comments:      Only 40 of OPM's 46 systems appropriately identifY the resources needed to address POA&M weaknesses, as required by
                                         OPM's POA&M policy.

         7.1.6   POA&Ms include security weaknesses discovered during assessments of security controls and that require remediation (do not need
                 to include security weakness due to a risk- based decision to not implement a security control) (OMB M-04-25).
                 No
                          Comments:      In November 2014, the OIG issued the FY 2014 FISMA audit report with 29 audit recommendations. However, only 13of
                                         the 29 recommendations were appropriately incorporated into the OCIO master POA&M. We have not seen how or if the
                                         remaining 16 recommendations were documented.




OIG Report- Annual2015                                                                                                                                  Pagell of16
                                                                         For Official Use Only


                                                                                                                                                                       
                                                                           For Official Use Only

~ection 7: Plan Of Action & Milestones (POA&M)
         7.1.7   Costs associated with remediating weaknesses are identified in terms of dollars (NIST SP 800-53: PM-3; OMB M-04-25).
                 Yes
         7.1.8   Program officials report progress on remediation to CIO on a regular basis, at least quarterly, and the CIO centrally tracks,
                 maintains, and independently reviews/validates the POA&M activities at least quarterly (NIST SP 800-53:CA-5; OMB M -04-25).
                 Yes
7.2     Please provide any additional information on the effectiveness ofthe organization's POA&M Program that was not noted in the questions
        above.
         N/A

~ection 8: Remote Access Management
8.1     Has the organization established a remote access program that is consistent with FISMA requirements, OMB policy, and applicable NIST
        guidelines? Besides the improvement opportunities that may have been identified by the OIG, does the program include the following
        attributes?
         Yes
         8.1.1   Documented policies and procedures for authorizing, monitoring, and controlling all methods of remote access (NIST SP800-53: AC-1,
                 AC-17).
                 Yes
         8.1.2   Protects against unauthorized connections or subversion of authorized connections.
                 Yes
         8.1.3   Users are uniquely identified and authenticated for all access (NIST SP 800-46, Section 4.2, Section 5.1).
                 Yes
         8.1.4   Telecommuting policy is fully developed (NIST SP 800-46, Section 5.1).
                 Yes
         8.1.5   Authentication mechanisms meet NIST SP 800-63 guidance on remote electronic authentication, including strength mechanisms.
                 Yes




OIG Report- Annual2015                                                                                                                                Page 12 of 16
                                                                           For Off icial Use Only


                                                                                                                                                                       
                                                                           For Official Use Only

~ection 8: Remote Access Management
         8.1.6    Defines and implements encryption requirements for information transmitted across public networks.
                  Yes
         8.1.7    Remote access sessions, in accordance with OMB M-07-16, are timed-out after 30 minutes of inactivity, after which re-authentication
                  is required.
                  No
                           Comments:      Remote access sessions do not tenninate after 30 minutes of inactivity.
         8.1.8    Lost or stolen devices are disabled and appropriately reported (NIST SP 800-46, Section 4.3; US-CERT Incident Reporting
                  Guidelines).
                  Yes
         8.1.9    Remote access rules of behavior are adequate in accordance with government policies (NIST SP 800-53, PL-4).
                  Yes
         8.1.10   Remote-access user agreements are adequate in accordance with government policies (NIST SP 800-46, Section 5.1; NIST SP 800-53,
                  PS-6).
                  Yes
8.2     Please provide any additional information on the effectiveness of the organization's Remote Access Management that was not noted in the
        questions above.
         N/A
8.3     Does the organization have a policy to detect and remove unauthorized (rogue) connections?
         Yes
                  Comments:      This control was implemented in early FY 2016.

~ection 9: Contingency Planning
9.1     Has the organization established an enterprise-wide business continuity/disaster recovery program that is consistent with FISMA
        requirements, OMB policy, and applicable NIST guidelines? Besides the improvement opportunities that may have been identified by the
        OIG, does the program include the following attributes?
         Yes



OIG Report- Annual2015                                                                                                                                  Page 13 of 16
                                                                           For Official Use Only


