         U.S. OFFICE OF PERSONNEL MANAGEMENT
            OFFICE OF THE INSPECTOR GENERAL
                     OFFICE OF AUDITS




            Final Audit Report

                           Audit of the Information Technology
                                 Security Controls of the
                          U.S. Office of Personnel Management’s
                                USA Performance System

                                          Report Number 4A-HR-00-15-018
                                                   July 20, 2015


                                                             -- CAUTION --
This audit report has been distributed to Federal officials who are responsible for the administration of the audited program. This audit report may
contain proprietary data which is protected by Federal law (18 U.S.C. 1905). Therefore, while this audit report is available under the Freedom of
Information Act and made available to the public on the OIG webpage (http://www.opm.gov/our-inspector-general), caution needs to be exercised
before releasing the report to the general public as it may contain proprietary information that was redacted from the publicly distributed copy.
             EXECUTIVE SUMMARY 

            Audit of the Information Technology Security Controls of the U.S. Office of 

                        Personnel Management’s USA Performance System

Report No. 4A-HR-00-15-018                                                                                   July 20, 2015




Why Did We Conduct the Audit?                 What Did We Find?

The USA Performance (USAP) System is          Our audit of the IT security controls of the USAP system determined that:
one of the U.S. Office of Personnel           	 A Security Assessment and Authorization (SA&A) of the USAP system
Management’s (OPM) critical Information           was completed in June 2014. We reviewed the authorization package
Technology (IT) systems. As such, the             for all required elements of an SA&A, and determined that the package
Federal Information Security Management           contained all necessary documentation.
Act (FISMA) requires that the Office of the   	 The security categorization of the USAP system is consistent with
Inspector General (OIG) perform an audit          Federal Information Processing Standards 199 and NIST Special
of IT security controls of this system, as        Publication (SP) 800-60 requirements, and we agree with the
well as all of the agency’s systems, on a         categorization of “moderate.”
rotating basis.                               	 The USAP System Security Plan contains the critical elements required
                                                  by NIST SP 800-18 Revision 1.
What Did We Audit?                            	 A security control assessment plan and report were completed in March
                                                  and May 2014, respectively, for the USAP system.
The OIG has completed a performance           	 The HRS IT Program Management Office has performed regular
audit of USAP to ensure that the system           security control self-assessments in accordance with OPM’s continuous
owner, OPM’s Human Resource Solutions             monitoring methodology.
(HRS) program office, has managed the         	 A contingency plan was developed for the USAP system that is in
implementation of IT security policies and        compliance with NIST SP 800-34 Revision 1, and the plan is tested
procedures in accordance with the                 annually.
standards established by FISMA, the           	 A Privacy Threshold Analysis was conducted for the USAP system that
National Institute of Standards and               indicated that a Privacy Impact Assessment (PIA) was required. A PIA
Technology (NIST), the Federal                    has been conducted, however the PIA has not been finalized and
Information Security Controls Audit               approved.
Manual (FISCAM) and OPM’s Office of           	 The USAP system’s Plan of Acton and Milestones (POA&M) follows
the Chief Information Officer (OCIO).             the format of OPM’s standard template and has been loaded into Trusted
                                                  Agent, the OCIO’s POA&M tracking tool.
                                              	 We evaluated the degree to which a subset of the IT security controls
                                                  outlined in NIST SP 800-53 Revision 4 were implemented for the USAP
                                                  system. We determined that the security controls selected for testing
                                                  appear to be in compliance with NIST SP 800-53 Revision 4.




 _______________________
 Michael R. Esser
 Assistant Inspector General
 for Audits
                                                             i
                ABBREVIATIONS

FIPS     Federal Information Processing Standards
FISCAM   Federal Information System Controls Audit Manual
FISMA    Federal Information Security Management Act
GAO      U.S. Government Accountability Office
HRS      Human Resources Solutions
IG       Inspector General
IT       Information Technology
ITSP     Information Technology Security and Privacy Group
NIST     National Institute of Standards and Technology
OCIO     Office of the Chief Information Officer
OIG      Office of the Inspector General
OMB      U.S. Office of Management and Budget
OPM      U.S. Office of Personnel Management
PIA      Privacy Impact Analysis
PMO      Program Management Office
POA&M    Plan of Action & Milestones
PTA      Privacy Threshold Analysis
SA&A     Security Assessment & Authorization
SAP      Security Assessment Plan
SAR      Security Assessment Report
SP       Special Publication
SSP      System Security Plan
USAP     USA Performance




                              ii
IV. MAJOR CONTRIBUTORS  TO THIS REPORT
          TABLE OF CONTENTS

                                                                                                            Page 

       EXECUTIVE SUMMARY ........................................................................................ i


       ABBREVIATIONS ..................................................................................................... ii 


I.     BACKGROUND ..........................................................................................................1 


II.    OBJECTIVES, SCOPE, AND METHODOLOGY ..................................................2 


III.   AUDIT FINDINGS AND RECOMMENDATIONS.................................................5

       A. Security Assessment and Authorization .................................................................5 

       B. FIPS 199 Analysis ...................................................................................................5 

       C. System Security Plan ...............................................................................................5 

       D. Security Assessment Plan and Report .....................................................................6 

       E. Continuous Monitoring............................................................................................7 

       F. Contingency Planning and Contingency Plan Testing.............................................7 

       G. Privacy Impact Assessment .....................................................................................8 

       H. Plan of Action and Milestones Process....................................................................8 

       I. NIST 800-53 Evaluation ..........................................................................................9 


IV.    MAJOR CONTRIBUTORS TO THIS REPORT ..................................................10


       APPENDIX: Human Resources Solutions May 22, 2015 response to the draft report,
                 dated May 13, 2015.

       REPORT FRAUD, WASTE, AND MISMANAGEMENT
 IV. MAJOR CONTRIBUTORS
            I. BACKGROUND
                        TO THIS REPORT

On December 17, 2002, President Bush signed into law the E-Government Act (P.L. 107-347),
which includes Title III, the Federal Information Security Management Act (FISMA). It requires
(1) annual agency program reviews, (2) annual Inspector General (IG) evaluations, (3) agency
reporting to the U.S. Office of Management and Budget (OMB) the results of IG evaluations for
unclassified systems, and (4) an annual OMB report to Congress summarizing the material
received from agencies. In accordance with FISMA, we audited the information technology (IT)
security controls related to the U.S. Office of Personnel Management’s (OPM) USA
Performance (USAP) system.

The USAP system is one of OPM’s critical IT systems. As such, FISMA requires that the Office
of the Inspector General (OIG) perform an audit of IT security controls of this system, as well as
all of the agency’s systems, on a rotating basis.

The USAP system is a web-based application designed to assist Federal agencies in
implementing their Senior Executive Service (SES) and Non-SES performance management
program and systems. Agencies can develop performance plans, track and monitor employee’s
performance, provide feedback and ratings, and electronically sign off on performance plans.

OPM’s Human Resource Solutions - Performance Management Solutions is the program office
that owns the business processes supported by the USAP system. The Human Resources
Solutions (HRS) Information Technology (IT) Program Management Office (PMO) is the
organization responsible for the software development, maintenance, and technical operation of
this system. The HRS IT organization is part of OPM’s Office of the Chief Information Officer.

This was our first audit of the security controls surrounding the USAP system. We discussed the
results of our audit with USAP representatives at an exit conference.




                                                1                          Report No. 4A-HR-00-15-018
 IV. MAJOR CONTRIBUTORS
 II. OBJECTIVES, SCOPE, AND TO THIS REPORT
                            METHODOLOGY

Objective
Our objective was to perform an evaluation of the system’s security controls to ensure that 

USAP officials have managed the implementation of IT security policies and procedures in 

accordance with standards established by FISMA, the National Institute of Standards and 

Technology (NIST), the Federal Information System Controls Audit Manual (FISCAM) and 

OPM’s OCIO. 