                                                                                                                                                                         
                                                                            For Official Use Only

~ection 9: Contingency Planning
         9.1.1    Documented business continuity and disaster recovery policy providing the authority and guidance necessary to reduce the impact of a
                  disruptive event or disaster (NIST SP 800-53: CP-1).
                  Yes
         9.1.2    The organization has incorporated the results of its system's Business Impact Analysis and Business Process Analysis into the
                  appropriate analysis and strategy development efforts for the organization's Continuity of Operations Plan, Business Continuity Plan,
                  and Disaster Recovery Plan (NIST SP 800-34).
                  Yes
         9.1.3    Development and documentation of division, component, and IT infrastructure r ecovery strategies, plans, and procedures (NIST SP
                  800-34).
                  Yes
         9.1.4    Testing of system-specific contingency plans.
                  No
                           Comments:       We received evidence that contingency plans were tested for only 18 of OPM's 46 systems in FY 201 5. This is a significant
                                           decrease from the number of systems that were tested in FY 2014.
         9.1.5    The documented BCP and DRP are in place and can be implemented when necessary (FCD1, NIST SP 800-34).
                  Yes
         9.1.6    Development oftest, training, and exercise (TT&E) programs (FCD1, NIST SP 800-34, NIST SP 800-53).
                  Yes
         9.1. 7   Testing or exercising of BCP and DRP to determine effectiveness and to maintain current plans.
                  Yes
         9.1.8    After-action report that addresses issues identified during contingency/disaster recovery exercises (FCD1, NIST SP 800-34).
                  Yes
         9.1.9    Alternate processing sites are not subject to the same risks as primary sites. Organization contingency planning program identifies
                  alternate processing sites for systems that require them (FCD 1, NIST SP 800-34, NIST SP 800-53).
                  Yes




OIG Report - Annual2015                                                                                                                                         Page 14 of16
                                                                            For Official Use Only


                                                                                                                                                                                
                                                                             For Official Use Only

~ection 9: Contingency Planning
          9.1.10 	 Backups of information that are performed in a timely manner (FCDl, NIST SP 800-34, NIST SP800-53). 

                   Yes 

          9.1.11 	 Contingency planning that considers supply chain threats. 

                   Yes 

9.2      Please provide any additional information on the effectiveness of the organization's Contingency Planning Program that was not noted in the
         questions above.
          N/A

~ection 10: Contractor Systems
10.1 	   Has the organization established a program to oversee systems operated on its behalf by contractors or other entities, including for
         organization systems and services residing in a cloud external to the organization? Besides the improvement opportunities that may have been
         identified by the OIG, does the program include the following attributes?
          Yes
          10.1.1 	 Documented policies and procedures for information security oversight of systems operated on the organization's behalf by
                   contractors or other entities (including other government agencies), including organization systems and services residing in a public,
                   hybrid, or private cloud.
                   Yes
          10.1.2 	 The organization obtains sufficient assurance that security controls of such systems and services are effectively implemented and
                   compliant with FISMA requirements, OMB policy, and applicable NIST guidelines (NIST SP 800-53: CA-2).
                   No
                             Comments:      Only 10 of the 17 systems operated by a contractor were subject to an adequate annual security control testing exercise.
          10.1.3 	 A complete inventory of systems operated on the organization's behalf by contractors or other entities, (including other government
                   agencies), including organization systems and services residing in public, hybrid, or private cloud. 

                   Yes 

          10.1.4 	 The inventory identifies interfaces between these systems and organization- operated systems (NIST SP 800-53: PM-5).
                   Yes




OIG Report- Annua l201 5 	                                                                                                                                         Page 15 of 16
                                                                             For Official Use Only
                                                                           For Official Use Only

~ection 10: Contractor Systems
         10.1.5   The organization requires appropriate agreements (e.g., MOUs, Interconnection Security Agreements, contracts, etc.) for interfaces
                  between these systems and those that it owns and operates.
                  No
                           Comments:       In the past, the OCIO maintained a separate spreadsheet documenting intetfaces between OPM and
                                           contractor-operatedsystems and the related Interconnection Security Agreements (ISA). However, we were told that the
                                           spreadsheet was not maintained in FY 2015.
         10.1.6   The inventory of contractor systems is updated at least annually.
                  Yes
10.2    Please provide any additional information on the effectiveness ofthe organization's Contractor Systems Program that was not noted in the
        questions above.
         N/A




OIG Report- Annua12015                                                                                                                                        Page 16 of 16
                                                                           For Official Use Only


                                                                                                                                                                               
                                       Report Fraud, Waste, and 

                                           Mismanagement 

                                                  Fraud, waste, and mismanagement in
                                               Government concerns everyone: Office of
                                                   the Inspector General staff, agency
                                                employees, and the general public. We
                                              actively solicit allegations of any inefficient
                                                    and wasteful practices, fraud, and
                                               mismanagement related to OPM programs
                                              and operations. You can report allegations
                                                          to us in several ways:


                     By Internet:                  http://www.opm.gov/our-inspector-general/hotline-to-
                                                   report-fraud-waste-or-abuse


                         By Phone:                 Toll Free Number:                              (877) 499-7295
                                                   Washington Metro Area:                         (202) 606-2423


                           By Mail:                Office of the Inspector General
                                                   U.S. Office of Personnel Management
                                                   1900 E Street, NW
                                                   Room 6400
                                                   Washington, DC 20415-1100




                                                             -- CAUTION --
This audit report has been distributed to Federal officials who are responsible for the administration of the audited program. This audit report may
contain proprietary data which is protected by Federal law (18 U.S.C. 1905). Therefore, while this audit report is available under the Freedom of
Information Act and made available to the public on the OIG webpage (http://www.opm.gov/our-inspector-general), caution needs to be exercised
before releasing the report to the general public as it may contain proprietary information that was redacted from the publicly distributed copy.