The audit objective was accomplished by reviewing the degree to which a variety of security 

program elements have been implemented for the USAP system, including: 

 Security Assessment and Authorization (SA&A); 

 Federal Information Processing Standards (FIPS) 199 Analysis; 

 System Security Plan (SSP); 

 Security Assessment Plan and Report (SAP) and (SAR); 

 Security Control Self-Assessment; 

 Contingency Planning and Contingency Plan Testing; 

 Privacy Impact Assessment (PIA); 

 Plan of Action and Milestones Process (POA&M); and 

 NIST Special Publication (SP) 800-53 Revision 4 Security Controls. 


Scope and Methodology
This performance audit was conducted in accordance with Government Auditing Standards,
issued by the Comptroller General of the United States. Accordingly, the audit included an
evaluation of related policies and procedures, compliance tests, and other auditing procedures
that we considered necessary. The audit covered FISMA compliance efforts of officials
responsible for the USAP system, including IT security controls in place as of May 2015.

We considered the USAP system internal control structure in planning our audit procedures.
These procedures were mainly substantive in nature, although we did gain an understanding of
management procedures and controls to the extent necessary to achieve our audit objectives.

To accomplish our objective, we interviewed OPM representatives with the USAP system
security responsibilities, reviewed documentation and system screenshots, viewed
demonstrations of system capabilities, and conducted tests directly on the system. We also
reviewed relevant OPM IT policies and procedures, federal laws, OMB policies and guidance,
and NIST guidance. As appropriate, we conducted compliance tests to determine the extent to
which established controls and procedures are functioning as required.



                                                2                         Report No. 4A-HR-00-15-018
Details of the security controls protecting the confidentiality, integrity, and availability of the 

USAP system are located in the “Audit Findings and Recommendations” section of this report. 

Since our audit would not necessarily disclose all significant matters in the internal control 

structure, we do not express an opinion on the USAP system of internal controls taken as a 

whole. 


The criteria used in conducting this audit include: 


   OPM Information Security and Privacy Policy Handbook; 

   OMB Circular A-130, Appendix III, Security of Federal Automated Information Resources; 

   E-Government Act of 2002 (P.L. 107-347), Title III, Federal Information Security 

    Management Act of 2002;
   The Federal Information System Controls Audit Manual;
   NIST SP 800-12, An Introduction to Computer Security;
   NIST SP 800-18 Revision 1, Guide for Developing Security Plans for Federal Information
    Systems;
   NIST SP 800-30 Revision 1, Guide for Conducting Risk Assessments;
   NIST SP 800-34 Revision 1, Contingency Planning Guide for Federal Information Systems;
   NIST SP 800-37 Revision 1, Guide for Applying the Risk Management Framework to
    Federal Information Systems;
   NIST SP 800-53 Revision 4, Security and Privacy Controls for Federal Information Systems
    and Organizations;
   NIST SP 800-60 Revision 1, Guide for Mapping Types of Information and Information
    Systems to Security Categories;
   NIST SP 800-84, Guide to Test, Training, and Exercise Programs for IT Plans and
    Capabilities;
   FIPS Publication 199, Standards for Security Categorization of Federal Information and
    Information Systems; and
   Other criteria as appropriate.

In conducting the audit, we relied to varying degrees on computer-generated data. Due to time
constraints, we did not verify the reliability of the data generated by the various information
systems involved. However, nothing came to our attention during our audit testing utilizing the
computer-generated data to cause us to doubt its reliability. We believe that the data was
sufficient to achieve the audit objectives. Except as noted above, the audit was conducted in
accordance with generally accepted government auditing standards issued by the Comptroller
General of the United States.

The audit was performed by the OPM OIG, as established by the Inspector General Act of 1978,
as amended. The audit was conducted from November 2014 through June 2015 in OPM’s


                                                  3                          Report No. 4A-HR-00-15-018
Washington, D.C. office. This was our first audit of the security controls surrounding the USAP
system.

Compliance with Laws and Regulations
In conducting the audit, we performed tests to determine whether management by OCIO of the
USAP system is consistent with applicable standards. Nothing came to our attention during this
review to indicate that OCIO is in violation of relevant laws and regulations.




                                               4                         Report No. 4A-HR-00-15-018
  II. AUDIT FINDINGS AND RECOMMENDATIONS

A. Security Assessment & Authorization
  The SA&A of the USAP system was completed in June 2014.

  OPM’s Chief Information Security Officer and the system’s authorizing official signed the
  system’s authorization letter on June 26, 2014.

  NIST SP 800-37 Revision 1, Guide for Applying the Risk Management Framework to Federal
  Information Systems, provides guidance to federal agencies in meeting security accreditation
  requirements. The USAP system SA&A appears to have been conducted in compliance with
  NIST requirements.

B. FIPS 199 Analysis
  FIPS Publication 199, Standards for Security Categorization of Federal Information and
  Information Systems, requires federal agencies to categorize all federal information and
  information systems in order to provide appropriate levels of information security according to a
  range of risk levels.

  NIST SP 800-60 Volume II, Guide for Mapping Types of Information and Information Systems
  to Security Categories, provides an overview of the security objectives and impact levels
  identified in FIPS Publication 199.

  The USAP system FIPS Publication 199 Security Categorization analyzes information processed
  by the system and its corresponding potential impacts on confidentiality, integrity, and
  availability. The USAP system is categorized with a moderate impact level for confidentiality,
  moderate for integrity, moderate for availability, and an overall categorization of “moderate.”

  The security categorization of the USAP system appears to be consistent with FIPS Publication
  199 and NIST SP 800-60 requirements, and we agree with the categorization of “moderate.”

C. System Security Plan
  Federal agencies must implement on each information system the security controls outlined in
  NIST SP 800-53 Revision 4, Security and Privacy Controls for Federal Information systems and
  Organizations. NIST SP 800-18 Revision 1, Guide for Developing Security Plans for Federal
  Information Systems, requires that these controls be documented in a system security plan (SSP)
  for each system, and provides guidance for doing so.




                                                  5                         Report No. 4A-HR-00-15-018
  The SSP for the USAP system was created using the OCIO’s template that utilizes NIST SP 800-
  18 Revision 1 as guidance. The template requires that the following elements be documented 

  within the SSP: 

   System Name and Identifier; 

   System Categorization;

   System Owner; 

   Authorizing Official; 

   Other Designated Contacts; 

   Assignment of Security Responsibility; 

   System Operational Status; 

   Information System Type; 

   General Description/Purpose; 

   System Environment; 

   System Interconnection/Information Sharing; 

   Laws, Regulations, and Policies Affecting the System; 

   Security Control Selection; 

   Minimum Security Controls; and 

   Completion and Approval Dates. 


  We reviewed the USAP SSP and determined that it adequately addresses each of the elements 

  required by NIST. Nothing came to our attention to indicate that the USAP system security plan 

  has not been properly documented and approved. 


D. Security Assessment Plan and Report
  A Security Assessment Plan and a Security Assessment Report were completed for the USAP
  system in March 2014 and May 2014, respectively, as a part of the system’s SA&A process. The
  SAP and SAR were completed by a contractor that was operating independently from OPM. We
  reviewed the documents to verify that a risk assessment was conducted in accordance with NIST
  SP 800-30 Revision 1, Guide for Conducting Risk Assessments. We also verified that
  appropriate management, operational, and technical controls were tested for a system with a
  “moderate” security categorization according to NIST SP 800-53 Revision 4, Security and
  Privacy Controls for Federal Information Systems and Organizations.

  The SAP outlined the assessment approach, scanning authorization, and test methods. The SAR
  identified 23 control weaknesses; based on review of supplemental evidence provided by OPM,
  the security assessment team was able to close all 23 findings. All weakness identified were
  classified with a low or medium risk rating.




                                                 6                         Report No. 4A-HR-00-15-018
  We also reviewed the security assessment results table that contained the detailed results of the
  NIST SP 800-53 Revision 4 controls testing. The table confirmed that all 23 findings were
  closed as summarized in the SAR.

  Nothing came to our attention to indicate that the security controls of the USAP system have not
  been adequately tested by an independent source.

E. Continuous Monitoring
  OPM’s Information Security and Privacy Handbook states that continuous monitoring security
  reports must be provided to the OCIO’s Information Technology Security and Privacy Group
  (ITSP) at least semiannually. The OCIO also creates continuous monitoring plans each fiscal
  year that clearly describe the type and frequency of NIST SP 800-53 Revision 4 security controls
  that must be tested throughout the year.

  In FY 2015, HRS IT PMO submitted evidence of the USAP system continuous monitoring
  security control testing to the ITSP in a timely manner.

  Nothing came to our attention to indicate continuous monitoring activities related to the USAP
  system were not in compliance with OPM guidelines.

F. Contingency Planning and Contingency Plan Testing
  NIST SP 800-34 Revision 1, Contingency Planning Guide for Federal Information Systems,
  states that effective contingency planning, execution, and testing are essential to mitigate the risk
  of system and service unavailability. OPM’s security policies require all major applications to
  have viable and logical disaster recovery and contingency plans, and that these plans be annually
  reviewed, tested, and updated.

  Contingency Plan
  The USAP system contingency plan documents the functions, operations, and resources
  necessary to restore and resume the USAP system operations when unexpected events or
  disasters occur. The USAP system contingency plan adequately follows the format suggested by
  NIST SP 800-34 Revision 1 and contains the required elements.

  Contingency Plan Test
  NIST SP 800-34 Revision 1 provides guidance for testing contingency plans and documenting
  the results. Contingency plan testing is a critical element of a viable disaster recovery capability.

  A contingency plan test of the USAP system contingency plan was conducted in April 2014.
  The test involved restoring data and application source code to new equipment. The testing
  documentation contained adequate analysis and review of the test results.


                                                    7                          Report No. 4A-HR-00-15-018
  Nothing came to our attention to indicate the USAP system contingency plan has not been
  developed and tested in accordance with OPM policy.

G. Privacy Impact Assessment
  FISMA requires agencies to perform a screening of federal information systems to determine if a
  PIA is required for that system. OMB Memorandum M-03-22 outlines the necessary
  components of a PIA. The purpose of the assessment is to evaluate any vulnerabilities of privacy
  in information systems and to document any privacy issues that have been identified.

  The USAP program office completed an initial privacy screening or Privacy Threshold Analysis
  (PTA) of the USAP system and determined that a PIA is required for this system. A PIA was
  conducted during the systems SA&A and submitted to the Privacy Officer/ITSP for approval.
  However, the PIA for the USAP system has not yet been finalized and approved.

  According to OPM policy, a PIA must be conducted when a PTA indicates that a PIA is 

  required. Failure to conduct and approve a PIA increases the risk of sensitive data being 

  disclosed. 


  Recommendation 1
  We recommend that HRS and OCIO immediately finalize and obtain approval of the PIA for
  USAP in accordance with OPM policy.

  HRS Response:
  “in regards to ‘Recommendation 1 … to finalize and obtain approval of the Privacy Impact
  Assessment,’ a PIA was conducted during the USA Performance System Security Assessment
  and Authorization (SA&A), but was not approved at the time of the audit. The PIA is being
  finalized by the Information Technology Security and Privacy Group and should be approved
  shortly”

  OIG Reply:
  As part of the audit resolution process, HRS should provide evidence that the PIA has been
  approved by OPM’s Office of Internal Oversight and Compliance.

H. Plan of Action and Milestones Process
  A POA&M is a tool used to assist agencies in identifying, assessing, prioritizing, and monitoring
  the progress of corrective efforts for IT security weaknesses. OPM has implemented an agency-
  wide POA&M process to help track known IT security weaknesses associated with the agency’s
  information systems.




                                                  8                          Report No. 4A-HR-00-15-018
  We evaluated the USAP system POA&M and verified that it follows the format of OPM’s
  standard template and has been loaded into Trusted Agent, the OCIO’s POA&M tracking tool,
  for evaluation. Nothing came to our attention to indicate that there are any current weaknesses
  with the management of POA&Ms.

I. NIST SP 800-53 Evaluation
  NIST SP 800-53 Revision 4, Security and Privacy Controls for Federal Information Systems and
  Organizations, provides guidance for implementing a variety of security controls for information
  systems supporting the federal government. As part of this audit, we evaluated whether a subset
  of these controls had been implemented for the USAP system. We evaluated approximately 45
  security controls outlined in NIST SP 800-53 Revision 4 that were identified as being system
  specific or a hybrid control. Controls identified as common or inherited were omitted from
  testing because another system or program office is responsible for implementing the control.
  We tested one or more controls from each of the following control families:
   Access Control                                       Maintenance
   Awareness and Training                               Media Protection
   Audit and Accountability                             Physical and Environmental Protection
   Security Assessment and Authorization                Planning
   Configuration Management                             Risk Assessment
   Contingency Planning                                 System Services and Acquisition
   Identification and Authentication                    System and Communications Protection
   Incident Response                                    System and Information Integrity

  These controls were evaluated by interviewing individuals with the USAP system’s security
  responsibilities, reviewing documentation and system screenshots, viewing demonstrations of
  system capabilities and conducting tests directly on the system.

  We determined that all tested security controls appear to be in compliance with NIST SP 800-53
  Revision 4 requirements with the exception of the Privacy Impact Assessment issue identified in
  section G, above.




                                                  9                         Report No. 4A-HR-00-15-018
IV. MAJOR CONTRIBUTORS TO THIS REPORT

  Information Systems Audit Group

              , Auditor-In-Charge
            , IT Auditor
  ______________________________________________________________________________

                  , Group Chief




                                        10                   Report No. 4A-HR-00-15-018
                                          Appendix
                    UNITED STATES OFFICE OF PERSONNEL MANAGEMENT
                                   Washington, DC 20415




Human Resources 

   Solutions 


                                          May 22, 2015

MEMORANDUM FOR
                            Chief, Information Systems Audit Group
                            Office of the Inspector General

FROM:                       JOSEPH S. KENNEDY
                            Associate Director, Human Resources Solutions
                            USA Performance Authorizing Official

SUBJECT:                    Response to Draft Report "Audit of the Info1mation Technology
                            Security Controls of the OPM's USA Performance System (Report
                            No. 4A-HR-00-15-018)"

The OPM USA Performance Program Office acknowledges and appreciates the work of the
Office of Inspector General to evaluate the USA Performance System’s compliance with the
Federal Information Security Management Act (FISMA). This memorandum serves as an
official response to the draft report.
The audit had no major findings. However, in regards to “Recommendation 1 … to finalize and
obtain approval of the Privacy Impact Assessment,” a PIA was conducted during the USA
Performance System Security Assessment and Authorization (SA&A), but was not approved at
the time of the audit. The PIA is being finalized by the Information Technology Security and
Privacy Group and should be approved shortly.

HRS concurs with the audit outcome and has no other official comments.

cc:

Donna Seymour
Chief Information Officer

Janet Barnes
Director
Internal Oversight and Compliance


Senior Agency Information Security Officer
Office of the Chief Information Officer




                                                                            Report No. 4A-HR-00-15-018
USA Performance Program Manager
HR Solutions


Manager, Human Resources Solutions IT Program Management Office
Federal IT Business Solutions
Office of the Chief Information Officer

Paul Craven
Association CIO, Federal IT Business Solutions
Office of the Chief Information Officer


Software Quality Assurance Branch
Human Resources Solutions IT Program Management Office
Office of the Chief Information Officer




                                                                  Report No. 4A-HR-00-15-018
                                                                             




               Report Fraud, Waste, and 

                   Mismanagement 


                        Fraud, waste, and mismanagement in
                     Government concerns everyone: Office of
                         the Inspector General staff, agency
                      employees, and the general public. We
                    actively solicit allegations of any inefficient
                          and wasteful practices, fraud, and
                     mismanagement related to OPM programs
                    and operations. You can report allegations
                                to us in several ways:


     By Internet:        http://www.opm.gov/our-inspector-general/hotline-to-
                         report-fraud-waste-or-abuse


      By Phone:          Toll Free Number:                  (877) 499-7295
                         Washington Metro Area:             (202) 606-2423


        By Mail:         Office of the Inspector General
                         U.S. Office of Personnel Management
                         1900 E Street, NW
                         Room 6400
                         Washington, DC 20415-1100
  
                                                                             
                                                                             




                                                                       Report No. 4A-HR-00-15-018